Compliance Radar
Who was sanctioned, and for what?
Fines, court rulings and incidents from Europe, North America, Latin America, Asia-Pacific, Middle East and Africa: 2,207 cases from 44 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.
Click a bar to drill down one level.
Where?
by regionAll jurisdictions
- EU €312.4m 52 % · 42 cases
- United Kingdom €191.1m 32 % · 29 cases
- USA €71.3m 12 % · 12 cases
- Brazil €11.7m 2 % · 3 cases
- Singapore €10.3m 2 % · 4 cases
- Switzerland €5.37m 1 % · 3 cases
- Canada €1.56m 0 % · 20 cases
- Australia €730,384 0 % · 5 cases
- New Zealand €292,765 0 % · 2 cases
- Hong Kong €223,452 0 % · 5 cases
- 2 more€2,596
What for?
by area of lawAll areas of law
- Competition law €437.6m 72 % · 34 cases
- Bribery and corruption €69.5m 11 % · 6 cases
- Consumer protection and online retail €47.1m 8 % · 7 cases
- Sanctions and export control €27.2m 4 % · 7 cases
- Capital markets and financial supervision €8.3m 1 % · 4 cases
- Health and safety and employment law €7.27m 1 % · 22 cases
- Information security and cyber €5.06m 1 % · 3 cases
- Data protection €1.71m 0 % · 18 cases
- Money laundering and terrorist financing €894,152 0 % · 18 cases
- Environment and sustainability €251,420 0 % · 3 cases
- 1 more€0
Who?
by company- Anonymised companies €304.6m 50 % · 46 cases
- Barratt Redrow, Persimmon, Taylor Wimpey u. a. (7 Wohnungsbauunternehmen) €113.6m 19 % · 1 case
- AS Asphaltstraßensanierung GmbH, BITUNOVA GmbH, Kutter Spezialstraßenbau GmbH & Co. KG, Possehl Construction GmbH (inkl. VSI), Liesen…alles für den Bau GmbH, OAT GmbH/Otto Alte-Teigeler GmbH €60.3m 10 % · 1 case
- Colas Rail Asia Sdn Bhd (Colas-Gruppe) €29.7m 5 % · 1 case
- Allied Stone Inc. €10.6m 2 % · 1 case
- AS Asphaltstraßensanierung, BITUNOVA, Mainka u. a. (Straßenerhaltungskartell, 7 Unternehmen) €10.5m 2 % · 1 case
- Strukton Civiel Projecten B.V. und Strukton International B.V. (Strukton-Gruppe) €10m 2 % · 1 case
- Decora S.A., Bel-Pol sp. z o.o. €7.9m 1 % · 1 case
- Evolutions Flooring Inc. €7.48m 1 % · 1 case
- Tarkus Interiors Pte Ltd; Flex Connect Pte Ltd (vormals Facility Link Pte Ltd) €7.09m 1 % · 1 case
- 64 more€42.3m
When?
per year, by date of decision| Period | Cases | Total |
|---|---|---|
| 2022 | 10 | €42.5m |
| 2023 | 22 | €133.5m |
| 2024 | 26 | €139.3m |
| 2025 | 31 | €169.3m |
| 2026 | 38 | €120.3m |
127 cases
24 Sep 2026 M&J GroupCMA: fine against construction firm for concealing evidence during an inspection €29,075
During an inspection as part of an investigation into bid rigging, a work mobile phone and documents were removed from the premises on the instructions of a manager, and possession of a work mobile phone was denied. The UK Competition and Markets Authority (CMA) imposed a fine of 25,000 GBP on M&J.
Dawn raid training is mandatory: removing mobile phones or documents during an inspection obstructs the investigation, even when acting on instructions.
Correct conduct during inspections (dawn raids), no removal of evidence
- Authority / court
- Competition and Markets Authority (CMA)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Section 40A(1) Competition Act 1998
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Culpability
- intentional
- Liability of senior managers
- Measures against individuals are not reported here.
- Published
- 24 Sep 2026
Original amount 25,000 GBP, converted at the ECB reference rate of 24 Sep 2026.
- CMA, Pressemitteilung zu M&J Group (Entscheidung 2025) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
22 Sep 2026 Carioca Christiani-Nielsen Engenharia S.A.Carioca Engenharia pays 6.13 million BRL in CADE settlement on construction tenders €1.04m
Carioca Christiani-Nielsen Engenharia S.A. concluded a single settlement (Termo de Compromisso de Cessação) with the Conselho Administrativo de Defesa Econômica (CADE, Brazilian competition authority) covering four proceedings concerning alleged collusion in public tenders for infrastructure projects (metro, airports operated by Infraero, the rail company CPTM and the transport authority DNIT). The company admitted its participation, allegedly pays 6,134,676.92 BRL in instalments to the Fund for Diffuse Rights (FDD) and waives court and administrative disputes on these matters. Together with the company’s earlier settlements with CADE, its contributions exceed 90 million BRL.
A settlement covering all pending cartel cases creates legal certainty but requires an admission, payment and full cooperation.
Bid rigging in public construction contracts
- Authority / court
- Conselho Administrativo de Defesa Econômica (CADE)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Lei nº 12.529/2011 (Lei de Defesa da Concorrência), Termo de Compromisso de Cessação
- Action
- Other
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 22 Sep 2026
Original amount 6,134,676.92 BRL, converted at the ECB reference rate of 22 Sep 2026.
- CADE – Cade celebra acordo com construtora em quatro investigações de cartel (22.09.2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
16 Sep 2026 Hillbeck Homes (Sowerby Bridge) LtdDeveloper pays £300,000 after agency worker falls through unprotected stairwell opening €349,895
A 24-year-old labourer working as a temporary worker for a scaffolding company fell, in his second week of work on the developer's housing site, through a stairwell opening that was neither securely covered nor guarded, dropping one storey onto concrete and suffering serious spinal injuries. The court found the company guilty on three counts because it had neither adequately planned nor supervised work at height and had not taken suitable measures to prevent falls. Fine of £300,000 plus costs. The company is a micro-enterprise with fewer than 10 employees.
Floor openings on construction sites must be covered with load-bearing covers or guarded at all times – new and temporary workers in particular do not know where the hazards are.
Fall protection at openings; induction of new workers
- Authority / court
- Leeds Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Work at Height Regulations 2005
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Employees
- Under 50
- Published
- 21 Sep 2026
Original amount 300,000 GBP, converted at the ECB reference rate of 16 Sep 2026.
- Construction company fined after 24-year-old father falls through unprotected stairwell opening (HSE) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
4 Sep 2026 In Construction LimitedHong Kong: HKD 640,000 fine for In Construction after fatal crane accident €70,237
In Construction was fined HKD 640,000 for breaches of the Factories and Industrial Undertakings Ordinance and the regulations on lifting appliances and safety management. On a foundation construction site in Tai Po on 30 September 2025, a female worker had been trapped between the rear end of a slewing crawler crane and the railing of a steel platform and later died.
A crane's slewing zone must be cordoned off, especially on confined platforms where railings create a crushing point.
Securing the danger zone of slewing cranes
- Authority / court
- Shatin Magistrates' Courts, Hongkong (Anklage: Labour Department)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Factories and Industrial Undertakings Ordinance; Factories and Industrial Undertakings (Lifting Appliances and Lifting Gear) Regulations; Factories and Industrial Undertakings (Safety Management) Regulation
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 4 Sep 2026
Original amount 640,000 HKD, converted at the ECB reference rate of 4 Sep 2026.
- Contractor fined for violation of safety legislation (4 September 2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
3 Sep 2026 BDW Trading (Barratt Redrow)Barratt Redrow subsidiary BDW pays 201,500 GBP to environmental projects after silt entered brooks €234,153
At the Ladden Garden Village construction site in Yate, a subcontractor washed silt from the site drainage into two brooks over six days in July 2022. The Environment Agency accepted an Enforcement Undertaking: BDW is paying 201,500 GBP to three environmental and charitable projects, bears the investigation costs and had already invested over 180,000 GBP in remediation, training and improved surface water management. According to the annual accounts filed with the UK companies register for financial year 2025, the company had around 5,217 employees.
Developers are liable for environmental damage caused by their subcontractors; clear procedures and training on handling surface water prevent costly proceedings.
Protecting watercourses on construction sites and managing subcontractors
Missing or inadequate training played a role in the decision.
- Authority / court
- Environment Agency
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- Environmental Civil Sanctions (England) Order 2010 (Enforcement Undertaking)
- Action
- Other
- Status of proceedings
- final
- Sector
- Construction and real estate
- Employees
- 1,000 to 9,999
- Mitigating circumstances
- Acceptance of responsibility, remediation, training of employees and application for a discharge permit.
- Published
- 3 Sep 2026
Original amount 201,500 GBP, converted at the ECB reference rate of 3 Sep 2026.
- Builder pays £201,500 to charities after silting watercourses Press release of an authority
- Companies House: Registereintrag BDW Trading Limited (03018173) Official register or notice
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
20 Aug 2026 Grace Motors Limited (Grace Construction)Grace Construction: 38,500 NZD for working at height despite a prohibition notice €19,586
At a site for two-storey residential units in Kelston (Auckland), workers were working on the upper floor without adequate fall protection, and the site also had temporary platforms, partially removed scaffolding and unsecured ladders; WorkSafe (New Zealand's workplace health and safety regulator) therefore prohibited work at height on the second floor by a prohibition notice on 30 August 2024. Because work continued there on 2 and 4 September 2024 nonetheless, the Waitakere District Court imposed a fine of 38,500 NZD on 20 August 2026, plus costs of 1,099.10 NZD.
A prohibition notice means an immediate stop to the work – site management must actively enforce it until the risk has demonstrably been remedied.
Fall protection and compliance with regulatory stop-work orders
- Authority / court
- Waitakere District Court (Anklage: WorkSafe New Zealand)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Health and Safety at Work Act 2015, s 107(1), (2)(b)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Liability of senior managers
- The prohibition notice had been issued to one of the directors.
- Published
- 4 Sep 2026
Original amount 38,500 NZD, converted at the ECB reference rate of 20 Aug 2026.
- WorkSafe New Zealand: Company falls short after ignoring WorkSafe notice (04.09.2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
19 Aug 2026 Sioux Erosion Control Inc.DOJ: jury convicts erosion control firm of price fixing in Oklahoma road construction –
A jury found Sioux Erosion Control guilty of having fixed prices for erosion control services, allocated contracts regionally and rigged bids on publicly funded road construction projects in Oklahoma (more than 100 million USD) from 2017 to 2023. Sentencing was still pending; the decision is not final.
Subcontractors in public road construction are also targeted by prosecutors.
Price-fixing and territorial agreements for subcontracted services in road construction
- Authority / court
- U.S. Department of Justice, Antitrust Division
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Section 1 Sherman Act
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Liability of senior managers
- Measures against individuals are not reported here.
- Published
- 20 Aug 2026
- U.S. Department of Justice, Pressemitteilung zu Sioux Erosion Control (Entscheidung 2026) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Direct link
Report an error
13 Aug 2026 „О-Рент“ ЕООД (sowie „Инжконсулт“ ЕООД und „Земекоп“ ЕООД)Construction machinery cartel: fine for O-Rent, compliance programme for all participants €2,403
The Комисия за защита на конкуренцията (Bulgarian Commission for the Protection of Competition, KZK) found a cartel in public tenders for mining and construction machinery (price fixing and market sharing, Art. 15 ZZK – Bulgarian Protection of Competition Act, Art. 101 TFEU). Inzhkonsult and Zemekop, as a single undertaking, were exempted from the fine; O-Rent received a sanction of 2,403.07 EUR. All three companies must introduce a competition law compliance programme within 60 days and report on it.
The authority now expressly requires compliance programmes – anyone bidding in tenders should have one before it is ordered.
Competition law in tenders; compliance programme
- Authority / court
- Комисия за защита на конкуренцията (КЗК, Bulgarische Wettbewerbskommission)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Art. 15 Abs. 1 Nr. 1 und 2 ZZK; Art. 101 Abs. 1 lit. a und c AEUV
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Mitigating circumstances
- Immunity from fines for two participants (leniency programme)
- Published
- 20 Aug 2026
- КЗК Публичен електронен регистър – Производство (Решение № 797 от 13.08.2026; Volltext als PDF im Register) Official register or notice
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
6 Aug 2026 AS Asphaltstraßensanierung GmbH, BITUNOVA GmbH, Kutter Spezialstraßenbau GmbH & Co. KG, Possehl Construction GmbH (inkl. VSI), Liesen…alles für den Bau GmbH, OAT GmbH/Otto Alte-Teigeler GmbHBundeskartellamt: 60.3 million EUR against DSK road repair cartel €60.3m
From around 2010 to September 2019, six suppliers of thin cold-laid asphalt surface layers (Dünne Asphaltdeckschichten in Kaltbauweise, DSK) allocated customers – primarily public contracting authorities – and contracts among themselves nationwide and coordinated prices. Germany's Federal Cartel Office (Bundeskartellamt) imposed fines of around 60.3 million EUR; all proceedings ended in settlements.
Anyone who "shares out" public contracts regionally risks fines running into millions – calculations and bids must always be prepared independently.
Customer allocation and bid rigging in public contracts
- Authority / court
- Bundeskartellamt
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- § 1 GWB, Art. 101 AEUV
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Mitigating circumstances
- Leniency bonus for Possehl/VSI, Bitunova, Kutter and AS; settlement
- Published
- 6 Aug 2026
- Bußgelder wegen Kartellabsprachen im Bereich Straßenreparatur mit DSK Press release of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
31 Jul 2026 Whitemountain Quarries Limited€1.2m fine for Whitemountain Quarries after fatal roadworks incident €1.2m
At roadworks on the R238 in Donegal in August 2020, one wheel of a car dropped onto the unfinished hard shoulder; when the driver steered back, the car slid on the freshly laid surface and went into Lough Foyle; three occupants drowned and one was injured, and appropriate temporary traffic management was lacking. The company pleaded guilty to breaching its duties towards non-employees under s. 12 of the Safety, Health and Welfare at Work Act 2005 and was fined €1,200,000.
Employers at roadworks in public spaces are also liable for the safety of third parties; signage and guidance measures must remain adequate until the works are finished.
- Authority / court
- Letterkenny Circuit Criminal Court (Anklage: Health and Safety Authority)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- s. 12 i. V. m. s. 77(9)(a) Safety, Health and Welfare at Work Act 2005
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 31 Jul 2026
- HSA: Whitemountain Quarries Limited fined €1.2 million after fatal roadworks incident claimed three lives (31.07.2026) Press release of an authority
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
23 Jul 2026 Orchids Builders LLCFlorida roofer: OSHA proposes $349,754 over allegedly repeated lack of fall protection €307,017
According to the U.S. Occupational Safety and Health Administration (OSHA), inspectors found on 21 January and 10 March 2026 at two residential construction sites in Rockledge that employees of the roofing contractor were working on roofs without fall protection; training records, eye protection when using nail guns and ladders extending sufficiently above the roof edge were also missing. The company had been inspected seven times since 2023, each time with citations for fall protection. OSHA proposed penalties of $349,754 (2 violations classified as wilful, 4 as repeat); the violations are alleged and may be contested.
Companies that allow the same fall hazards to recur after earlier inspections risk classification as a repeat or wilful violation with substantially higher penalties.
Fall protection during roofing work
Missing or inadequate training played a role in the decision.
- Authority / court
- U.S. Department of Labor – Occupational Safety and Health Administration (OSHA)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- 29 CFR 1926 Subpart M (Fall Protection), Subpart X (Ladders)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Culpability
- intentional
- Repeat case
- yes
- Published
- 23 Jul 2026
Original amount 349,754 USD, converted at the ECB reference rate of 23 Jul 2026.
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
21 Jul 2026 Dragon Alfa Cement LimitedCement plant with 12 employees: 1 million GBP after fatal accident at unguarded machinery €1.17m
In 2021 a 35-year-old employee was crushed by a 1.6-tonne concrete weight at the cement bagging plant in Sharpness. A large section of the perimeter fencing had routinely been removed over a prolonged period, leaving dangerous moving parts freely accessible. The company – with 12 employees according to its 2024 annual accounts – was fined 1 million GBP plus 9,621 GBP in costs.
Treat removed guard fencing as a management failure and stop it – tolerating permanently open danger zones can lead to fines in the millions, even for a small business.
- Authority / court
- Bristol Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 2(1) Health and Safety at Work etc. Act 1974
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Employees
- Under 50
- Published
- 21 Jul 2026
Original amount 1,000,000 GBP, converted at the ECB reference rate of 21 Jul 2026.
