Compliance Radar

Who was sanctioned, and for what?

Fines, court rulings and incidents from Europe, North America, Latin America, Asia-Pacific, Middle East and Africa: 2,207 cases from 44 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.

127cases from 27 jurisdictions
€604.9mTotal of monetary amounts (108 cases with an amount)
€226,380Median per case with an amount

Click a bar to drill down one level.

Where?

by region

All jurisdictions

  1. EU €312.4m 52 % · 42 cases
  2. United Kingdom €191.1m 32 % · 29 cases
  3. USA €71.3m 12 % · 12 cases
  4. Brazil €11.7m 2 % · 3 cases
  5. Singapore €10.3m 2 % · 4 cases
  6. Switzerland €5.37m 1 % · 3 cases
  7. Canada €1.56m 0 % · 20 cases
  8. Australia €730,384 0 % · 5 cases
  9. New Zealand €292,765 0 % · 2 cases
  10. Hong Kong €223,452 0 % · 5 cases
  11. 2 more€2,596

What for?

by area of law

All areas of law

  1. Competition law €437.6m 72 % · 34 cases
  2. Bribery and corruption €69.5m 11 % · 6 cases
  3. Consumer protection and online retail €47.1m 8 % · 7 cases
  4. Sanctions and export control €27.2m 4 % · 7 cases
  5. Capital markets and financial supervision €8.3m 1 % · 4 cases
  6. Health and safety and employment law €7.27m 1 % · 22 cases
  7. Information security and cyber €5.06m 1 % · 3 cases
  8. Data protection €1.71m 0 % · 18 cases
  9. Money laundering and terrorist financing €894,152 0 % · 18 cases
  10. Environment and sustainability €251,420 0 % · 3 cases
  11. 1 more€0

Who?

by company
  1. Anonymised companies €304.6m 50 % · 46 cases
  2. Barratt Redrow, Persimmon, Taylor Wimpey u. a. (7 Wohnungsbauunternehmen) €113.6m 19 % · 1 case
  3. AS Asphaltstraßensanierung GmbH, BITUNOVA GmbH, Kutter Spezialstraßenbau GmbH & Co. KG, Possehl Construction GmbH (inkl. VSI), Liesen…alles für den Bau GmbH, OAT GmbH/Otto Alte-Teigeler GmbH €60.3m 10 % · 1 case
  4. Colas Rail Asia Sdn Bhd (Colas-Gruppe) €29.7m 5 % · 1 case
  5. Allied Stone Inc. €10.6m 2 % · 1 case
  6. AS Asphaltstraßensanierung, BITUNOVA, Mainka u. a. (Straßenerhaltungskartell, 7 Unternehmen) €10.5m 2 % · 1 case
  7. Strukton Civiel Projecten B.V. und Strukton International B.V. (Strukton-Gruppe) €10m 2 % · 1 case
  8. Decora S.A., Bel-Pol sp. z o.o. €7.9m 1 % · 1 case
  9. Evolutions Flooring Inc. €7.48m 1 % · 1 case
  10. Tarkus Interiors Pte Ltd; Flex Connect Pte Ltd (vormals Facility Link Pte Ltd) €7.09m 1 % · 1 case
  11. 64 more€42.3m

When?

per year, by date of decision
Trend
PeriodCasesTotal
202210€42.5m
202322€133.5m
202426€139.3m
202531€169.3m
202638€120.3m

127 cases

24 Sep 2026 M&J GroupCMA: fine against construction firm for concealing evidence during an inspection United KingdomCartels and collusion €29,075

During an inspection as part of an investigation into bid rigging, a work mobile phone and documents were removed from the premises on the instructions of a manager, and possession of a work mobile phone was denied. The UK Competition and Markets Authority (CMA) imposed a fine of 25,000 GBP on M&J.

What organisations can take from it

Dawn raid training is mandatory: removing mobile phones or documents during an inspection obstructs the investigation, even when acting on instructions.

Relevance to training and awareness

Correct conduct during inspections (dawn raids), no removal of evidence

Authority / court
Competition and Markets Authority (CMA)
Area of law
Competition law · Cartels and collusion
Legal basis
Section 40A(1) Competition Act 1998
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Culpability
intentional
Liability of senior managers
Measures against individuals are not reported here.
Published
24 Sep 2026

Original amount 25,000 GBP, converted at the ECB reference rate of 24 Sep 2026.