- Cement company fined £1,000,000 after father crushed by 1.6 tonne concrete weight (HSE) Press release of an authority
- Companies House: Registereintrag Dragon Alfa Cement Limited (03473666) Official register or notice
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
16 Jun 2026 SCS Railways (Joint Venture von Skanska Construction UK Limited, Costain Limited und Strabag AG)HS2 joint venture SCS Railways: £400,000 fine after tipper truck fall €462,583
SCS Railways, a joint venture of Skanska, Costain and Strabag on the HS2 rail project, was fined £400,000 and ordered to pay £8,974 in costs. On 27 July 2021 at the Copthall North site near Uxbridge, a 20-tonne tipper truck belonging to a contracted haulage company fell from an excavation ramp and the driver was injured. The Health and Safety Executive found neither signage nor edge protection on the vehicle routes; a traffic route changed on the morning of the incident had left an unprotected edge and had been neither properly planned nor communicated in time.
Every short-notice change to site vehicle routes needs a risk check and immediate briefing of all drivers.
Traffic routes and change management on major construction sites
- Authority / court
- Uxbridge Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 3(1) Health and Safety at Work etc. Act 1974
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Mitigating circumstances
- Guilty plea.
- Published
- 26 Jun 2026
Original amount 400,000 GBP, converted at the ECB reference rate of 16 Jun 2026.
- HSE: HS2 contractor fined £400,000 after tipper truck driver injured (26.06.2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
9 Jun 2026 Leader Properties Investment Pty LtdNSW: property manager Leader Properties penalised for unlawfully locking out a tenant €13,422
NSW Fair Trading (the consumer protection regulator of New South Wales) reprimanded Leader Properties Investment Pty Ltd on 9 June 2026 and imposed a monetary penalty of 22,000 AUD because it had locked out a tenant and unlawfully taken possession of the rented home in breach of the Residential Tenancies Act 2010. All licensed agents of the company who provide property management must complete tenancy training. Measures against individuals are not set out here.
Property managers must never lock out tenants on their own authority; evictions only go through the statutory process, and staff must know this.
Tenancy law in property management: no self-help evictions or lockouts
Missing or inadequate training played a role in the decision.
- Authority / court
- NSW Fair Trading
- Area of law
- Consumer protection and online retail
- Legal basis
- Property and Stock Agents Act 2002 (NSW), s 192(1)(a), (c) und (d); Verstoß gegen den Residential Tenancies Act 2010 (NSW)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Liability of senior managers
- Measures against individuals are not set out here.
- Published
- 25 Jun 2026
Original amount 22,000 AUD, converted at the ECB reference rate of 9 Jun 2026.
- NSW Fair Trading Name and Shame Register: Leader Properties Investment Pty Ltd, Disciplinary Action, Penalty amount $22,000.00, 09/06/2026 Official register or notice
- Verify NSW (amtliches Lizenzregister), Lizenz 1687033, Leader Properties Investment Pty Ltd – Disziplinarmaßnahmen vom 09.06.2026 (JSON) Official register or notice
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
9 Jun 2026 Deutsche Wohnen SELG Berlin I confirms GDPR infringement by Deutsche Wohnen through tenant archive without deletion function Fine
In 2019, the Berlin Commissioner for Data Protection and Freedom of Information (BlnBDI) had imposed 14.5 million EUR on the housing group because tenant data such as salary statements, bank statements and social security data were held in an archive system with no means of deletion. Following the 2023 CJEU judgment on direct corporate liability, the Berlin Regional Court (Landgericht Berlin I) confirmed on 9 June 2026 infringements of data minimisation and storage limitation; the press release does not state the amount of the fine set by the court.
Ensure that archive and filing systems can technically implement deletion periods from the outset – ‘privacy by design’ is subject to fines.
- Authority / court
- Landgericht Berlin I (Bußgeldbehörde: Berliner Beauftragte für Datenschutz und Informationsfreiheit)
- Area of law
- Data protection · Data breaches and data security
- Legal basis
- Art. 5, Art. 25 Abs. 1 DSGVO
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Liability of senior managers
- According to the CJEU (C-807/21), a breach of duty by a person in a management position need not be proven for the corporate fine.
- Published
- 10 Jun 2026
- Landgericht Berlin bestätigt Verstoß der Deutsche Wohnen SE gegen die DSGVO Press release of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
28 May 2026 Thermotech Wall and Loft Surveys LtdICO: £240,000 fine for Thermotech over marketing calls to TPS numbers €276,928
The ICO fined Thermotech Wall and Loft Surveys Ltd £240,000 and issued an enforcement notice. After executing a search warrant in April 2025, the regulator found that between October 2024 and March 2025 the company had instigated 575,062 unsolicited marketing calls to numbers that had been on the TPS register for more than 28 days. There were 132 complaints. The legal basis is regulations 21 and 24 of PECR.
- Authority / court
- Information Commissioner's Office (ICO)
- Area of law
- Data protection · Marketing and consent
- Legal basis
- Regulations 21 und 24 PECR; section 55A DPA 1998
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
Original amount 240,000 GBP, converted at the ECB reference rate of 28 May 2026.
- ICO Enforcement: Thermotech Wall and Loft Surveys Ltd (MPN). Enthält Informationen des Information Commissioner's Office, lizenziert unter der Open Government Licence v3.0. Enforcement database of an authority
- Monetary Penalty Notice: Thermotech Wall and Loft Surveys Ltd (28 May 2026) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
28 May 2026 Timmerhuis Weg & Waterbouw B.V., Bouwhuis Aannemingsmaatschappij „Bouwmij“ B.V., Aannemingsmaatschappij Van Gelder B.V.ACM: cartel fines on construction firms for bid rigging in an Ommen tender €45,500
In September 2024 three construction companies coordinated their bid prices and decided the winner in a civil engineering tender of the municipality of Ommen, which was awarded for 153,250 EUR. Because of earlier cartel infringements by the companies or their legal predecessors established in 2005, the ACM (Autoriteit Consument & Markt, Dutch competition and consumer authority) increased the fines by 20%. In the simplified procedure it imposed allegedly 30,000 EUR on Timmerhuis and allegedly 15,500 EUR on Bouwhuis (45,500 EUR in total); Van Gelder, as first leniency applicant, was not fined.
Bids in procurement procedures must be prepared independently; even agreeing the winner of a small municipal contract is sanctioned.
Bid rigging in public tenders
- Authority / court
- Autoriteit Consument & Markt (ACM)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Art. 6 Abs. 1 Mededingingswet
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Repeat case
- yes
- Mitigating circumstances
- For cooperating in the simplified procedure, the ACM reduced the fines of Bouwhuis and Timmerhuis by 15%, and that of Timmerhuis by a further 5% for evidence provided voluntarily; Van Gelder, as first applicant, received full leniency immunity.
- Published
- 2 Jun 2026
- ACM – Boetebesluit vervalsing GWW-aanbesteding (Beslisdatum 28-05-2026) Decision of an authority
- ACM – Boetebesluit vervalsing GWW-aanbesteding gemeente Ommen Decision of an authority
- ACM – ACM legt kartelboetes op voor vervalsing GWW-aanbesteding (02-06-2026) Press release of an authority
Checked against the official source on 4 Oct 2026 · Direct link
Report an error
22 May 2026 China Harbour Engineering Company LimitedChina Harbour Engineering: 78,000 HKD for discharge into water control zone €8,584
In April 2026 China Harbour Engineering Company Limited was fined 78,000 HKD at the Eastern Magistrates' Courts (a Hong Kong magistrates' court) under the Water Pollution Control Ordinance (Hong Kong's water pollution law) because the company had discharged waste or polluting matter into a water control zone on 14 July 2025; the prosecution was brought by the Environmental Protection Department (Hong Kong's environmental authority). It was the highest fine among the 40 environmental convictions the department published for April 2026.
Discharges into waters must be authorised in advance and monitored continuously – a single incident is enough for a criminal conviction in Hong Kong.
Water protection and authorised discharges
- Authority / court
- Eastern Magistrates' Courts, Hongkong (Anklage: Environmental Protection Department)
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- Water Pollution Control Ordinance (Einleitung von Abfall oder verunreinigenden Stoffen in eine water control zone)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 22 May 2026
Original amount 78,000 HKD, converted at the ECB reference rate of 22 May 2026.
- Environmental Protection Department: EPD convictions in April (2026) – Liste der Verurteilungen Enforcement database of an authority
- HKSAR Government (EPD): EPD convictions in April (22.05.2026) Press release of an authority
- Environmental Protection Department: EPD convictions in April Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
4 May 2026 Decora S.A., Bel-Pol sp. z o.o.Decora and Bel-Pol: PLN 33.6m for price and territory agreements on flooring accessories €7.9m
The manufacturer Decora and the wholesaler Bel-Pol had coordinated prices for vinyl panels, underlays, skirting boards and floor profiles from Decora's range and divided the wholesale market for these products. UOKiK imposed fines of PLN 28,344,000 on Decora and PLN 5,290,000 on Bel-Pol, PLN 33,634,000 in total. The decision is not final.
Vertical agreements on prices and territories in wholesale are hardcore restrictions.
Price and territory agreements between manufacturer and wholesaler
- Authority / court
- Prezes Urzędu Ochrony Konkurencji i Konsumentów (UOKiK)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Art. 6 Abs. 1 Nr. 1 und 3 ustawa o ochronie konkurencji i konsumentów; Art. 101 Abs. 1 lit. a und c AEUV; Art. 106 Abs. 1 Nr. 1 und 2, Art. 113c und Art. 89a ustawa o ochronie konkurencji i konsumentów
- Action
- Fine
- Status of proceedings
- under appeal
- Sector
- Construction and real estate
- Mitigating circumstances
- As a leniency applicant, Bel-Pol received a 50% reduction of its fine and a further 10% for voluntarily accepting the fine (settlement).
- Liability of senior managers
- Measures against individuals are not reported here.
Original amount 33,634,000 PLN, converted at the ECB reference rate of 4 May 2026.
- UOKiK-Entscheidungsdatenbank: Decyzja DOK-2/2026 (Decora S.A., Bel-Pol sp. z o.o.) Enforcement database of an authority
- Decyzja nr DOK-2/2026 vom 04.05.2026 (öffentliche Fassung) Decision of an authority
Checked against the official source on 28 Sep 2026 · Direct link
Report an error
24 Apr 2026 White Ray Oakleigh Pty Ltd (Ray White Oakleigh)Federal Court: 600,000 AUD against former operator of Ray White Oakleigh for underquoting €366,010
Following action by Consumer Affairs Victoria (the consumer protection regulator of the state of Victoria), the Federal Court of Australia ordered White Ray Oakleigh Pty Ltd, former operator of the Ray White Oakleigh agency, to pay 600,000 AUD because between February 2022 and November 2023 it advertised nine properties well below market value and at prices it did not itself expect to achieve (underquoting). According to the regulator, the agency agreements often provided for considerably higher commission on proceeds above the reserve price, and vendors were persuaded to lower their reserves after signing; text messages between the agents showed that they expected considerably higher prices. The court found misleading or deceptive conduct and false or misleading representations.
Prices in property advertising must reflect the agent's genuine estimate; commission models that reward bait pricing are a compliance risk in their own right.
Truthful price information in property advertising (underquoting)
- Authority / court
- Consumer Affairs Victoria / Federal Court of Australia
- Area of law
- Consumer protection and online retail · Misleading advertising and pricing
- Legal basis
- Irreführendes Verhalten sowie falsche oder irreführende Angaben (Vorschriften in der Mitteilung nicht genannt)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Culpability
- intentional
- Mitigating circumstances
- The company admitted the conduct and cooperated with the regulator in the court proceedings; it has not operated the agency since 2025.
- Published
- 24 Apr 2026
Original amount 600,000 AUD, converted at the ECB reference rate of 24 Apr 2026.
- Consumer Affairs Victoria: Company to pay $600,000 for underquoting (24.04.2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
21 Apr 2026 Gwalimba Construction (Pty) LtdAlleged collusion on a government job: Gwalimba Construction allegedly pays ZAR 50,000 €2,596
On 21 April 2026 the Competition Tribunal (South Africa's competition adjudicator) confirmed a settlement with Gwalimba Construction (Pty) Ltd. Following a complaint by the Department of Home Affairs (home affairs ministry), the Competition Commission (competition authority) had found that Gwalimba and Superway Construction (Pty) Ltd agreed not to compete against each other on certain tenders – including a request for quotes for fire-compliance repair work at a government office in Pretoria. Without admitting liability, Gwalimba allegedly pays an administrative penalty of 50,000 ZAR, will cooperate in the case against Superway and will introduce a competition law compliance programme.
Even small construction firms must avoid any coordination with competitors when quoting to public bodies – authorities pursue such arrangements against small firms too.
Bid rigging in public procurement
- Authority / court
- Competition Tribunal of South Africa (auf Antrag der Competition Commission)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Section 4(1)(b)(i), (ii) und (iii) Competition Act 89 of 1998
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Repeat case
- no
- Mitigating circumstances
- According to the parties: cooperation with the authority, a small firm with no previous contraventions, and it did not win the contract.
- Published
- 23 Apr 2026
Original amount 50,000 ZAR, converted at the ECB reference rate of 21 Apr 2026.
- Competition Tribunal: Press Release: Tribunal confirms settlement of alleged collusion by Gwalimba Construction in public sector collusive tendering case (23.04.2026) Court press release
- Competition Tribunal, CO107Oct25, Order confirming consent agreement Competition Commission v Gwalimba Construction (Pty) Ltd, decided 21.04.2026 Court decision
- Competition Tribunal case file CO107Oct25 (Order date 2026-04-21; sections 4(1)(b)(i), (ii), (iii)) Official register or notice
Checked against the official source on 4 Oct 2026 · Direct link
Report an error
14 Apr 2026 Sun Shine Decoration Limited, Wai Tat Aluminium & Glass Engineering Company LimitedHong Kong: HKD 730,000 in fines for two contractors after fatal fall €79,028
The court fined Sun Shine Decoration HKD 500,000 and Wai Tat Aluminium & Glass Engineering HKD 230,000, HKD 730,000 in total, for breaches of the Factories and Industrial Undertakings Ordinance and the Construction Sites (Safety) Regulations. The case arose from a fatal accident on 16 May 2025 at a house in Kwu Tung, in which a worker fell into the swimming pool of the neighbouring house while fixing insulation boards on a metal canopy.
Work on roofs and canopies requires fall protection planned in advance, even at residential houses, and every company involved can be held liable for breaches.
Fall protection when working on roofs and canopies
- Authority / court
- Fanling Magistrates' Courts, Hongkong (Anklage: Labour Department)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Factories and Industrial Undertakings Ordinance; Construction Sites (Safety) Regulations
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 14 Apr 2026
Original amount 730,000 HKD, converted at the ECB reference rate of 14 Apr 2026.
- Contractors fined for violation of safety legislation (14 April 2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
8 Apr 2026 Alquiler Seguro, S.A.U.Consumer ministry: €3.6m fine on Alquiler Seguro over charges imposed on tenants €3.6m
The Ministerio de Derechos Sociales, Consumo y Agenda 2030 (Spanish Ministry of Social Rights, Consumer Affairs and 2030 Agenda) imposed fines totalling 3,600,902 EUR (1,000,000, 990,900, three times 500,000, 100,001 and 10,001 EUR) on the rental agency Alquiler Seguro for six very serious and one serious breach of tenants' consumer rights. Among other things, the company had required tenants to pay for a tenant service as management and contract costs, to take out home insurance for the landlord's benefit and to bear debt collection and court costs, used a clause allowing reporting to debtor registers and excluded the right of withdrawal. The clauses must be removed and the sanction published.
Agents must not pass management and signing costs on to tenants through mandatory services or add-on contracts; standard clauses in tenancy agreements should be reviewed regularly.
Unfair terms and charges in tenancy agreements
- Authority / court
- Ministerio de Derechos Sociales, Consumo y Agenda 2030
- Area of law
- Consumer protection and online retail
- Legal basis
- Verbraucherschutzrecht (in der Pressemitteilung nicht einzeln zitiert); Ley 12/2023, de 24 de mayo, por el derecho a la vivienda (Verbot, Verwaltungs- und Vertragskosten auf Mieter abzuwälzen)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 8 Apr 2026
- Consumo multa con 3,6 millones de euros a Alquiler Seguro por prácticas abusivas contra sus inquilinos (08.04.2026) Press release of an authority
Checked against the official source on 28 Sep 2026 · Direct link
Report an error
7 Apr 2026 Wspólnota Mieszkaniowa K. (Wohnungseigentümergemeinschaft, im Bescheid pseudonymisiert)Homeowners’ association: 4,852 PLN – misdirected statement not notified €1,135
Acting as processor, the property management company sent an owner’s statement of service charges to an unauthorised person. The association considered notification unnecessary because only ‘ordinary’ data of one member were affected, and maintained this position in the proceedings; the UODO (Poland’s data protection authority) imposed 4,852 PLN.
Small controllers must also assess and notify data breaches by their service providers – ‘only one data subject’ is no ground for exemption.
Recognising misdirected mail as a data breach – including at service providers
- Authority / court
- Prezes Urzędu Ochrony Danych Osobowych (UODO)
- Area of law
- Information security and cyber · Incident reporting obligations
- Legal basis
- Art. 33 Abs. 1 DSGVO
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
Original amount 4,852 PLN, converted at the ECB reference rate of 7 Apr 2026.
- UODO, Decyzja DKN.5131.16.2025 vom 07.04.2026 (rechtskräftig) Decision of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
1 Apr 2026 The Management Corporation – Strata Title Plan No. 4869 (Riverfront Residences)MCST 4869: directions over lack of data protection instructions to managing agent Order
The management corporation of the Riverfront Residences condominium had not designated a data protection officer until March 2025, had no data protection policies of its own and had given its managing agent, which acted for it as a data intermediary, no instructions on handling personal data; in April 2025 an employee of the managing agent mistakenly sent the names, addresses and maintenance fee details of two owners to another owner. The Personal Data Protection Commission (PDPC, Singapore's data protection authority) found breaches of the Accountability Obligation and the Protection Obligation; by contrast, it found no breach in the circulation of a requisition for an extraordinary general meeting bearing the names and signatures of 303 owners, because strata management law prevailed. It directed the corporation to introduce, within 90 days, policies and procedures for the processing of data by the managing agent and to communicate them to it; the managing agent itself had given a voluntary undertaking.
Anyone who outsources management to a service provider remains responsible and needs their own data protection officer, their own policies and specific instructions to the provider.
Check recipients before sending, protect sensitive attachments and give service providers clear instructions
- Authority / court
- Personal Data Protection Commission (PDPC)
- Area of law
- Data protection · Data processors
- Legal basis
- Sections 11(3) und 12(a) PDPA 2012 (Accountability Obligation); Section 24 i. V. m. Section 4(3) PDPA (Protection Obligation bei Einsatz eines Data Intermediary)
- Action
- Order
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 7 May 2026
- PDPC – Enforcement Decisions: Breach of the Accountability and Protection Obligations by MCST 4869 (veröffentlicht 07.05.2026) Enforcement database of an authority
- PDPC – Decision [2026] SGPDPC 1, The Management Corporation – Strata Title Plan No. 4869, Case No. DP-2503-C3469 (01.04.2026), PDF Decision of an authority
Checked against the official source on 4 Oct 2026 · Direct link
Report an error
19 Mar 2026 Colas Rail Asia Sdn Bhd (Colas-Gruppe)Colas Rail Asia: CJIP of 29.7 million EUR over bribery in metro contracts in Malaysia €29.7m
The Malaysian subsidiary of Colas Rail paid large, undocumented sums via intermediaries in connection with public contracts for urban rail lines in Kuala Lumpur (Kelana Jaya extension, MRT2). Following an internal investigation, Colas Rail self-reported the matter in 2017; the CJIP (Convention judiciaire d'intérêt public, a French deferred prosecution agreement) provides for a public interest fine of 29,745,974 EUR and a three-year compliance programme monitored by the French Anti-Corruption Agency (AFA) (costs of up to 1.9 million EUR).
Undocumented payments to intermediaries on foreign projects must be stopped early by the finance and compliance functions – self-reporting after an internal investigation is rewarded.
Intermediaries and consultants in public tenders
- Authority / court
- Parquet national financier (PNF); Validierung durch den Präsidenten des Tribunal judiciaire de Paris
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale (CJIP); Bestechung ausländischer Amtsträger
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Employees
- 10,000 or more
- Culpability
- intentional
- Mitigating circumstances
- Self-report (criminal complaint filed by Colas Rail on 31 May 2017) following an internal forensic investigation.
- Liability of senior managers
- The CJIP does not address the criminal liability of natural persons.
- Published
- 19 Mar 2026
- Communiqué de presse du procureur de la République financier – CJIP COLAS RAIL ASIA Press release of an authority
- Convention judiciaire d'intérêt public – COLAS RAIL ASIA (17.03.2026) Decision of an authority
- Ministère de la Justice: Conventions judiciaires d'intérêt public (Verzeichnis) Official register or notice
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
23 Feb 2026 Chevalier (Construction) Company LimitedHong Kong: HKD 80,000 fine for Chevalier (Construction) for breaching a noise permit €8,683
Chevalier (Construction) was fined HKD 80,000 in January 2026 because on 23 February 2025 the company carried out prescribed construction work in breach of the conditions of its construction noise permit. It was the heaviest single fine among the 34 convictions reported by the Environmental Protection Department for January 2026.
A noise permit only protects a site as long as its conditions on hours and equipment are actually observed.
Complying with noise permit conditions on construction sites
- Authority / court
- Kwun Tong Magistrates' Courts, Hongkong (Anklage: Environmental Protection Department)
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- Noise Control Ordinance (Bauarbeiten entgegen den Bedingungen einer Construction Noise Permit)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 23 Feb 2026
Original amount 80,000 HKD, converted at the ECB reference rate of 23 Feb 2026.
- EPD convictions in January 2026 (Liste der Verurteilungen) Enforcement database of an authority
- EPD convictions in January (23 February 2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
19 Feb 2026 AZOP: 100,000 EUR against estate agent over ID copies and old files €100,000
An estate agency (name not published) kept 11,887 brokerage contracts from 2010 to 2019, together with 914 copies of identity cards, passports and bank cards, without a legal basis, although the managing director stated that no card copies were collected. The Croatian data protection authority (Agencija za zaštitu osobnih podataka, AZOP) also criticised irregular and inadequate data protection training for employees and imposed 100,000 EUR (date of publication; exact date of the decision not stated).
Make copies of identity documents and cards only with a legal basis, destroy old files on time and train employees regularly.
Data minimisation for ID copies, retention periods
Missing or inadequate training played a role in the decision.
- Authority / court
- Agencija za zaštitu osobnih podataka (AZOP)
- Area of law
- Data protection · Data subject rights and transparency
- Legal basis
- Art. 5 Abs. 1 lit. c und e, Art. 6 Abs. 1, Art. 32 Abs. 4 DSGVO
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Culpability
- negligent
- Mitigating circumstances
- No damage to data subjects was found.
- Published
- 19 Feb 2026
- Agenciji za nekretnine izrečena kazna u iznosu od 100.000,00 eura Press release of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
16 Feb 2026 Carillion plc (in liquidation)FCA: Public censure for Carillion plc over misleading market information Reprimand or warning
The FCA publicly censured the former construction and services group Carillion plc. The regulator found that between July 2016 and July 2017 the company published misleading information, breaching the prohibition of market manipulation and listing requirements; in July 2017 Carillion had to announce a provision of £845 million. Because the company has been in liquidation since January 2018, no fine was imposed; the FCA stated it would otherwise have been £37.91 million.
- Authority / court
- Financial Conduct Authority (FCA)
- Area of law
- Capital markets and financial supervision · Market abuse and insider dealing
- Legal basis
- Art. 15 MAR; Listing Rule 1.3.3R; Listing Principle 1; Premium Listing Principle 2; sections 91 und 123 FSMA 2000
- Action
- Reprimand or warning
- Status of proceedings
- final
- Sector
- Construction and real estate
- FCA Final Notice: Carillion plc (in liquidation) (16 February 2026) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
10 Feb 2026 Strukton Civiel Projecten B.V. und Strukton International B.V. (Strukton-Gruppe)Construction group Strukton pays 10 million EUR out-of-court settlement over bribery on the Riyadh Metro €10m
To secure a share in the Riyadh Metro project, around 31 million USD was paid between 2013 and 2021 to an agent representing a high-ranking member of the Saudi royal family; the agent payments were understated to the export credit insurer Atradius. Strukton accepted a transaction (out-of-court settlement) of 10 million EUR.
Commissions to agents with ties to ruling families carry the highest risk – and false statements to export credit insurers constitute a second offence.
Agent commissions and false statements to export credit insurers
- Authority / court
- Openbaar Ministerie (OM)
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Buitenlandse ambtelijke omkoping und valsheid in geschrift (Wetboek van Strafrecht); Transactie nach Art. 74 Sr
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Culpability
- intentional
- Mitigating circumstances
- Cooperation from mid-2023; compliance programme in place since 2017; the employees involved are no longer with the company.
- Published
- 30 Mar 2026
- Strukton betaalt hoge transactie van 10 miljoen euro na corruptieonderzoek Press release of an authority
- OM Functioneel Parket: Transactieovereenkomst Calisto (10.02.2026) Decision of an authority
- College van procureurs-generaal: Beslissing hoge transactie onderzoek Calisto (09.02.2026) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
4 Feb 2026 RE/MAX Twin City Realty Inc.FINTRAC: CAD 24,750 penalty on RE/MAX Twin City Realty Inc. for one violation of anti-money laundering obligations €15,336
According to FINTRAC, RE/MAX Twin City Realty Inc. is a real estate brokerage based in Kitchener, Ontario. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 24,750 on the company on 4 February 2026. According to FINTRAC's findings, made during a compliance examination, the company committed one violation of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violation concerned assessing and documenting money laundering and terrorist financing risks. According to FINTRAC, the penalty has been paid in full and the case is closed. Source: FINTRAC (Financial Transactions and Reports Analysis Centre of Canada), "Administrative monetary penalty on RE/MAX Twin City Realty Inc.", published 5 May 2026, https://fintrac-canafe.canada.ca/pen/amps/pen-2026-05-05-1-eng; summarised in our own words; not an official version and not a reproduction of the original.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Internal controls
- Legal basis
- PCMLTFA s. 9.6(1); PCMLTF Regulations 156(1)(c); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 5 May 2026
Original amount 24,750 CAD, converted at the ECB reference rate of 4 Feb 2026.
- Administrative monetary penalty on RE/MAX Twin City Realty Inc. (05.05.2026) Decision of an authority
- FINTRAC – Public notice of administrative monetary penalties Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
30 Jan 2026 Jim's Realty Pty Ltd (früher Agape Property Group)WA: record 225,000 AUD fine for estate agency over trust account and bond breaches €132,345
On 30 January 2026 the Perth Magistrates Court convicted Jim's Realty Pty Ltd on 35 charges – client money not credited to the trust account, unlawful withdrawals, improper records and tenancy bonds lodged late or not at all – and fined it 225,000 AUD plus 577.50 AUD in costs. A forensic audit commissioned by Consumer Protection WA (the consumer protection division of Western Australia) had identified 57 unexplained withdrawals totalling more than 334,915 AUD. According to the regulator it is the largest fine ever imposed on an estate agency in Western Australia; the company has been in liquidation since 2024.
Trust money and tenancy bonds require complete records and timely lodgement; irregularities in the annual audit are a warning sign that must be resolved immediately.
Handling client money in trust accounts and timely lodgement of tenancy bonds
- Authority / court
- Consumer Protection WA (Department of Local Government, Industry Regulation and Safety) / Perth Magistrates Court
- Area of law
- Consumer protection and online retail
- Legal basis
- Real Estate and Business Agents Act 1978 (WA); Residential Tenancies Act 1987 (WA)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Culpability
- intentional
- Repeat case
- yes
- Mitigating circumstances
- None; according to the release, the court found no mitigating factors despite the liquidation.
- Published
- 11 Feb 2026
Original amount 225,000 AUD, converted at the ECB reference rate of 30 Jan 2026.
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
29 Jan 2026 Tarmac Building Products LimitedTarmac Building Products: 633,300 GBP after worker's legs crushed on production line €731,124
At the Linford plant in 2022 an employee's legs were trapped between metal frames weighing over a tonne because the interlocked access gate did not cut the power to the preceding sections of track. Previous near misses and a risk assessment from years earlier that called for additional control measures were not acted upon; fine of 633,300 GBP plus 5,583 GBP in costs. According to its 2025 annual accounts, the company had an average of 596 employees.
Follow up near misses and outstanding actions from risk assessments – otherwise they prove in court that you knew of the risk.
- Authority / court
- Chelmsford Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 2(1) Health and Safety at Work etc. Act 1974
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Employees
- 250 to 999
- Published
- 30 Jan 2026
Original amount 633,300 GBP, converted at the ECB reference rate of 29 Jan 2026.
- Building materials manufacturer fined over £600,000 after worker suffers life-changing injuries at Tarmac plant (HSE) Press release of an authority
- Companies House: Registereintrag Tarmac Building Products Limited (04026569) Official register or notice
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
27 Jan 2026 Salford Grab Hire LimitedExcavator bucket used as a prop: mechanic seriously injured – 10,000 GBP for grab hire firm €11,517
During the repair of a tipper truck, a JCB bucket without a quick hitch or retaining pin was used to prop up the raised tipper body; the one-tonne bucket fell and seriously injured a mechanic. The business (11 employees according to its micro-entity accounts) had not used suitable props; fine of 10,000 GBP plus 3,475.90 GBP in costs.
Secure raised loads only with props designed for the purpose – improvised supports using work equipment are a typical cause of serious crush injuries.
- Authority / court
- Warrington Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 2(1) Health and Safety at Work etc. Act 1974
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Employees
- Under 50
- Published
- 4 Feb 2026
Original amount 10,000 GBP, converted at the ECB reference rate of 27 Jan 2026.
- Plant hire company fined £10,000 after employee struck by falling JCB bucket (HSE) Press release of an authority
- Companies House: Registereintrag Salford Grab Hire Ltd (10895680) Official register or notice
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
26 Jan 2026 DME Construction Associates Inc.DME Construction Associates: USD 600,000 OSHA settlement after fatal roof fall €506,928
Long Island roofing contractor DME Construction Associates entered into a settlement with the US Department of Labor affirming all citations issued after an employee fell to his death through an unprotected skylight in August 2021, including nine wilful violations, eight of them cited per instance for each unprotected employee. The company will pay 600,000 USD and must introduce a written safety plan, ensure sufficient fall protection for all workers, notify OSHA of jobs in advance, allow inspections without a warrant and have supervisors complete a 30-hour course. The authority allegedly made the findings set out here; this account is not based on a final judgment.
Missing fall protection can be penalised separately for each employee.
Fall protection on roofs
Missing or inadequate training played a role in the decision.
- Authority / court
- U.S. Department of Labor – Occupational Safety and Health Administration (OSHA)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Occupational Safety and Health Act (Absturzsicherung im Bauwesen)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Culpability
- intentional
- Liability of senior managers
- Measures against individuals are not set out here.
- Published
- 26 Jan 2026
Original amount 600,000 USD, converted at the ECB reference rate of 26 Jan 2026.
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
21 Jan 2026 Hip Seng Builders LimitedHong Kong: fines for Hip Seng Builders after fatal electrocution raised to HKD 521,000 €56,920
After a fatal accident on 19 August 2023 at a construction site in Chek Lap Kok, in which a worker received an electric shock while carrying out electrical work on a false ceiling, Hip Seng Builders had been fined HKD 261,000 on 23 January 2025. On the prosecution's application, the court reviewed the sentence and on 21 January 2026 increased the fines to HKD 521,000. The conviction was under the Factories and Industrial Undertakings Ordinance and two regulations on construction site and electrical safety.
Electrical work on construction sites requires isolation and testing before work starts; Hong Kong prosecutors actively challenge sentences they consider too lenient.
Electrical safety during installation work on construction sites
- Authority / court
- West Kowloon Magistrates' Courts, Hongkong (Anklage: Labour Department)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Factories and Industrial Undertakings Ordinance; Construction Sites (Safety) Regulations; Factories and Industrial Undertakings (Electricity) Regulations
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 21 Jan 2026
Original amount 521,000 HKD, converted at the ECB reference rate of 21 Jan 2026.
- Court makes review decision on sentencing for violating occupational safety and health legislation (21 January 2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
9 Jan 2026 Bulgarian construction subcontractor: 215,000 EUR for paying below the minimum wage €215,000
A Bulgarian construction company that worked as a subcontractor for a German firm on a major construction site in the district of Tuttlingen between January and May 2023 paid below the minimum wage, recorded only the duration of working time rather than its start and end, and did not register the posting. Around 215,000 EUR was imposed on the company, corresponding to the economic benefit obtained by paying below the minimum wage; the decision issued in September 2025 has been final since the end of 2025 (date = publication; exact date of the decision not specified).
General contractors should actively check the minimum wage, working time records and posting notifications of their foreign subcontractors; the economic benefit is disgorged in full.