Sources

Checked against the official source on 28 Sep 2026 · Version 3 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

22 Sep 2026 Carioca Christiani-Nielsen Engenharia S.A.Carioca Engenharia pays 6.13 million BRL in CADE settlement on construction tenders BrazilCartels and collusion €1.04m

Carioca Christiani-Nielsen Engenharia S.A. concluded a single settlement (Termo de Compromisso de Cessação) with the Conselho Administrativo de Defesa Econômica (CADE, Brazilian competition authority) covering four proceedings concerning alleged collusion in public tenders for infrastructure projects (metro, airports operated by Infraero, the rail company CPTM and the transport authority DNIT). The company admitted its participation, allegedly pays 6,134,676.92 BRL in instalments to the Fund for Diffuse Rights (FDD) and waives court and administrative disputes on these matters. Together with the company’s earlier settlements with CADE, its contributions exceed 90 million BRL.

What organisations can take from it

A settlement covering all pending cartel cases creates legal certainty but requires an admission, payment and full cooperation.

Relevance to training and awareness

Bid rigging in public construction contracts

Authority / court
Conselho Administrativo de Defesa Econômica (CADE)
Area of law
Competition law · Cartels and collusion
Legal basis
Lei nº 12.529/2011 (Lei de Defesa da Concorrência), Termo de Compromisso de Cessação
Action
Other
Status of proceedings
final
Sector
Construction and real estate
Published
22 Sep 2026

Original amount 6,134,676.92 BRL, converted at the ECB reference rate of 22 Sep 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

16 Sep 2026 Hillbeck Homes (Sowerby Bridge) LtdDeveloper pays £300,000 after agency worker falls through unprotected stairwell opening United KingdomWorkplace safety and accidents €349,895

A 24-year-old labourer working as a temporary worker for a scaffolding company fell, in his second week of work on the developer's housing site, through a stairwell opening that was neither securely covered nor guarded, dropping one storey onto concrete and suffering serious spinal injuries. The court found the company guilty on three counts because it had neither adequately planned nor supervised work at height and had not taken suitable measures to prevent falls. Fine of £300,000 plus costs. The company is a micro-enterprise with fewer than 10 employees.

What organisations can take from it

Floor openings on construction sites must be covered with load-bearing covers or guarded at all times – new and temporary workers in particular do not know where the hazards are.

Relevance to training and awareness

Fall protection at openings; induction of new workers

Authority / court
Leeds Magistrates' Court (Anklage: Health and Safety Executive)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Work at Height Regulations 2005
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Employees
Under 50
Published
21 Sep 2026

Original amount 300,000 GBP, converted at the ECB reference rate of 16 Sep 2026.

Checked against the official source on 28 Sep 2026 · Version 3 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

4 Sep 2026 In Construction LimitedHong Kong: HKD 640,000 fine for In Construction after fatal crane accident Hong KongWorkplace safety and accidents €70,237

In Construction was fined HKD 640,000 for breaches of the Factories and Industrial Undertakings Ordinance and the regulations on lifting appliances and safety management. On a foundation construction site in Tai Po on 30 September 2025, a female worker had been trapped between the rear end of a slewing crawler crane and the railing of a steel platform and later died.

What organisations can take from it

A crane's slewing zone must be cordoned off, especially on confined platforms where railings create a crushing point.

Relevance to training and awareness

Securing the danger zone of slewing cranes

Authority / court
Shatin Magistrates' Courts, Hongkong (Anklage: Labour Department)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Factories and Industrial Undertakings Ordinance; Factories and Industrial Undertakings (Lifting Appliances and Lifting Gear) Regulations; Factories and Industrial Undertakings (Safety Management) Regulation
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Published
4 Sep 2026

Original amount 640,000 HKD, converted at the ECB reference rate of 4 Sep 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

3 Sep 2026 BDW Trading (Barratt Redrow)Barratt Redrow subsidiary BDW pays 201,500 GBP to environmental projects after silt entered brooks United KingdomEmissions and permits €234,153

At the Ladden Garden Village construction site in Yate, a subcontractor washed silt from the site drainage into two brooks over six days in July 2022. The Environment Agency accepted an Enforcement Undertaking: BDW is paying 201,500 GBP to three environmental and charitable projects, bears the investigation costs and had already invested over 180,000 GBP in remediation, training and improved surface water management. According to the annual accounts filed with the UK companies register for financial year 2025, the company had around 5,217 employees.

What organisations can take from it

Developers are liable for environmental damage caused by their subcontractors; clear procedures and training on handling surface water prevent costly proceedings.

Relevance to training and awareness

Protecting watercourses on construction sites and managing subcontractors

Missing or inadequate training played a role in the decision.