- Authority / court
- Hauptzollamt Singen (Finanzkontrolle Schwarzarbeit)
- Area of law
- Health and safety and employment law · Minimum wage and undeclared work
- Legal basis
- Mindestlohngesetz; Arbeitnehmer-Entsendegesetz (Aufzeichnungs- und Meldepflichten)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 9 Jan 2026
- Zeit, Geld, Meldepflicht – Zoll ahndet Verstöße mit sechsstelligem Bußgeld (Hauptzollamt Singen) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
7 Jan 2026 Exyte Management GmbHExyte: 1.5 million USD – Chinese subsidiary arranged US goods for listed chipmaker SMIC €1.28m
The Shanghai company of the Stuttgart-based Exyte group caused around 884 US items (flowmeters, pressure transmitters, controllers) worth around 2.85 million USD to be delivered by Chinese suppliers to SMIC Beijing, which is on the Entity List (the US export control list of restricted parties), on 13 occasions in 2021/22. According to the Bureau of Industry and Security (BIS, the export control agency of the US Department of Commerce), the compliance programme did not recognise that in-country transfers within China also require a licence; Exyte voluntarily disclosed the transactions and admitted them.
Screen end customers against the Entity List in foreign subsidiaries too, even for local purchases – US export law also covers transfers of US goods within China.
Entity List screening also for domestic deliveries abroad
- Authority / court
- U.S. Department of Commerce, Bureau of Industry and Security (BIS)
- Area of law
- Sanctions and export control · Export control and dual-use goods
- Legal basis
- Export Administration Regulations, 15 C.F.R. § 764.2(b), § 744.11
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Culpability
- negligent
- Mitigating circumstances
- Voluntary self-disclosure, own investigation with external lawyers and investment in the compliance programme.
- Published
- 7 Jan 2026
Original amount 1,500,000 USD, converted at the ECB reference rate of 7 Jan 2026.
- BIS Imposes Administrative Penalty on Exyte Management GmbH Press release of an authority
- Order Relating to Exyte Management GmbH (7. Januar 2026) mit Settlement Agreement Decision of an authority
Checked against the official source on 28 Sep 2026 · Direct link
Report an error
12 Dec 2025 EllisDon CorporationEllisDon: CAD 514,831.53 penalty after fatal crane incident at high-rise site €318,998
In February 2024 a flytable was being moved by tower crane at the Oakridge Park construction site; as it was pushed out it accelerated out of the building, fell and fatally struck a worker. WorkSafeBC found that EllisDon, as prime contractor, had not regularly reviewed the subcontractor's safe work procedures, had not confirmed that a risk assessment had been carried out, had not classed the lift as critical, had not ensured written lift plans, had not controlled the exclusion zone on the ground and had not coordinated the health and safety activities of the employers involved. It imposed an administrative penalty of CAD 514,831.53.
Prime contractors must actively plan, review and coordinate their subcontractors' critical crane lifts rather than relying on their procedures.
Coordinating health and safety and critical lifts on multi-employer construction sites
- Authority / court
- WorkSafeBC (Workers' Compensation Board of British Columbia)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Arbeitsschutzvorschriften von British Columbia, insbesondere Occupational Health and Safety Regulation (OHSR) – Pflichten des Hauptauftragnehmers (prime contractor) und Anforderungen an kritische Kranhübe; Verwaltungsstrafe (administrative penalty) von WorkSafeBC
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 12 Dec 2025
Original amount 514,831.53 CAD, converted at the ECB reference rate of 12 Dec 2025.
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
12 Dec 2025 Newway Concrete FormingNewway Concrete Forming: CAD 112,624.66 penalty after fatal flytable incident €69,784
In February 2024 the formwork contractor was moving a flytable by tower crane at the Oakridge Park construction site when it fell out of the building and fatally struck a worker. WorkSafeBC found, among other things, missing written lift plans for critical lifts, inadequate procedures for corner flytables, a lack of risk assessments and inspections, loads being passed over people and insufficient instruction, training and supervision of workers, and imposed an administrative penalty of CAD 112,624.66.
Formwork and lifting crews need written step-by-step procedures, trained ground control workers and controlled exclusion zones.
Safe lifting and formwork operations, training of ground control workers
Missing or inadequate training played a role in the decision.
- Authority / court
- WorkSafeBC (Workers' Compensation Board of British Columbia)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Arbeitsschutzvorschriften von British Columbia, insbesondere Occupational Health and Safety Regulation (OHSR) – Hebepläne, Schalungsarbeiten, Unterweisung und Aufsicht; Verwaltungsstrafe (administrative penalty) von WorkSafeBC
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 12 Dec 2025
Original amount 112,624.66 CAD, converted at the ECB reference rate of 12 Dec 2025.
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
10 Dec 2025 Century 21 Heritage Group Ltd.FINTRAC: CAD 148,912.50 penalty on Century 21 Heritage Group Ltd. for one violation of anti-money laundering obligations €92,446
According to FINTRAC, Century 21 Heritage Group Ltd. is a real estate brokerage. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 148,912.50 on the company on 10 December 2025. According to FINTRAC's findings, made during a compliance examination, the company committed one violation of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violation concerned suspicious transaction reporting. According to FINTRAC, the company has appealed the decision to the Federal Court. Source: FINTRAC (Financial Transactions and Reports Analysis Centre of Canada), "Administrative monetary penalty on Century 21 Heritage Group Ltd.", published 10 February 2026, https://fintrac-canafe.canada.ca/pen/amps/pen-2026-02-10-eng; summarised in our own words; not an official version and not a reproduction of the original.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Suspicious activity reports
- Legal basis
- PCMLTFA s. 7; Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
- Action
- Fine
- Status of proceedings
- under appeal
- Sector
- Construction and real estate
- Published
- 10 Feb 2026
Original amount 148,912.5 CAD, converted at the ECB reference rate of 10 Dec 2025.
- Administrative monetary penalty on Century 21 Heritage Group Ltd. (10.02.2026) Decision of an authority
- FINTRAC – Public notice of administrative monetary penalties Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
4 Dec 2025 Gracetown, Inc.OFAC: USD 7.14 million penalty on Gracetown over payments for a blocked company and failure to file a blocking report €6.12m
OFAC has imposed a penalty of USD 7,139,305 on New York property management company Gracetown, Inc. by way of a Penalty Notice. According to OFAC's findings, between April 2018 and May 2020 Gracetown received 24 payments on behalf of an affiliated company owned by a sanctioned Russian oligarch, although OFAC had previously given it explicit notice of the prohibition. Gracetown also failed to report the blocked property to OFAC for more than 45 months. OFAC regarded the violations as wilful or at least reckless, egregious and not voluntarily self-disclosed; the base penalty equalled the statutory maximum of USD 8,906,358. OFAC's publication does not state whether Gracetown has paid the penalty or challenged it in court. Source: U.S. Department of the Treasury, Office of Foreign Assets Control (OFAC), enforcement release "OFAC Imposes $7,139,305 Penalty on Gracetown, Inc. for Violating Ukraine-/Russia-Related Sanctions and Reporting Obligations", 4 December 2025, https://ofac.treasury.gov/media/934796/download?inline; summarised in our own words.
- Authority / court
- U.S. Department of the Treasury, Office of Foreign Assets Control (OFAC)
- Area of law
- Sanctions and export control · Breaches of sanctions and embargoes
- Legal basis
- Ukraine-/Russia-Related Sanctions Regulations, 31 C.F.R. § 589.201; Reporting, Procedures and Penalties Regulations, 31 C.F.R. § 501.603 (Sperrmeldung); Penalty Notice nach den Economic Sanctions Enforcement Guidelines, 31 C.F.R. part 501, app. A
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 4 Dec 2025
Original amount 7,139,305 USD, converted at the ECB reference rate of 4 Dec 2025.
- OFAC Enforcement Release: OFAC Imposes $7,139,305 Penalty on Gracetown, Inc. (04.12.2025) Decision of an authority
- OFAC – 2025 Enforcement Information Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
1 Dec 2025 VIP Realty Inc.FINTRAC: CAD 33,000 penalty on VIP Realty Inc. for one violation of anti-money laundering obligations €20,296
According to FINTRAC, VIP Realty Inc. is a real estate brokerage based in Ottawa, Ontario. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 33,000 on the company on 1 December 2025. According to FINTRAC's findings, made during a compliance examination, the company committed one violation of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violation concerned the prescribed review of the compliance programme. According to FINTRAC, the penalty has been paid in full and the case is closed. Source: FINTRAC (Financial Transactions and Reports Analysis Centre of Canada), "Administrative monetary penalty on VIP Realty Inc.", published 9 July 2026, https://fintrac-canafe.canada.ca/pen/amps/pen-2026-07-09-2-eng; summarised in our own words; not an official version and not a reproduction of the original.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Internal controls
- Legal basis
- PCMLTFA s. 9.6(1); PCMLTF Regulations 156(1)(f); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 9 Jul 2026
Original amount 33,000 CAD, converted at the ECB reference rate of 1 Dec 2025.
- Administrative monetary penalty on VIP Realty Inc. (09.07.2026) Decision of an authority
- FINTRAC – Public notice of administrative monetary penalties Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
27 Nov 2025 Manor Windsor Realty Ltd.FINTRAC: estate agent Manor Windsor Realty without AML training programme – 107,250 CAD €65,907
The estate agency in Windsor (Ontario) received a penalty of 107,250 CAD from the Financial Transactions and Reports Analysis Centre of Canada (FINTRAC) for four violations: no up-to-date, approved compliance policies, no assessment of the money laundering risk, no written ongoing training programme and no effectiveness review of the compliance programme. The company has appealed to the Federal Court.
For estate agents, a missing written training programme is a separate violation subject to penalties.
AML training programme for estate agents
Missing or inadequate training played a role in the decision.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Internal controls
- Legal basis
- Proceeds of Crime (Money Laundering) and Terrorist Financing Act, Part 1, und zugehörige Verordnungen
- Action
- Fine
- Status of proceedings
- under appeal
- Sector
- Construction and real estate
- Published
- 12 Feb 2026
Original amount 107,250 CAD, converted at the ECB reference rate of 27 Nov 2025.
- FINTRAC imposes an administrative monetary penalty on Manor Windsor Realty Ltd. Press release of an authority
- Public notice of administrative monetary penalties Enforcement database of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
20 Nov 2025 1135233 B.C. Ltd.FINTRAC: CAD 149,886 penalty on 1135233 B.C. Ltd. for 6 violations of anti-money laundering obligations €92,557
According to FINTRAC, 1135233 B.C. Ltd. (operating as LeHomes Realty Premier) is a real estate brokerage based in Vancouver, British Columbia. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 149,886 on the company. Published by FINTRAC on 20 November 2025; decision date not published. According to FINTRAC's findings, the company committed 6 violations of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violations concerned suspicious transaction reporting, appointing a compliance officer, written compliance policies and procedures, assessing and documenting money laundering and terrorist financing risks, the compliance training programme and client identification record keeping. According to FINTRAC, the company will pay the penalty in full and the case is closed. Source: FINTRAC (Financial Transactions and Reports Analysis Centre of Canada), "Administrative monetary penalty on 1135233 B.C. Ltd.", published 20 November 2025, https://fintrac-canafe.canada.ca/pen/amps/pen-2025-11-20-3-eng; summarised in our own words; not an official version and not a reproduction of the original.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Suspicious activity reports
- Legal basis
- PCMLTFA s. 7; PCMLTF Regulations 39(1)(b), 71(1)(a), 71(1)(b), 71(1)(c), 71(1)(d); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 20 Nov 2025
Original amount 149,886 CAD, converted at the ECB reference rate of 20 Nov 2025.
- Administrative monetary penalty on 1135233 B.C. Ltd. (20.11.2025) Decision of an authority
- FINTRAC – Public notice of administrative monetary penalties Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
20 Nov 2025 ein Dachdeckerbetrieb in EnglandRoofing contractor: 16,650 GBP after fall through skylight opening €18,888
While re-covering a flat roof on a residential property in England, an employee fell more than three metres through an open skylight opening and needed surgery. The business (a micro-enterprise with fewer than 10 employees) had not planned the work at height and had provided neither a crash deck nor netting; fine of 16,650 GBP plus 7,205 GBP in costs.
Secure or provide protection beneath openings before work starts, even on small roofing jobs; planning is mandatory, not optional.
- Authority / court
- Birmingham Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 3(1) Health and Safety at Work etc. Act 1974
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Employees
- Under 50
- Published
- 25 Nov 2025
Original amount 16,650 GBP, converted at the ECB reference rate of 20 Nov 2025.
- HSE, Pressemitteilungen (Übersicht) (Entscheidung 2025) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
30 Oct 2025 Barratt Redrow, Persimmon, Taylor Wimpey u. a. (7 Wohnungsbauunternehmen)CMA: seven housebuilders pay GBP 100m after suspected information exchange €113.6m
The CMA accepted binding commitments from Barratt Redrow, Bellway, Berkeley, Bloor Homes, Persimmon, Taylor Wimpey and Vistry after investigating whether they had exchanged competitively sensitive information such as achieved sale prices. The companies committed to stop sharing such information, introduce compliance measures and annual competition law training, help develop industry guidance and jointly pay GBP 100m to affordable housing programmes; no infringement was found.
Even exchanging current sale prices with competitors can trigger a competition investigation and large payments; contacts with competitors need clear rules and training.
Exchanging pricing and sales information with competitors
Missing or inadequate training played a role in the decision.
- Authority / court
- Competition and Markets Authority (CMA)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Chapter I prohibition Competition Act 1998 (Verdacht); Verpflichtungszusagen nach section 31A Competition Act 1998
- Action
- Other
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 30 Oct 2025
Original amount 100,000,000 GBP, converted at the ECB reference rate of 30 Oct 2025.
- CMA case page: Investigation into suspected anti-competitive conduct by housebuilders Enforcement database of an authority
- CMA: Decision to accept commitments in relation to suspected anti-competitive conduct by certain housebuilders, Case 51392 (30 October 2025) Decision of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
27 Oct 2025 SINOP ALFA, s.r.o.SINOP ALFA: 70,000 EUR for refusing to hand over business mobile phone during inspection €70,000
During an unannounced inspection in the air-conditioning, refrigeration and heat pump services sector, the company repeatedly refused to produce a mobile phone used for business purposes. The Protimonopolný úrad Slovenskej republiky (Antimonopoly Office of the Slovak Republic, PMÚ SR) regarded this as obstruction of the inspection and imposed 70,000 EUR, around 1% of the previous year’s turnover (not final).
Business smartphones are part of the documents that may be inspected – a dawn raid guide for employees prevents costly wrong reactions.
Conduct during inspections (dawn raids), handing over mobile devices
- Authority / court
- Protimonopolný úrad Slovenskej republiky (PMÚ SR)
- Area of law
- Competition law
- Legal basis
- Slowakisches Wettbewerbsschutzgesetz (Mitwirkungspflicht bei Nachprüfungen)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Culpability
- intentional
- Published
- 28 Oct 2025
- KARTELY: PMÚ uložil pokutu za nespoluprácu počas inšpekcie Press release of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
2 Oct 2025 Lanes Group LimitedLanes Group: fatal accident with high-pressure hose – 800,000 GBP €917,326
While a high-pressure jetting system was being primed in freezing conditions in 2022, a pressure release occurred and the end of the hose struck a drainage engineer in the face; he died two and a half weeks later. There was no safe system of work, jetting vices were not properly maintained, monitoring was lacking, and information, instruction, training and supervision were insufficient; fine of 800,000 GBP (reduced from 1.2 million GBP for an early guilty plea) plus 8,680 GBP in costs. According to its consolidated accounts (financial year to July 2024), the company employed 2,268 people and the group 3,610.
Make routine safe with high-pressure equipment: always secure hose ends mechanically, include weather risks such as frost in work instructions and check compliance.
Safe working with high-pressure water jetting equipment
Missing or inadequate training played a role in the decision.
- Authority / court
- City of London Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 2(1) Health and Safety at Work etc. Act 1974
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Employees
- 1,000 to 9,999
- Mitigating circumstances
- Early guilty plea (reduction from 1.2 million GBP to 800,000 GBP)
- Published
- 6 Oct 2025
Original amount 800,000 GBP, converted at the ECB reference rate of 2 Oct 2025.
- Lanes Group Limited fined £800k after investigation into death of devoted father (HSE) Press release of an authority
- Companies House: Registereintrag Lanes Group Limited (03784486) Official register or notice
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
30 Sep 2025 Bauunternehmung Pusiol GmbHConstruction cartel: €130,000 on civil engineering firm Pusiol, losses considered €130,000
The Kartellgericht (Cartel Court) fined Bauunternehmung Pusiol GmbH, a subsidiary of Steiner Baugesellschaft m.b.H., allegedly 130,000 EUR for taking part in the construction cartel in Lower Austria from July 2002 to August 2016 (price fixing, market sharing and information exchange in civil engineering tenders). The BWB (Federal Competition Authority) set the fine lower because of the company's limited financial capacity, as it reported annual losses in 2023 and 2024; the company gave a full acknowledgement.
Collusion from long ago is still punished; a strained financial position can reduce the fine but cannot avert it.
Bid rigging in tenders
- Authority / court
- Oberlandesgericht Wien als Kartellgericht (Antrag der Bundeswettbewerbsbehörde)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- § 1 Abs. 1 KartG und Art. 101 Abs. 1 AEUV; § 29 Abs. 1 Z 1 lit. a und d KartG
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Repeat case
- no
- Mitigating circumstances
- Limited financial capacity (losses in 2023 and 2024); full acknowledgement.
- Published
- 4 Mar 2026
Checked against the official source on 4 Oct 2026 · Direct link
Report an error
1 Sep 2025 SIA "SILTUMTEHSERVISS", SIA "Apkure IM", SIA "ADAPTERIS", SIA "Alpex", SIA "Infrakom"Bid-rigging cartel in pipeline construction contracts – five construction firms pay 513,508 EUR €513,508
From 2021 to 2024, two groups of construction companies coordinated in more than 30 public tenders for the construction and repair of utility pipelines: they exchanged sensitive information, determined winners and submitted sham bids. Prompted by information from the contracting entity Rīgas namu pārvaldnieks, the Konkurences padome (Latvian Competition Council) imposed a total of 513,508.08 EUR.
Jointly preparing bids with competitors – even where the work is later carried out jointly – is a cartel; tender teams must know this.
Competition law in tenders
- Authority / court
- Konkurences padome (Lettischer Wettbewerbsrat)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Art. 11 Abs. 1 Konkurences likums
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Mitigating circumstances
- All companies except Infrakom concluded a settlement with the Competition Council, acknowledged the facts and waived an appeal; in return, a 10% fine reduction.
- Published
- 10 Sep 2025
- KP atklāj karteli inženierkomunikāciju būvdarbu iepirkumos (10.09.2025) Press release of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
28 Aug 2025 Home Improvement Marketing LtdICO: £300,000 fine for Home Improvement Marketing over 2.4 million automated calls €347,343
The ICO fined Home Improvement Marketing Ltd £300,000 and issued an enforcement notice. After executing a search warrant in March 2024, it found that between 31 May and 31 August 2023 the company had instigated 2,449,380 automated marketing calls without prior consent; 274 complaints were received. According to the ICO, the software responded to recipients' answers and offered no way to opt out of further calls. The legal basis is regulations 19 and 24 of PECR.
- Authority / court
- Information Commissioner's Office (ICO)
- Area of law
- Data protection · Marketing and consent
- Legal basis
- Regulations 19 und 24 PECR; section 55A DPA 1998
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
Original amount 300,000 GBP, converted at the ECB reference rate of 28 Aug 2025.
- ICO Enforcement: Home Improvement Marketing Ltd (MPN). Enthält Informationen des Information Commissioner's Office, lizenziert unter der Open Government Licence v3.0. Enforcement database of an authority
- Monetary Penalty Notice: Home Improvement Marketing Ltd (28 August 2025) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
28 Aug 2025 Green Spark Energy LtdICO: £250,000 fine for Green Spark Energy over 9.6 million automated marketing calls €289,452
The ICO fined Green Spark Energy Ltd £250,000 and issued an enforcement notice. After executing a search warrant in March 2024, the regulator found that from May 2023 to May 2024 the company had instigated 9,587,050 automated calls carrying recorded marketing messages; 497 complaints were received. According to the ICO, the recordings contained misleading statements designed to pressure homeowners, for example about supposed risks of their existing loft insulation. The legal basis is regulations 19 and 24 of PECR.
- Authority / court
- Information Commissioner's Office (ICO)
- Area of law
- Data protection · Marketing and consent
- Legal basis
- Regulations 19 und 24 PECR; section 55A DPA 1998
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
Original amount 250,000 GBP, converted at the ECB reference rate of 28 Aug 2025.
- ICO Enforcement: Green Spark Energy Ltd (MPN). Enthält Informationen des Information Commissioner's Office, lizenziert unter der Open Government Licence v3.0. Enforcement database of an authority
- Monetary Penalty Notice: Green Spark Energy Ltd (28 August 2025) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
25 Aug 2025 PAUPE HOLDING SA, Bitusag S.A., Bitusag Neuchâtel SA, Wyss Fils SA, Prodo SA, Duckert SAWEKO fines road maintenance firms in Jura/Neuchâtel over bid rigging Fine
Regional suppliers of surface treatments and chip sealing in road maintenance colluded on bids and allocated territories. Switzerland's Competition Commission (Wettbewerbskommission, WEKO) imposed sanctions on Bitusag/Paupe (jointly and severally, CHF 640,000–990,000, exact amount redacted), Wyss Fils (CHF 44,000–74,000), Prodo (CHF 760) and Duckert (CHF 0) and approved amicable settlements; the investigation against Colas Suisse was discontinued.
Small regional road builders are also sanctioned – cover bids and territorial protection must disappear from corporate culture.
Cover bids and territorial agreements in regional road construction
- Authority / court
- Wettbewerbskommission (WEKO)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Art. 5 Abs. 3 i.V.m. Abs. 1 KG, Art. 49a Abs. 1 KG
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Mitigating circumstances
- Amicable settlements; leniency programme (Duckert free of sanctions)
- Enduits superficiels et gravillonnage : Décision du 25 août 2025 Decision of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
19 Aug 2025 Allied Stone Inc.Allied Stone: 12.4 million USD – Chinese quartz declared as marble or glass €10.6m
The Dallas-based supplier of countertops allegedly declared Chinese quartz surface products between 2018 and 2023 as goods subject to lower duties, such as marble or crystallised glass, and evaded anti-dumping and countervailing duties, including by using third parties as importers of record. The settlement of 12.4 million USD (a joint payment with a further settling party) resolves a whistleblower lawsuit.
Do not rely on third parties acting as importer – you remain liable for the correct description of the goods; customs responsibility cannot be outsourced.
Description and classification of goods subject to anti-dumping duties
- Authority / court
- U.S. Department of Justice, Civil Division, und U.S. Attorney’s Office Northern District of Texas
- Area of law
- Sanctions and export control · Customs
- Legal basis
- False Claims Act, 31 U.S.C. §§ 3729 ff. (Vergleich; Haftung nicht festgestellt)
- Action
- Other
- Status of proceedings
- final
- Sector
- Construction and real estate
- Liability of senior managers
- Measures against individuals are not reported here.
- Published
- 19 Aug 2025
Original amount 12,400,000 USD, converted at the ECB reference rate of 19 Aug 2025.
- U.S. Department of Justice, Pressemitteilung zum Vergleich mit Allied Stone Inc. (Entscheidung 2025) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
9 Jul 2025 Share buyback disclosed too late: BVwG reduces FMA penalty against real estate company €300,000
On Saturday, 17 December 2022, the management board of a listed real estate company (anonymised in the judgment) approved by email a new share buyback programme including its volume, period and price, but only published it after a formal resolution on Monday, 19 December 2022. Austria's Financial Market Authority (FMA) imposed a penalty of 375,000 EUR; the Federal Administrative Court (Bundesverwaltungsgericht, BVwG) upheld the breach of the ad hoc disclosure obligation but reduced the penalty to 300,000 EUR.
A final decision by a corporate body triggers the ad hoc disclosure obligation immediately – weekends and outstanding contractual details do not postpone it.
Ad hoc disclosure obligation for decisions of corporate bodies, including at weekends
- Authority / court
- Bundesverwaltungsgericht (Beschwerde gegen Straferkenntnis der Finanzmarktaufsicht FMA)
- Area of law
- Capital markets and financial supervision · Disclosure and reporting obligations
- Legal basis
- Art. 17 Abs. 1 MAR i. V. m. § 156 Abs. 3 Z 2, Abs. 4 BörseG 2018
- Action
- Fine
- Status of proceedings
- reduced
- Sector
- Construction and real estate
- Culpability
- negligent
- BVwG W279 2310813-1 vom 09.07.2025 Court decision
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
2 Jul 2025 ATE, s. r. o.; AŽD Praha s.r.o.; EPLcond a.s.; MONZAS, a.s.; První SaZ Plzeň a.s.; STARMON s.r.o.Railway signalling: 157.7 million CZK against six companies for bid rigging €6.39m
The six companies colluded on cover bids, market sharing and prices in 26 contracts awarded by the state railway infrastructure administration (total value over 850 million CZK, 2015–2021). In a settlement procedure, the Úřad pro ochranu hospodářské soutěže (Czech Office for the Protection of Competition, ÚOHS) imposed a total of 157.693 million CZK at first instance; two companies appealed against the amount.
A cover bid submitted ‘as a favour’ is bid rigging – sales and costing teams must be aware of this.
Cover bids and collusion in public tenders
Missing or inadequate training played a role in the decision.
- Authority / court
- Úřad pro ochranu hospodářské soutěže (ÚOHS)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Tschechisches Wettbewerbsgesetz, Art. 101 AEUV (Submissionsabsprachen)
- Action
- Fine
- Status of proceedings
- under appeal
- Sector
- Construction and real estate
- Culpability
- intentional
- Mitigating circumstances
- Settlement (20% reduction, no procurement ban), leniency application by one participant and compliance programmes at two companies.
- Published
- 2 Jul 2025
Original amount 157,693,000 CZK, converted at the ECB reference rate of 2 Jul 2025.
- Office Fines Major Cartel in Railway Construction Sector More Than CZK 150 million Press release of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
2 Jul 2025 9321-0599 Québec Inc.FINTRAC: CAD 23,100 penalty on 9321-0599 Québec Inc. for 2 violations of anti-money laundering obligations €14,401
According to FINTRAC, 9321-0599 Québec Inc. is a real estate brokerage based in Brossard, Québec. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 23,100 on the company on 2 July 2025. According to FINTRAC's findings, made during a compliance examination, the company committed 2 violations of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violations concerned written compliance policies and procedures and assessing and documenting money laundering and terrorist financing risks. According to FINTRAC, the company has appealed the decision to the Federal Court. Source: FINTRAC (Financial Transactions and Reports Analysis Centre of Canada), "Administrative monetary penalty on 9321-0599 Québec Inc.", published 20 November 2025, https://fintrac-canafe.canada.ca/pen/amps/pen-2025-11-20-1-eng; summarised in our own words; not an official version and not a reproduction of the original.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Internal controls
- Legal basis
- PCMLTFA s. 9.6(1); PCMLTF Regulations 156(1)(b), 156(1)(c); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
- Action
- Fine
- Status of proceedings
- under appeal
- Sector
- Construction and real estate
- Published
- 20 Nov 2025
Original amount 23,100 CAD, converted at the ECB reference rate of 2 Jul 2025.
- Administrative monetary penalty on 9321-0599 Québec Inc. (20.11.2025) Decision of an authority
- FINTRAC – Public notice of administrative monetary penalties Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
26 Jun 2025 Retta Isännöinti Oy (Retta-Gruppe), Oulun Kiinteistötieto Oy, REIM Group Oy Ltd u. a. (Verband und 11 Gesellschaften)Finnish property management cartel: Supreme Administrative Court raises fines to EUR 6.558m €6.56m
The Korkein hallinto-oikeus (Supreme Administrative Court of Finland) found that the association Suomen Isännöintiliitto ry and six property management companies or groups had unlawfully cooperated on price increases in 2014–2017, and raised the fines imposed by the Markkinaoikeus (Market Court) in December 2022 from a total of 4.93 million EUR to 6,558,000 EUR. Breakdown: Retta Isännöinti Oy, Retta Oy, Retta Group Oy and Retta Holding Oy 4,000,000 EUR; Oulun Kiinteistötieto Oy and Suomen Kiinteistöhallinta Oy 900,000 EUR; REIM Hämeenlinna Oy and REIM Group Oy Ltd 750,000 EUR; Colliers Finland Group Oy and Retta Isännöinti Oy 700,000 EUR; OP Koti Kainuu Oy 75,000 EUR; Suomen Isännöintiliitto ry 73,000 EUR; Kiinteistö-Tahkola Tampere Oy 60,000 EUR. The authority had originally sought 22 million EUR.
Trade associations must not circulate price recommendations, and competitors should never discuss their own prices in association bodies.
Price discussions and price recommendations in trade associations
- Authority / court
- Korkein hallinto-oikeus (KHO) auf Antrag des Kilpailu- ja kuluttajavirasto (KKV)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Kilpailulaki (948/2011) 5 § und 12 §
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 26 Jun 2025
- KKV: Korkein hallinto-oikeus määräsi Isännöintiliitolle ja alan yrityksille 6,56 miljoonan euron sakot (26.06.2025) Press release of an authority
- Korkein hallinto-oikeus, päätös 26.6.2025, taltionumero 1486 (ECLI:FI:KHO:2025:T1486) Court decision
- KHO 26.6.2025/1486 – Kilpailuasiaa koskevat valitukset (hintayhteistyö isännöintialalla) Court decision
Checked against the official source on 28 Sep 2026 · Direct link
Report an error
24 Jun 2025 Pacesetter Marketing Ltd.FINTRAC: CAD 41,085 penalty on Pacesetter Marketing Ltd. for 3 violations of anti-money laundering obligations €25,815
According to FINTRAC, Pacesetter Marketing Ltd. is a real estate brokerage based in Vancouver, British Columbia. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 41,085 on the company on 24 June 2025. According to FINTRAC's findings, made during a compliance examination, the company committed 3 violations of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violations concerned written compliance policies and procedures, assessing and documenting money laundering and terrorist financing risks and the prescribed review of the compliance programme. According to FINTRAC, the company is paying the penalty in full and the case is closed. Source: FINTRAC (Financial Transactions and Reports Analysis Centre of Canada), "Administrative monetary penalty on Pacesetter Marketing Ltd.", published 20 November 2025, https://fintrac-canafe.canada.ca/pen/amps/pen-2025-11-20-2-eng; summarised in our own words; not an official version and not a reproduction of the original.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Internal controls
- Legal basis
- PCMLTFA s. 9.6(1); PCMLTF Regulations 156(1)(b), 156(1)(c), 156(1)(f), 156(3); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 20 Nov 2025
Original amount 41,085 CAD, converted at the ECB reference rate of 24 Jun 2025.
- Administrative monetary penalty on Pacesetter Marketing Ltd. (20.11.2025) Decision of an authority
- FINTRAC – Public notice of administrative monetary penalties Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
5 Jun 2025 MAGEBA Gesellschaft m.b.H.; Maurer SE, Maurer Söhne Ges. mbH (nur Feststellung)Bridge component suppliers: €400,000 fine on MAGEBA, leniency applicant Maurer not fined €400,000
The Kartellgericht (Cartel Court) fined MAGEBA Gesellschaft m.b.H. 400,000 EUR because, from November 2017 to December 2018, it shared customers for road expansion joints and bridge bearings in Austria with a competitor and exchanged information on pricing behaviour. Against Maurer SE and Maurer Söhne Ges. mbH the court merely declared the infringement because of their leniency status. A compliance system introduced in the course of cooperation was taken into account in mitigation, and intent in a hardcore restriction as an aggravating factor.
The first to report a cartel can escape a fine entirely, while those who wait pay; this argues for internal reporting channels and quick decisions on a leniency application.
Customer allocation and the leniency programme
- Authority / court
- Oberlandesgericht Wien als Kartellgericht (Antrag der Bundeswettbewerbsbehörde)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- § 1 Abs. 1 KartG; § 29 Abs. 1 Z 1 lit. a KartG; § 28 Abs. 1 und 1a Z 1 KartG (Feststellung gegenüber Kronzeugin)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Culpability
- intentional
- Repeat case
- no
- Mitigating circumstances
- Only five projects over about 13 months, no enrichment established, low-level information exchange, the group's economic difficulties, compliance system introduced in the course of cooperation.
- Published
- 18 Nov 2025
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
29 May 2025 Immobilienmakler aus Calgary, Alberta (anonymisiert)FINTRAC: CAD 117,975 penalty on Calgary real estate brokerage – CAD 63,987.50 paid after appeal was resolved €41,033
According to FINTRAC, the company concerned is a real estate brokerage based in Calgary, Alberta; its name is not given here. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 117,975 on the company on 29 May 2025. According to FINTRAC's findings, made during a compliance examination, the company committed 5 violations of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violations concerned written compliance policies and procedures, assessing and documenting money laundering and terrorist financing risks, the compliance training programme, the prescribed review of the compliance programme and record keeping. According to FINTRAC, the policies were a generic template not tailored to the business; the account number was missing in all ten receipt of funds records reviewed. FINTRAC originally set the penalty at CAD 117,975. According to the regulator, the company appealed to the Federal Court; on 28 February 2026 the appeal was resolved, the company paid CAD 63,987.50 and the case is closed. Summarised in our own words; not an official version and not a reproduction of the original.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Customer due diligence
- Legal basis
- PCMLTFA s. 6, 9.6(1); PCMLTF Regulations 58(1)(a), 156(1)(b), 156(1)(c), 156(1)(d), 156(1)(e), 156(1)(f); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
- Action
- Fine
- Status of proceedings
- reduced
- Sector
- Construction and real estate
- Published
- 20 Nov 2025
Original amount 63,987.5 CAD, converted at the ECB reference rate of 29 May 2025.