Authority / court
Environment Agency
Area of law
Environment and sustainability · Emissions and permits
Legal basis
Environmental Civil Sanctions (England) Order 2010 (Enforcement Undertaking)
Action
Other
Status of proceedings
final
Sector
Construction and real estate
Employees
1,000 to 9,999
Mitigating circumstances
Acceptance of responsibility, remediation, training of employees and application for a discharge permit.
Published
3 Sep 2026

Original amount 201,500 GBP, converted at the ECB reference rate of 3 Sep 2026.

Checked against the official source on 28 Sep 2026 · Version 3 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

20 Aug 2026 Grace Motors Limited (Grace Construction)Grace Construction: 38,500 NZD for working at height despite a prohibition notice New ZealandWorkplace safety and accidents €19,586

At a site for two-storey residential units in Kelston (Auckland), workers were working on the upper floor without adequate fall protection, and the site also had temporary platforms, partially removed scaffolding and unsecured ladders; WorkSafe (New Zealand's workplace health and safety regulator) therefore prohibited work at height on the second floor by a prohibition notice on 30 August 2024. Because work continued there on 2 and 4 September 2024 nonetheless, the Waitakere District Court imposed a fine of 38,500 NZD on 20 August 2026, plus costs of 1,099.10 NZD.

What organisations can take from it

A prohibition notice means an immediate stop to the work – site management must actively enforce it until the risk has demonstrably been remedied.

Relevance to training and awareness

Fall protection and compliance with regulatory stop-work orders

Authority / court
Waitakere District Court (Anklage: WorkSafe New Zealand)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Health and Safety at Work Act 2015, s 107(1), (2)(b)
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Liability of senior managers
The prohibition notice had been issued to one of the directors.
Published
4 Sep 2026

Original amount 38,500 NZD, converted at the ECB reference rate of 20 Aug 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

19 Aug 2026 Sioux Erosion Control Inc.DOJ: jury convicts erosion control firm of price fixing in Oklahoma road construction USACartels and collusion –

A jury found Sioux Erosion Control guilty of having fixed prices for erosion control services, allocated contracts regionally and rigged bids on publicly funded road construction projects in Oklahoma (more than 100 million USD) from 2017 to 2023. Sentencing was still pending; the decision is not final.

What organisations can take from it

Subcontractors in public road construction are also targeted by prosecutors.

Relevance to training and awareness

Price-fixing and territorial agreements for subcontracted services in road construction

Authority / court
U.S. Department of Justice, Antitrust Division
Area of law
Competition law · Cartels and collusion
Legal basis
Section 1 Sherman Act
Status of proceedings
unknown
Sector
Construction and real estate
Liability of senior managers
Measures against individuals are not reported here.
Published
20 Aug 2026

Checked against the official source on 28 Sep 2026 · Version 4 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

13 Aug 2026 „О-Рент“ ЕООД (sowie „Инжконсулт“ ЕООД und „Земекоп“ ЕООД)Construction machinery cartel: fine for O-Rent, compliance programme for all participants BulgariaCartels and collusion €2,403

The Комисия за защита на конкуренцията (Bulgarian Commission for the Protection of Competition, KZK) found a cartel in public tenders for mining and construction machinery (price fixing and market sharing, Art. 15 ZZK – Bulgarian Protection of Competition Act, Art. 101 TFEU). Inzhkonsult and Zemekop, as a single undertaking, were exempted from the fine; O-Rent received a sanction of 2,403.07 EUR. All three companies must introduce a competition law compliance programme within 60 days and report on it.

What organisations can take from it

The authority now expressly requires compliance programmes – anyone bidding in tenders should have one before it is ordered.

Relevance to training and awareness

Competition law in tenders; compliance programme

Authority / court
Комисия за защита на конкуренцията (КЗК, Bulgarische Wettbewerbskommission)
Area of law
Competition law · Cartels and collusion
Legal basis
Art. 15 Abs. 1 Nr. 1 und 2 ZZK; Art. 101 Abs. 1 lit. a und c AEUV
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Mitigating circumstances
Immunity from fines for two participants (leniency programme)
Published
20 Aug 2026

Checked against the official source on 25 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

6 Aug 2026 AS Asphaltstraßensanierung GmbH, BITUNOVA GmbH, Kutter Spezialstraßenbau GmbH & Co. KG, Possehl Construction GmbH (inkl. VSI), Liesen…alles für den Bau GmbH, OAT GmbH/Otto Alte-Teigeler GmbHBundeskartellamt: 60.3 million EUR against DSK road repair cartel GermanyCartels and collusion €60.3m

From around 2010 to September 2019, six suppliers of thin cold-laid asphalt surface layers (Dünne Asphaltdeckschichten in Kaltbauweise, DSK) allocated customers – primarily public contracting authorities – and contracts among themselves nationwide and coordinated prices. Germany's Federal Cartel Office (Bundeskartellamt) imposed fines of around 60.3 million EUR; all proceedings ended in settlements.