- FINTRAC, öffentlich bekanntgemachte Verwaltungssanktionen (Liste) (Entscheidung 2025) Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Direct link
Report an error
23 May 2025 Trust-Build Engineering & Construction Pte Ltd., Hunan Fengtian Construction Group Co., LtdCCCS: SGD 4.64m in penalties on two construction firms for bid-rigging €3.19m
The Competition and Consumer Commission of Singapore (CCCS, competition and consumer protection authority) found that Hunan Fengtian Construction Group had prepared the tender documents and prices of Trust-Build Engineering & Construction for three 2022 tenders of the People's Association (works at three community clubs, total value around SGD 56 million), so that the two did not bid independently; the People's Association noticed the possible collusion, reported it and excluded both bidders from the evaluation. Under section 34 of the Competition Act 2004, CCCS imposed financial penalties of SGD 4,295,059 on Trust-Build and SGD 349,350 on Hunan Fengtian, totalling SGD 4,644,409.
Preparing a competitor's bid or knowing its prices is bid-rigging – even if neither party ultimately wins the contract.
Bid-rigging: no coordination of bids with competitors in tenders
- Authority / court
- Competition and Consumer Commission of Singapore (CCCS)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Section 34 Competition Act 2004; Geldbuße nach s 69(2)(e) Competition Act 2004
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 23 May 2025
Original amount 4,644,409 SGD, converted at the ECB reference rate of 23 May 2025.
- CCCS: CCCS Imposes A Total Of $4.6m Penalties On Contractors For Rigging Bids In Public Sector Tenders (23.05.2025) Press release of an authority
- CCS Case Register: CCCS 500-100-2023-001, Decision Date 23 May 2025 Enforcement database of an authority
- CCCS Infringement Decision, Construction Tenders, 23 May 2025 (PDF, verlinkt aus dem Case Register) Decision of an authority
Checked against the official source on 4 Oct 2026 · Direct link
Report an error
21 May 2025 HomeLife New World Realty Inc.FINTRAC: CAD 36,135 penalty on HomeLife New World Realty Inc. for 3 violations of anti-money laundering obligations €22,985
According to FINTRAC, HomeLife New World Realty Inc. is a real estate brokerage based in Toronto and Richmond Hill, Ontario. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 36,135 on the company on 21 May 2025. According to FINTRAC's findings, made during a compliance examination, the company committed 3 violations of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violations concerned written compliance policies and procedures, assessing and documenting money laundering and terrorist financing risks and record keeping. According to FINTRAC, the penalty has been paid in full and the case is closed. Source: FINTRAC (Financial Transactions and Reports Analysis Centre of Canada), "Administrative monetary penalty on HomeLife New World Realty Inc.", published 20 November 2025, https://fintrac-canafe.canada.ca/pen/amps/pen-2025-11-20-4-eng; summarised in our own words; not an official version and not a reproduction of the original.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Customer due diligence
- Legal basis
- PCMLTFA s. 6, 9.6(1); PCMLTF Regulations 58(1)(a), 58(1)(b), 156(1)(b), 156(1)(c), 156(2); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 20 Nov 2025
Original amount 36,135 CAD, converted at the ECB reference rate of 21 May 2025.
- Administrative monetary penalty on HomeLife New World Realty Inc. (20.11.2025) Decision of an authority
- FINTRAC – Public notice of administrative monetary penalties Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
19 May 2025 The Management Corporation – Strata Title Plan No. 4599 (The Scotts Tower)MCST 4599: directions after refused access request for CCTV footage Order
A person involved in a traffic accident next to the condominium requested access to the CCTV footage in April 2024; the security company could not save it for lack of administrator access, the system overwrote it after 17 days, and the management corporation then refused the request, citing other individuals' data and strata management law. The Personal Data Protection Commission (PDPC, Singapore's data protection authority) held that a blanket refusal was not justified (other individuals could have been masked) but, as the footage no longer existed, made no finding on the access obligation, and found a negligent breach of the Accountability Obligation: no data protection officer, no data protection policy of its own (only the managing agent's) and no instructions to the managing agent and security company on handling access requests. It directed the corporation to introduce, within 60 days, policies and a procedure for access requests concerning CCTV footage and to pass them on to the managing agent and contractors.
Access requests for CCTV footage need a set procedure that secures the footage before it is automatically overwritten and masks other individuals instead of refusing outright.
Recognise access requests, secure the relevant data immediately and respond in time
- Authority / court
- Personal Data Protection Commission (PDPC)
- Area of law
- Data protection · Data subject rights and transparency
- Legal basis
- Sections 11(3) und 12 PDPA 2012 (Accountability Obligation); geprüft auch Sections 21 und 22A PDPA (Auskunft, Aufbewahrung bei Ablehnung)
- Action
- Order
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Culpability
- negligent
- Mitigating circumstances
- The management corporation appointed a data protection officer after the incident.
- Published
- 7 Aug 2025
- PDPC – Enforcement Decisions: Breach of the Accountability Obligation by MCST 4599 (veröffentlicht 07.08.2025) Enforcement database of an authority
- PDPC – Decision 2025 SGPDPC 3, The Management Corporation – Strata Title Plan No. 4599, Case No. DP-2405-C2318 (19.05.2025), PDF Decision of an authority
Checked against the official source on 4 Oct 2026 · Direct link
Report an error
13 May 2025 AS Asphaltstraßensanierung, BITUNOVA, Mainka u. a. (Straßenerhaltungskartell, 7 Unternehmen)Bundeskartellamt: 10.5 million EUR against seven road repair companies €10.5m
From 2016 to 2019, seven road repair companies allocated contracting authorities regionally, determined in advance who should win the contract and set each other minimum prices for cover bids. The Bundeskartellamt imposed fines of 10.5 million EUR; BITUNOVA cooperated as leniency applicant, and all proceedings ended in settlements. Addressees: AS Asphaltstraßensanierung GmbH, bausion Strassenbau-Produkte GmbH, BITUNOVA GmbH, Gerhard Herbers GmbH, Liesen … alles für den Bau GmbH, Mainka GmbH Straßenunterhaltung, MOT Müritzer Oberflächentechnik GmbH.
Cover bids are not only subject to fines but, for the employees involved, a criminal offence of bid rigging.
Cover bids and territorial agreements in tenders
- Authority / court
- Bundeskartellamt
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- § 1 GWB
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Mitigating circumstances
- Leniency programme (BITUNOVA), settlement
- Liability of senior managers
- Measures against individuals are not reported here.
- Published
- 13 May 2025
- Kartellabsprachen zwischen Straßenreparatur-Unternehmen Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
25 Mar 2025 Evolutions Flooring Inc.Evolutions Flooring: 8.1 million USD for false manufacturer and origin information on wood flooring €7.48m
The Californian importer of multilayered wood flooring allegedly provided false information on the manufacturer and country of origin from 2019 to 2022, thereby evading anti-dumping, countervailing and Section 301 duties on Chinese goods. The settlement of 8.1 million USD is a joint payment by all settling parties and is based on the ability to pay.
State the actual manufacturer and actual country of origin in customs declarations; false information used to evade anti-dumping, countervailing or Section 301 duties can be pursued as customs fraud.
Manufacturer and origin information in customs declarations
- Authority / court
- U.S. Department of Justice, Civil Division, und U.S. Attorney’s Office Central District of California
- Area of law
- Sanctions and export control · Customs
- Legal basis
- False Claims Act, 31 U.S.C. §§ 3729 ff. (Vergleich; Haftung nicht festgestellt)
- Action
- Other
- Status of proceedings
- final
- Sector
- Construction and real estate
- Mitigating circumstances
- Settlement amount based on the ability to pay of the settling parties.
- Liability of senior managers
- Measures against individuals are not reported here.
- Published
- 25 Mar 2025
Original amount 8,100,000 USD, converted at the ECB reference rate of 25 Mar 2025.
- U.S. Department of Justice, Pressemitteilung zum Vergleich mit Evolutions Flooring Inc. (Entscheidung 2025) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
16 Jan 2025 Family International Realty LLCOFAC: USD 1.08 million settlement with Family International Realty over concealing properties of sanctioned oligarchs €1.05m
Miami real estate company Family International Realty LLC is paying USD 1,076,923 jointly with a further settling party under a settlement with OFAC (joint payment) for 73 apparent violations of the Ukraine-/Russia-related sanctions. According to OFAC's findings, between 2018 and 2023 the company, in a wilful evasion scheme, transferred nominal ownership of three luxury condominiums belonging to two sanctioned Russian oligarchs to non-sanctioned relatives and their shell companies and continued to rent them out; the company earned around USD 182,442 in commissions and reimbursements. OFAC treated the apparent violations as egregious and not voluntarily self-disclosed; the base penalty equalled the statutory maximum of USD 30,080,709. USD 182,442 is deemed satisfied by a forfeiture payment to the DOJ. Source: OFAC enforcement release of 16 January 2025, https://ofac.treasury.gov/media/933941/download?inline; summarised in our own words.
- Authority / court
- U.S. Department of the Treasury, Office of Foreign Assets Control (OFAC)
- Area of law
- Sanctions and export control · Breaches of sanctions and embargoes
- Legal basis
- E.O. 13685 §§ 2(a), 5(a), 6(a) (73 mutmaßliche Verstöße); Vergleich nach den Economic Sanctions Enforcement Guidelines, 31 C.F.R. part 501, app. A
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Liability of senior managers
- Measures against individuals are not reported here.
- Published
- 16 Jan 2025
Original amount 1,076,923 USD, converted at the ECB reference rate of 16 Jan 2025.
- OFAC Enforcement Release zu Family International Realty LLC (16.01.2025) Decision of an authority
- OFAC – 2025 Enforcement Information Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 5 · Direct link
Report an error
15 Jan 2025 Saxony: fine against estate agent for breach of AML due diligence obligations €800
The Saxony State Directorate (Landesdirektion Sachsen), as anti-money laundering supervisor for the non-financial sector, imposed a fine of 800 EUR on an estate agent, announced in anonymised form, for breach of the due diligence obligations under the German Money Laundering Act (GwG). The list of announcements shows numerous further fines and reprimands against agents ranging from 50 to 5,000 EUR.
Estate agents must identify both contracting parties in good time – even small offices are subject to active anti-money laundering supervision.
Identification of contracting parties in property brokerage
- Authority / court
- Landesdirektion Sachsen (Geldwäscheaufsicht Nichtfinanzsektor)
- Area of law
- Money laundering and terrorist financing · Customer due diligence
- Legal basis
- Geldwäschegesetz (Sorgfaltspflichten); Bekanntmachung nach § 57 GwG
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Bekanntmachungen gemäß § 57 GwG – Landesdirektion Sachsen (lfd. Nr. 29) Official register or notice
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
20 Dec 2024 Tarkus Interiors Pte Ltd; Flex Connect Pte Ltd (vormals Facility Link Pte Ltd)CCCS: 9,999,181 SGD against two interior fit-out firms for bid rigging €7.09m
From August 2016 to August 2021, Flex Connect (formerly Facility Link) and Tarkus Interiors colluded on twelve tenders for interior fit-out works in shops, food and beverage outlets and offices worth around 34.11 million SGD in total: the designated winner gave the other firm its prices and details so that it would submit a higher cover bid. On 20 December 2024 the Competition and Consumer Commission of Singapore (CCCS) imposed penalties of 5,113,918 SGD on Tarkus and 4,885,263 SGD on Flex Connect, totalling 9,999,181 SGD (the CCCS itself states the total as 9,999,182 SGD); Flex Connect received a leniency discount.
Cover bids remain prohibited collusion even if bidders fear being passed over in future tenders otherwise.
Recognising and refusing bid rigging and cover bids
- Authority / court
- Competition and Consumer Commission of Singapore (CCCS)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Competition Act 2004, s 34
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Mitigating circumstances
- Leniency discount for Flex Connect.
- Published
- 20 Dec 2024
Original amount 9,999,181 SGD, converted at the ECB reference rate of 20 Dec 2024.
- CCCS: CCCS Penalises Contractors Specialising in Non-Residential Interior Fit-Out Tenders for Bid-Rigging (20.12.2024) Press release of an authority
- CCCS Public Register: CCCS 500-100-2021-001 (Decision Date 20.12.2024) Official register or notice
Checked against the official source on 4 Oct 2026 · Direct link
Report an error
19 Dec 2024 Danske Shoppingcentre P/SDanske Shoppingcentre: 350,000 DKK for camera above urinal in City2 shopping centre €46,909
Because of vandalism, the operator of the City2 shopping centre had installed cameras in toilet areas; one camera in the men’s toilets also captured the area in front of the urinal despite a black masking, and there were no signs. The court followed the Danish Data Protection Agency (Datatilsynet) and the public prosecutor and imposed 350,000 DKK for breach of the data minimisation principle.
Cameras have virtually no place in toilet and changing areas – masking parts of the image is no substitute for checking the location.
- Authority / court
- Retten i Glostrup (auf Anzeige der Datatilsynet)
- Area of law
- Data protection · Video surveillance
- Legal basis
- DSGVO Art. 5 Abs. 1 lit. c; databeskyttelsesloven § 41; tv-overvågningsloven
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
Original amount 350,000 DKK, converted at the ECB reference rate of 19 Dec 2024.
- Datatilsynet – Danske Shoppingcentre indstilles til bøde (mit Ausgang des Verfahrens) Press release of an authority
- Domsdatabasen – Retten i Glostrup SS-9747/2023-GLO, Dom 19.12.2024 Court decision
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
19 Dec 2024 CNIL: 40,000 EUR against estate agency over constant video surveillance of staff €40,000
An estate agency (name redacted in the publication) continuously filmed workstations and break areas with image and sound, accessible via a smartphone app, and used the software Time Doctor to record keyboard and mouse activity as well as screenshots of the computers; several people accessed this data via the administrator account of one of them. The French data protection authority (CNIL) found infringements of data minimisation, legal basis, information, security and the obligation to carry out an impact assessment, and imposed 40,000 EUR.
Permanent video and audio recording of workplaces is practically never proportionate – not even in a small business.
Permissible employee monitoring and password security
- Authority / court
- Commission nationale de l'informatique et des libertés (CNIL)
- Area of law
- Data protection · Video surveillance
- Legal basis
- Art. 5 Abs. 1 lit. c, Art. 6, 12, 13, 32, 35 DSGVO
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Délibération SAN-2024-021 du 19 décembre 2024 Decision of an authority
- CNIL – Les sanctions prononcées par la CNIL (Eintrag 19/12/2024, agence immobilière) Enforcement database of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
18 Dec 2024 MaxBuild LimitedMaxBuild: 500,000 NZD in New Zealand's first criminal cartel case €273,179
The construction company coordinated its bids with a competitor in tenders run by the NZ Transport Agency (national transport authority; Northern Corridor Improvement Project) and Auckland Transport (refurbishment of the Middlemore Bridge). After guilty pleas to four charges of price fixing, the High Court in Auckland imposed a fine of 500,000 NZD on 18 December 2024 in the country's first criminal cartel prosecution; without the mitigating factors, around 1 million NZD would have been appropriate according to the court.
Cover bids in favour of a competitor have been a criminal offence in New Zealand since 2021 – tender teams must never coordinate prices with competitors.
Bid rigging and cover pricing in public tenders
- Authority / court
- High Court Auckland (Anklage: Commerce Commission)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Commerce Act 1986, s 30 (Kartellverbot, seit 8. April 2021 strafbewehrt)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Culpability
- intentional
- Mitigating circumstances
- Guilty pleas; the court took account of several mitigating factors, without which around 1 million NZD would have been appropriate.
- Liability of senior managers
- Measures against individuals are not set out here.
- Published
- 18 Dec 2024
Original amount 500,000 NZD, converted at the ECB reference rate of 18 Dec 2024.
- Commerce Commission: “Cheating the system” – sentencing in country’s first criminal cartel case (18.12.2024) Press release of an authority
- Commerce Commission: Cheating the system: Bid-rigging of roading contracts sees firm fined (23.10.2025) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
17 Dec 2024 BAM International B.V.OM: penalty order for BAM International over misrecorded facilitation payments €30,000
The Openbaar Ministerie (OM, Dutch Public Prosecution Service) imposed a penalty order of 30,000 EUR on BAM International B.V. for forgery (valsheid in geschrift): on a completed project in Africa, so-called facilitation payments had been made to officials in connection with a tax dispute, and not all of them were recorded transparently in the accounts. The company had discovered the payments in its own investigation and reported them itself; the amount reflects the OM guideline on self-reporting, cooperation and internal investigation. The OM dropped separate proceedings for bribery of public officials on other projects for lack of evidence.
Even tolerated small payments to officials must be recorded completely and transparently; self-reporting and own investigation reduce the penalty.
Facilitation payments and transparent bookkeeping
- Authority / court
- Openbaar Ministerie (OM), Functioneel Parket
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Valsheid in geschrift (Urkundenfälschung nach niederländischem Strafrecht); Strafbefehl des OM
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Mitigating circumstances
- Self-reporting, own investigation and cooperation with the investigation.
- Published
- 17 Dec 2024
- OM: Strafbeschikking en sepot in onderzoek naar BAM International B.V. Press release of an authority
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
11 Dec 2024 Granit Bostad Beritsholm ABGranit Bostad Beritsholm: 200,000 SEK for round-the-clock video surveillance in a block of flats €17,366
The landlord monitored a multi-family building in Malmö around the clock with cameras at entrances, lifts, flat doors, in the stairwell, the basement and the refuse room, without any legal basis for doing so; the signs did not name the controller. The Swedish Authority for Privacy Protection (IMY) imposed 200,000 SEK and ordered the landlord to stop the surveillance except in the garage and to supplement the signs.
Video surveillance in residential buildings requires a balancing of interests for each individual area – problems such as vandalism do not justify blanket, permanent surveillance.
- Authority / court
- Integritetsskyddsmyndigheten (IMY)
- Area of law
- Data protection · Video surveillance
- Legal basis
- DSGVO Art. 6 Abs. 1, Art. 13
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 12 Dec 2024
Original amount 200,000 SEK, converted at the ECB reference rate of 11 Dec 2024.
- IMY – Tillsyn Granit Bostad Beritsholm AB Decision of an authority
- IMY – Beslut efter tillsyn, IMY-2023-15373 (11.12.2024) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
20 Nov 2024 Immobilienmakler aus Laval, Québec (anonymisiert)FINTRAC: CAD 107,250 penalty on real estate broker from Laval for 4 violations of anti-money laundering obligations €72,628
According to FINTRAC, the company concerned is a real estate brokerage based in Laval, Quebec; its name is not given here. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 107,250 on the company on 20 November 2024. According to FINTRAC's findings, made during a compliance examination, the company committed 4 violations of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violations concerned written compliance policies and procedures, assessing and documenting money laundering and terrorist financing risks, the compliance training programme and the prescribed review of the compliance programme. Specifically, FINTRAC found five gaps in the policies, including on beneficial ownership, third-party determination and politically exposed persons; the risk assessment consisted of a generic form without risk levels or mitigation measures. According to FINTRAC, the company has appealed the decision to the Federal Court. Summarised in our own words; not an official version and not a reproduction of the original.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Internal controls
- Legal basis
- PCMLTFA s. 9.6(1); PCMLTF Regulations 156(1)(b), 156(1)(c), 156(1)(e), 156(1)(f), 156(2), 156(3); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
- Action
- Fine
- Status of proceedings
- under appeal
- Sector
- Construction and real estate
- Published
- 1 May 2025
Original amount 107,250 CAD, converted at the ECB reference rate of 20 Nov 2024.
- FINTRAC, öffentlich bekanntgemachte Verwaltungssanktionen (Liste) (Entscheidung 2024) Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Direct link
Report an error
6 Nov 2024 Strabag AG (Köln); Kemna Bau Andreae GmbH & Co. KG als Kronzeuge ohne BußgeldBundeskartellamt: 2.79 million EUR against Strabag over collusion on Cologne's Zoobrücke €2.79m
In the tender for the refurbishment of the Zoobrücke bridge in Cologne in early 2017, employees agreed that one company would submit a cover bid so that the other would win the contract, in return for a later compensation payment. According to the Bundeskartellamt's findings, Strabag received a fine of 2.79 million EUR in a settlement procedure; the proceedings against Kemna were discontinued as it was the leniency applicant.
A single rigged tender is enough for a fine and criminal proceedings – compensation payments between bidders are a clear red flag.
Cover bids and compensation payments in individual tenders
- Authority / court
- Bundeskartellamt
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- § 1 GWB
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Employees
- 10,000 or more
- Mitigating circumstances
- Settlement
- Liability of senior managers
- Bid rigging is also a criminal offence for the individuals involved under Section 298 StGB (German Criminal Code); their prosecution is a matter for the public prosecutor.
- Published
- 6 Nov 2024
- Geldbuße gegen die Strabag AG wegen Absprachen bei der Sanierung der Zoobrücke in Köln Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
6 Nov 2024 595 Construction LLCIllinois framing contractor: OSHA proposes $287,465 over alleged unprotected work at height €268,784
According to OSHA, in May 2024 inspectors saw carpenters of the Crystal Lake company working on residential buildings in Elburn at heights of over 6 feet without fall protection three times within one month; training records and forklift certifications were also missing, and rigging equipment was damaged. The company had already been cited in 2022 and 2023. OSHA proposed penalties of $287,465; the violations are alleged and may be contested.
Training records are mandatory, but only daily checks on site prevent falls.
Fall protection and hazard recognition on construction sites
Missing or inadequate training played a role in the decision.
- Authority / court
- U.S. Department of Labor – Occupational Safety and Health Administration (OSHA)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- 29 CFR 1926 Subpart M (Fall Protection) u. a.
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Culpability
- intentional
- Repeat case
- yes
- Published
- 6 Nov 2024
Original amount 287,465 USD, converted at the ECB reference rate of 6 Nov 2024.
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
16 Oct 2024 OGH: 65,000 EUR fine against joinery over cover bids and market sharing €65,000
From February 2011 to October 2016, a construction and furniture joinery anonymised in the decision (together with its general partner GmbH) participated in agreements on successful bidders, cover bids, market sharing and information exchange in tenders in Lower Austria and Vienna. The Cartel Court imposed a fine of 55,000 EUR only for 26 infringements up to June 2016; the OGH upheld the appeals of the BWB and the Federal Cartel Prosecutor and set a fine of 65,000 EUR on a joint and several basis for the entire period.
Even small craft businesses are penalised for cover bids – "courtesy bids" among colleagues are competition law infringements.
Cover bids in tenders for craft trades
- Authority / court
- Oberster Gerichtshof als Kartellobergericht (Antrag der Bundeswettbewerbsbehörde)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- § 1 Abs 1 KartG 2005, §§ 28, 29 KartG
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- OGH 16 Ok 6/23b vom 16.10.2024 Court decision
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
27 Sep 2024 a US landlord of single-family homesLandlord pays 48 million USD in FTC settlement over hidden mandatory fees €43m
According to the FTC, the large US landlord of single-family homes advertised monthly rents without mandatory additional fees (for example for smart home technology or utility management), which could add up to more than 1,700 USD a year and only appeared in the lease; further allegations concerned withheld security deposits and evictions. Under the settlement, the landlord is paying 48 million USD for refunds and must include mandatory fees in the advertised price.
Unavoidable fees belong in the first advertised price, not in the contract documents.
- Authority / court
- Federal Trade Commission (FTC)
- Area of law
- Consumer protection and online retail · Misleading advertising and pricing
- Legal basis
- Section 5 FTC Act
- Action
- Disgorgement of profits
- Status of proceedings
- final
- Sector
- Construction and real estate
- Employees
- 1,000 to 9,999
- Published
- 24 Sep 2024
Original amount 48,000,000 USD, converted at the ECB reference rate of 27 Sep 2024.
- FTC, Pressemitteilungen (Übersicht) (Entscheidung 2024) Press release of an authority
- SEC, EDGAR Unternehmensberichte (Suche) (Entscheidung 2024) Official register or notice
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 27 Sep 2026 · Direct link
Report an error
29 Aug 2024 a UK concierge and property services companyOFSI: GBP 15,000 penalty for concierge services company over payments for a designated person's property €17,820
On 29 August 2024 OFSI imposed a monetary penalty of GBP 15,000 on a UK concierge and property services company. According to OFSI's findings, the small property management company made or received 26 payments totalling GBP 15,487.30 in 2022 and 2023 in connection with a property owned by a designated person, thereby dealing with frozen funds or making funds available for that person's benefit. Other payments were covered by a general licence, but the company failed to make the reports the licence required; OFSI treated this as a further breach and as an aggravating factor but did not impose a separate penalty for it. The company had not disclosed the breaches voluntarily. It made no representations and did not request a ministerial review. Contains public sector information licensed under the Open Government Licence v3.0 (https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/).
- Authority / court
- HM Treasury, Office of Financial Sanctions Implementation (OFSI)
- Area of law
- Sanctions and export control · Breaches of sanctions and embargoes
- Legal basis
- regulations 11(1) and 13(1) of the Russia (Sanctions) (EU Exit) Regulations 2019; Geldbuße nach section 146 Policing and Crime Act 2017
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 26 Sep 2024
Original amount 15,000 GBP, converted at the ECB reference rate of 29 Aug 2024.
- OFSI, Durchsetzung von Finanzsanktionen (Übersicht) (Entscheidung 2024) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 29 Aug 2026 · Direct link
Report an error
20 Aug 2024 a Dutch financial holding companyAFM: EUR 3 million fine on a financial holding company for market manipulation (under appeal) €3m
On 20 August 2024 the Dutch Authority for the Financial Markets (AFM) fined a Dutch financial holding company, mainly active in real estate, EUR 3 million for market manipulation. The holding company held a large stake in a listed Dutch company; on 20 September 2022 it instructed its bank to sell up to 1.2 million shares off-market and at the same time bought small quantities at high limits on three trading days, pushing the share price up. The AFM rejected the objection on 17 April 2025; the holding company lodged an appeal with the competent court on 28 May 2025.
A holder planning to sell a large block of shares must not push the price up at the same time with aggressive buy orders.
Prohibition of market manipulation when selling large blocks of shares
- Authority / court
- Autoriteit Financiële Markten (AFM)
- Area of law
- Capital markets and financial supervision · Market abuse and insider dealing
- Legal basis
- Art. 15 Verordnung (EU) Nr. 596/2014 (Marktmissbrauchsverordnung, MAR)
- Action
- Fine
- Status of proceedings
- under appeal
- Sector
- Construction and real estate
- Published
- 20 Dec 2024
- AFM: VDVI B.V. krijgt AFM-boete van €3 miljoen wegens marktmanipulatie Press release of an authority
- AFM: Boetebesluit VDVI B.V. (20 augustus 2024) Decision of an authority
- AFM: Actuele stand van zaken – bestuurlijke boete VDVI B.V. (update 18 juli 2025) Decision of an authority
Checked against the official source on 2 Oct 2026 · Company name anonymised since 20 Aug 2026 · Direct link
Report an error
15 Aug 2024 a UK windows and conservatories companyICO: GBP 40,000 fine for windows company over calls to TPS numbers €46,721
On 15 August 2024 the ICO fined a UK windows and conservatories company GBP 40,000 and served an enforcement notice on the same day. According to the ICO's findings, between 1 January and 1 June 2023 the company made 18,280 unsolicited marketing calls to lines that had been on the TPS or CTPS opt-out registers for at least 28 days, without the subscribers having agreed to such calls; eight complaints resulted. The ICO treated this as a breach of regulation 21(1)(b) of PECR. Under the notice, payment by 16 September 2024 reduced the fine to GBP 32,000.
- Authority / court
- Information Commissioner's Office (ICO)
- Area of law
- Data protection · Marketing and consent
- Legal basis
- Regulation 21(1)(b) PECR; section 55A DPA 1998 (Geldbuße); section 40 DPA 1998 (Enforcement Notice)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
Original amount 40,000 GBP, converted at the ECB reference rate of 15 Aug 2024.
- ICO, Übersicht der Durchsetzungsmaßnahmen (Entscheidung 2024) Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 15 Aug 2026 · Direct link
Report an error
17 Jul 2024 a real estate brokerage based in QuebecFINTRAC: CAD 36,360 penalty on real estate brokerage based in Quebec for 4 violations of anti-money laundering obligations €24,323
According to FINTRAC, the company is a real estate brokerage based in Quebec. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 36,360 on the company on 17 July 2024. According to FINTRAC's findings, made during a compliance examination, the company committed 4 violations of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violations concerned written compliance policies and procedures, the compliance training programme and client identification. According to FINTRAC, the company is paying the penalty in full and the case is closed. Summarised in our own words; not an official version and not a reproduction of the original.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Customer due diligence
- Legal basis
- PCMLTFA s. 6; PCMLTF Regulations 64.2, 65(4), 71(1)(b), 71(1)(d); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 6 May 2025
Original amount 36,360 CAD, converted at the ECB reference rate of 17 Jul 2024.
- FINTRAC, öffentlich bekanntgemachte Verwaltungssanktionen (Liste) (Entscheidung 2024) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 17 Jul 2026 · Direct link
Report an error
27 Jun 2024 a real estate brokerage based in OntarioFINTRAC: CAD 57,750 penalty on real estate brokerage for 3 violations of anti-money laundering obligations €39,428
According to FINTRAC, the company is a real estate brokerage based in North York, Ontario. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 57,750 on the company on 27 June 2024. According to FINTRAC's findings, made during a compliance examination in 2022, the company committed 3 violations of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violations concerned written compliance policies and procedures, assessing and documenting money laundering and terrorist financing risks and the prescribed review of the compliance programme. According to FINTRAC, the penalty has been paid in full and the case is closed. Summarised in our own words; not an official version and not a reproduction of the original.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Internal controls
- Legal basis
- PCMLTF Regulations 71(1)(b), 71(1)(c), 71(1)(e); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 24 Sep 2024
Original amount 57,750 CAD, converted at the ECB reference rate of 27 Jun 2024.
- FINTRAC, öffentlich bekanntgemachte Verwaltungssanktionen (Liste) (Entscheidung 2024) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 27 Jun 2026 · Direct link
Report an error
6 Jun 2024 a British timber importer in the construction sectorBritish timber importer: notice of remedial action – timber imported without due diligence Order
As operator, the company placed pine plywood from Russia on the market without exercising due diligence to reduce the risk of illegally harvested timber in the supply chain to a negligible level. The Office for Product Safety and Standards (OPSS) issued a Notice of Remedial Action under Regulation 11 of the Timber Regulations 2013.
Anyone placing timber or timber products on the market for the first time must check and document origin and legality – including for supplies from neighbouring countries.
Due diligence in timber purchasing (origin, legality of harvest, risk mitigation)
- Authority / court
- Office for Product Safety and Standards (OPSS), Department for Business and Trade
- Area of law
- Supply chain and human rights · Supply chain due diligence
- Legal basis
- Timber and Timber Products (Placing on the Market) Regulations 2013, Regulation 4(b) (Sorgfaltspflicht nach Verordnung (EU) Nr. 995/2010 in der im UK fortgeltenden Fassung)
- Action
- Order
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- OPSS, Enforcement Actions (Übersicht) (Entscheidung 2024) Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 6 Jun 2026 · Direct link
Report an error
21 May 2024 eleven French precast concrete manufacturersPrecast concrete: EUR 76.645 million for four cartels involving eleven manufacturers €76.6m
The Autorité de la concurrence (French Competition Authority) sanctioned four cartels in the sale of precast concrete products which, depending on the objection, lasted from 2008 or 2011 to 2017/2018; eleven manufacturers took part, one of them together with a subsidiary. The highest fines were imposed on three manufacturers (EUR 25.45 million, EUR 19.04 million and EUR 10.99 million); the amount for a further manufacturer includes EUR 75,000 for obstructing the investigation. The practices were uncovered through criminal proceedings, after which the two most heavily fined manufacturers applied for leniency.
The fact that participants regard a cartel as customary in the industry is no defence; traditional industries in particular need regular reviews of contacts with competitors.
Cartels in traditional industries; leniency
- Authority / court
- Autorité de la concurrence
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Art. L. 420-1 Code de commerce; Art. 101 Abs. 1 AEUV (nicht für alle Beschwerdepunkte)
- Action
- Fine
- Status of proceedings
- under appeal
- Sector
- Construction and real estate
- Mitigating circumstances
- Leniency: fine reductions for the two most heavily fined manufacturers.
- Published
- 3 Jun 2024
- Autorité de la concurrence, Liste des décisions et avis (Übersicht) (Entscheidung 2024) Enforcement database of an authority
Checked against the official source on 7 Oct 2026 · Version 2 · Company name anonymised since 21 May 2026 · Direct link
Report an error
21 May 2024 fourteen Swiss gravel and construction companiesWEKO fines a gravel pit and its shareholders CHF 5.3 million €5.37m
A gravel extraction joint venture, the largest gravel and landfill pit in its region, and its shareholders coordinated through the joint venture's board, granted the shareholders cheaper gravel prices and transport subsidies, undertook not to extract gravel themselves in the joint venture's area and for a time tied the dumping of excavated material to gravel purchases. The Wettbewerbskommission (WEKO, Swiss Competition Commission) imposed sanctions totalling CHF 5,303,750: CHF 3,131,100 on the joint venture, CHF 383,150 on a first shareholder group of three companies, CHF 304,150 on a second group of three companies, CHF 460,750 on a third group of two companies, CHF 242,500 on a gravel works, CHF 387,100 on a fourth group of two companies and CHF 395,000 on a fifth group of two companies, together with conduct requirements concerning the joint venture's board and management. With the exception of individual points, the ruling is under appeal before the Federal Administrative Court (as of December 2025).
Where competitors sit together on the board of a joint venture, clear information barriers are needed, or the board becomes a cartel platform.
Joint ventures between competitors: information exchange and collusion on the board
- Authority / court
- Wettbewerbskommission (WEKO)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Art. 49a Abs. 1 i.V.m. Art. 5 Abs. 1, 3 und 4 KG; bei KAGA zusätzlich Art. 7 Abs. 1 i.V.m. Abs. 2 KG
- Action
- Fine
- Status of proceedings
- under appeal
- Sector
- Construction and real estate
- Mitigating circumstances
- Several parties concluded amicable settlements with the WEKO secretariat, which WEKO approved.
- Published
- 27 Aug 2024
Original amount 5,303,750 CHF, converted at the ECB reference rate of 21 May 2024.
- WEKO, Entscheide (Übersicht) (Entscheidung 2024) Decision of an authority
Checked against the official source on 2 Oct 2026 · Company name anonymised since 21 May 2026 · Direct link
Report an error
26 Apr 2024 two Latvian construction companiesLatvia: bid rigging in energy-efficiency renovations in Saldus – 108,472 EUR €108,472
Acting on information from the Centrālā finanšu un līgumu aģentūra (CFLA, Central Finance and Contracting Agency), the Konkurences padome (Latvian Competition Council) found that two construction companies exchanged confidential bid information and allocated among themselves who would win which project in tenders by homeowners’ associations in Saldus for energy-efficiency renovation of apartment buildings. After a settlement with a 10 % reduction, the first company pays 53,506.52 EUR and the second 54,965.84 EUR, totalling 108,472.36 EUR.
Bid documents must never be shared with other bidders, not even with friendly local firms.
No coordination with competitors in tenders
- Authority / court
- Konkurences padome (Lettischer Wettbewerbsrat)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Art. 11 Abs. 1 Konkurences likums (Wettbewerbsgesetz)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Mitigating circumstances
- Both companies acknowledged the infringement and undertook not to challenge the decision; in return the fines were reduced by 10 %. The first company had previously received an additional 5 % reduction because it provided further information on its own initiative and committed to measures ensuring future compliance.
- Published
- 7 May 2024
- Konkurences padome, Entscheidungen (Datenbank) (Entscheidung 2024) Decision of an authority
Checked against the official source on 28 Sep 2026 · Company name anonymised since 26 Apr 2026 · Direct link
Report an error
9 Apr 2024 a Scottish charitable social landlordICO: reprimand for housing association over a faulty tenant portal Reprimand or warning
The ICO issued a reprimand to a Scottish charitable social landlord with around 4,700 properties. According to the ICO's findings, a new customer portal went live on 14 July 2022 with a configuration error that gave residents with an ongoing anti-social behaviour case access to other residents' documents. 139 people were affected, 62 of whom the association considered at high risk; the data remained visible for five days because a first report from a resident was not escalated. According to the association, testing before launch had only checked functionality, not data protection. The ICO found this breached Article 5(1)(f) UK GDPR. The reprimand is undated; the date follows the ICO case page.
- Authority / court
- Information Commissioner's Office (ICO)
- Area of law
- Data protection · Data breaches and data security
- Legal basis
- Art. 5(1)(f) UK GDPR; Verwarnung nach Art. 58(2)(b) UK GDPR
- Action
- Reprimand or warning
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- ICO, Übersicht der Durchsetzungsmaßnahmen (Entscheidung 2024) Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 9 Apr 2026 · Direct link
Report an error
13 Mar 2024 a real estate brokerage based in OntarioFINTRAC: CAD 107,827.50 penalty on real estate brokerage based in Ontario for 6 violations of anti-money laundering obligations €73,074
According to FINTRAC, the company is a real estate brokerage based in Toronto, Ontario. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 107,827.50 on the company on 13 March 2024. According to FINTRAC's findings, made during a compliance examination in 2022, the company committed 6 violations of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violations concerned written compliance policies and procedures, assessing and documenting money laundering and terrorist financing risks, the compliance training programme, the prescribed review of the compliance programme, record keeping and client identification. Specifically, FINTRAC criticised among other things a risk assessment based on a generic checklist, incomplete records and 14 cases in which identification details were missing for persons who provided funds for real estate transactions. According to FINTRAC, the penalty has been paid in full and the case is closed. Summarised in our own words; not an official version and not a reproduction of the original.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Customer due diligence
- Legal basis
- PCMLTF Regulations 39(1), 64.2, 71(1)(b), 71(1)(c), 71(1)(d), 71(1)(e); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 29 Oct 2024
Original amount 107,827.5 CAD, converted at the ECB reference rate of 13 Mar 2024.
- FINTRAC, öffentlich bekanntgemachte Verwaltungssanktionen (Liste) (Entscheidung 2024) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 13 Mar 2026 · Direct link
Report an error
29 Feb 2024 a Japanese homebuilding group and four group companiesHomebuilding group and four homebuilders: orders over 'No. 1' claims without objective survey Order
The holding company of a homebuilding group and four group companies advertised custom-built homes in 2022 and 2023 on websites, in social media posts and in flyers as 'No. 1' in three categories, such as the range of building plots on offer and 'high quality at low cost'. The underlying survey only asked for impressions of selected providers' websites and did not check whether respondents knew the services; on 29 February 2024 a cease-and-desist order was issued against each of the five companies.
Ranking and 'No. 1' claims require an objective survey of actual customers; a website impression test run by a service provider is not sufficient.
'No. 1' claims and rankings
- Authority / court
- Consumer Affairs Agency (消費者庁, CAA)
- Area of law
- Consumer protection and online retail · Misleading advertising and pricing
- Legal basis
- Art. 7 Abs. 1 i. V. m. Art. 5 Nr. 1 Act against Unjustifiable Premiums and Misleading Representations (不当景品類及び不当表示防止法, Gesetz Nr. 134/1962)
- Action
- Order
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 1 Mar 2024
- Consumer Affairs Agency (消費者庁, CAA), Veröffentlichung der Behörde (Entscheidung 2024) Decision of an authority
Checked against the official source on 7 Oct 2026 · Company name anonymised since 28 Feb 2026 · Direct link
Report an error
28 Feb 2024 two Dutch construction companiesNetherlands: 59,000 EUR against construction company over sham bid in school playground tender €59,000
In the tender for the design of a school playground in Roermond, a construction company passed its bid on in advance to a co-bidder, which then deliberately bid higher (cover pricing). The Netherlands Authority for Consumers and Markets (ACM) imposed a fine of 59,000 EUR on the company that passed on its bid; the co-bidder escaped a fine as the first to come forward.
Even a single "helper bid" between construction companies on a small municipal contract is sanctioned – the first to come forward goes unpunished.
Passing on one's own bids to co-bidders
- Authority / court
- Autoriteit Consument & Markt (ACM)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Art. 6 Mededingingswet (Kartellverbot)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Mitigating circumstances
- Leniency programme (co-bidder 100 %), fine reduction for the company that passed on its bid for cooperation and acknowledgement
- Published
- 7 Mar 2024
- ACM, Veröffentlichungen (Übersicht) (Entscheidung 2024) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 28 Feb 2026 · Direct link
Report an error
11 Jan 2024 a UK company making home improvement marketing callsICO: GBP 100,000 fine for UK company over marketing calls about driveways and grants €116,083
On 11 January 2024 the ICO fined the company GBP 100,000 and served an enforcement notice on the same day. According to the ICO's findings, between 2 March and 31 May 2022 the company instigated 614,342 unsolicited marketing calls to numbers that had been registered with the TPS for more than 28 days; complainants said the calls promoted energy grants for resin driveways. The people called were also not given the caller information required by law. The ICO treated this as a breach of regulations 21 and 24 of PECR. Under the notice, payment by 13 February 2024 reduced the fine to GBP 80,000.
- Authority / court
- Information Commissioner's Office (ICO)
- Area of law
- Data protection · Marketing and consent
- Legal basis
- Regulation 21 und 24 PECR; section 55A DPA 1998 (Geldbuße); section 40 DPA 1998 (Enforcement Notice)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
Original amount 100,000 GBP, converted at the ECB reference rate of 11 Jan 2024.
- ICO, Übersicht der Durchsetzungsmaßnahmen (Entscheidung 2024) Enforcement database of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 11 Jan 2026 · Direct link
Report an error
8 Jan 2024 a real estate brokerage based in British ColumbiaFINTRAC: CAD 83,655 penalty on real estate brokerage for 5 violations of anti-money laundering obligations €57,098
According to FINTRAC, the company is a real estate brokerage based in West Vancouver, British Columbia. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 83,655 on the company on 8 January 2024. According to FINTRAC's findings, made during a compliance examination in 2021, the company committed 5 violations of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violations concerned written compliance policies and procedures, assessing and documenting money laundering and terrorist financing risks, the prescribed review of the compliance programme, record keeping and client identification. Specifically, FINTRAC found among other things that no third-party determination had been documented, that three of 25 client records reviewed were incomplete and that identification details were missing for two persons who provided funds. According to FINTRAC, the penalty has been paid in full and the case is closed. Summarised in our own words; not an official version and not a reproduction of the original.
- Authority / court
- Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
- Area of law
- Money laundering and terrorist financing · Customer due diligence
- Legal basis
- PCMLTF Regulations 39(1)(b), 64.2, 71(1)(b), 71(1)(c), 71(1)(e); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 16 Jul 2024
Original amount 83,655 CAD, converted at the ECB reference rate of 8 Jan 2024.
- FINTRAC, öffentlich bekanntgemachte Verwaltungssanktionen (Liste) (Entscheidung 2024) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 8 Jan 2026 · Direct link
Report an error
15 Dec 2023 two Canadian construction companies (a steel fabricator and a concrete firm)Building collapse in Ontario: steel fabricator and concrete firm pay CA$400,000 €272,982
In December 2020, part of a new building collapsed while concrete was being poured on the roof level; two workers died and four were seriously injured. The manufacturer of the structural steel system had not ensured its load-bearing capacity, and the concrete firm had not adequately instructed its workers on correct measuring procedures. Fines of CA$260,000 (steel fabricator) and CA$140,000 (concrete firm).
In subcontracting chains, the structural system manufacturer and the supervising contractor each remain responsible in their own right – passing on the work does not relieve them.
Instruction on concrete pouring specifications and load limits
Missing or inadequate training played a role in the decision.
- Authority / court
- Ontario Court of Justice London (Ermittlung: Ontario Ministry of Labour, Immigration, Training and Skills Development)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 25(1)(e)(iii) und Section 25(2)(a) Occupational Health and Safety Act (Ontario)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Mitigating circumstances
- Guilty pleas by both companies.
- Published
- 5 Jan 2024
Original amount 400,000 CAD, converted at the ECB reference rate of 15 Dec 2023.
- Ontario Ministry of Labour, Meldungen (Übersicht) (Entscheidung 2023) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 15 Dec 2025 · Direct link
Report an error
7 Dec 2023 an Austrian non-profit housing companyNon-profit housing company: €10,000 for ignoring data protection authority requests €10,000
The DSB (Datenschutzbehörde, Austrian data protection authority) fined a non-profit housing company limited by shares 10,000 EUR because it left several requests for comments in a complaint procedure between November 2021 and June 2022 unanswered, thereby breaching its duty to cooperate with the supervisory authority. The cause was internal failings in forwarding official letters; the DSB found conditional intent. Mitigating factors were the confession, the absence of previous infringements and a new control system for official mail together with staff training.
Mail from supervisory authorities needs a reliable internal intake and forwarding process with deadline control, otherwise silence alone leads to a fine.
Handling letters from the data protection authority
Missing or inadequate training played a role in the decision.
- Authority / court
- Datenschutzbehörde (DSB)
- Area of law
- Data protection
- Legal basis
- Art. 31 iVm Art. 58 Abs. 1 lit. a und e DSGVO; Art. 83 Abs. 4 lit. a DSGVO
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Culpability
- intentional
- Repeat case
- no
- Mitigating circumstances
- No previous infringements; cooperation, insight and confession; new control system for official documents and internal data protection training.
- RIS, Entscheidungen der Datenschutzbehörde (Suche) (Entscheidung 2023) Decision of an authority
Checked against the official source on 2 Oct 2026 · Company name anonymised since 7 Dec 2025 · Direct link
Report an error
4 Dec 2023 a French engineering and design firmPNF: CJIP with an engineering firm for €14.6m over suspected foreign bribery €14.6m
The engineering firm undertook to pay a public interest fine of 14,600,000 EUR under a CJIP (convention judiciaire d'intérêt public, French deferred prosecution agreement) concluded on 29 November 2023 and validated on 4 December 2023. The investigation, including for bribery of foreign public officials, stemmed from a criminal complaint through which the company itself had passed audit reports and an anonymous letter to the judicial authorities in 2013.
Internal audit findings and anonymous tip-offs about bribery should be investigated immediately; self-reporting does not, however, rule out a later sanction.
Handling internal indications of bribery, and self-reporting
- Authority / court
- Parquet national financier (PNF); Validierung durch den Präsidenten des Tribunal judiciaire de Paris
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale (corruption d'agent public étranger)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 4 Dec 2023
- Communiqué de presse du Procureur de la République financier, 4 décembre 2023 (CJIP ADP Ingénierie) Press release of an authority
- Ministère de la Justice: Liste der Conventions judiciaires d'intérêt public Official register or notice
Checked against the official source on 2 Oct 2026 · Company name anonymised since 4 Dec 2025 · Direct link
Report an error
21 Nov 2023 a Californian construction companyCalifornian construction company: over 1 million USD – up to 68 hours a week without overtime pay Other
Employees of the Californian construction company regularly worked 45 to 68 hours a week without being paid for overtime; there was also no paid sick leave and no proper wage statements. The California Labor Commissioner’s Office concluded a settlement with the company of more than 1 million USD for the benefit of 249 construction workers.
Anyone allowing long working weeks must also record and pay for them in full – systematic unrecorded overtime comes to light in every wage audit.
- Authority / court
- California Labor Commissioner's Office (Division of Labor Standards Enforcement)
- Area of law
- Health and safety and employment law · Working time
- Legal basis
- California Labor Code (Überstunden, Paid Sick Leave, Lohnabrechnung)
- Action
- Other
- Status of proceedings
- final
- Sector
- Construction and real estate
- California DIR, Medienraum (Übersicht) (Entscheidung 2023) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 21 Nov 2025 · Direct link
Report an error
15 Nov 2023 an Austrian construction holding company and two construction companiesConstruction cartel: €9.8m on a construction holding and two construction companies €9.8m
The Kartellgericht (Cartel Court) imposed a fine of 9.8 million EUR, jointly and severally, on an Austrian construction holding company and two construction companies for taking part in the construction cartel from July 2002 to October 2017. Because of their significant role in Lower Austria and Styria they were treated as main participants; collusion also concerned individual projects in other federal provinces. The acknowledgement given in the consensual termination of the proceedings and a certified compliance management system were taken into account in mitigation.
A company that plays a leading regional role in a cartel is classed as a main participant; an effective compliance system lowers the fine but does not replace timely detection.
Bid rigging in tenders
- Authority / court
- Oberlandesgericht Wien als Kartellgericht (Antrag der Bundeswettbewerbsbehörde)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- § 1 Abs. 1 KartG und Art. 101 Abs. 1 AEUV; § 29 Abs. 1 Z 1 lit. a und d KartG
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Culpability
- intentional
- Repeat case
- no
- Mitigating circumstances
- Consensual termination of the proceedings with a full acknowledgement; certified compliance management system.
- Published
- 5 Mar 2024
Checked against the official source on 2 Oct 2026 · Company name anonymised since 15 Nov 2025 · Direct link