What organisations can take from it

Anyone who "shares out" public contracts regionally risks fines running into millions – calculations and bids must always be prepared independently.

Relevance to training and awareness

Customer allocation and bid rigging in public contracts

Authority / court
Bundeskartellamt
Area of law
Competition law · Cartels and collusion
Legal basis
§ 1 GWB, Art. 101 AEUV
Action
Fine
Status of proceedings
final
Sector
Construction and real estate
Mitigating circumstances
Leniency bonus for Possehl/VSI, Bitunova, Kutter and AS; settlement
Published
6 Aug 2026

Checked against the official source on 25 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

31 Jul 2026 Whitemountain Quarries Limited€1.2m fine for Whitemountain Quarries after fatal roadworks incident IrelandWorkplace safety and accidents €1.2m

At roadworks on the R238 in Donegal in August 2020, one wheel of a car dropped onto the unfinished hard shoulder; when the driver steered back, the car slid on the freshly laid surface and went into Lough Foyle; three occupants drowned and one was injured, and appropriate temporary traffic management was lacking. The company pleaded guilty to breaching its duties towards non-employees under s. 12 of the Safety, Health and Welfare at Work Act 2005 and was fined €1,200,000.

What organisations can take from it

Employers at roadworks in public spaces are also liable for the safety of third parties; signage and guidance measures must remain adequate until the works are finished.

Authority / court
Letterkenny Circuit Criminal Court (Anklage: Health and Safety Authority)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
s. 12 i. V. m. s. 77(9)(a) Safety, Health and Welfare at Work Act 2005
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Published
31 Jul 2026

Checked against the official source on 2 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

23 Jul 2026 Orchids Builders LLCFlorida roofer: OSHA proposes $349,754 over allegedly repeated lack of fall protection USAWorkplace safety and accidents €307,017

According to the U.S. Occupational Safety and Health Administration (OSHA), inspectors found on 21 January and 10 March 2026 at two residential construction sites in Rockledge that employees of the roofing contractor were working on roofs without fall protection; training records, eye protection when using nail guns and ladders extending sufficiently above the roof edge were also missing. The company had been inspected seven times since 2023, each time with citations for fall protection. OSHA proposed penalties of $349,754 (2 violations classified as wilful, 4 as repeat); the violations are alleged and may be contested.

What organisations can take from it

Companies that allow the same fall hazards to recur after earlier inspections risk classification as a repeat or wilful violation with substantially higher penalties.

Relevance to training and awareness

Fall protection during roofing work

Missing or inadequate training played a role in the decision.

Authority / court
U.S. Department of Labor – Occupational Safety and Health Administration (OSHA)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
29 CFR 1926 Subpart M (Fall Protection), Subpart X (Ladders)
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Culpability
intentional
Repeat case
yes
Published
23 Jul 2026

Original amount 349,754 USD, converted at the ECB reference rate of 23 Jul 2026.

Checked against the official source on 28 Sep 2026 · Version 2 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

21 Jul 2026 Dragon Alfa Cement LimitedCement plant with 12 employees: 1 million GBP after fatal accident at unguarded machinery United KingdomWorkplace safety and accidents €1.17m

In 2021 a 35-year-old employee was crushed by a 1.6-tonne concrete weight at the cement bagging plant in Sharpness. A large section of the perimeter fencing had routinely been removed over a prolonged period, leaving dangerous moving parts freely accessible. The company – with 12 employees according to its 2024 annual accounts – was fined 1 million GBP plus 9,621 GBP in costs.

What organisations can take from it

Treat removed guard fencing as a management failure and stop it – tolerating permanently open danger zones can lead to fines in the millions, even for a small business.

Authority / court
Bristol Magistrates' Court (Anklage: Health and Safety Executive)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Section 2(1) Health and Safety at Work etc. Act 1974
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Employees
Under 50
Published
21 Jul 2026

Original amount 1,000,000 GBP, converted at the ECB reference rate of 21 Jul 2026.

Checked against the official source on 28 Sep 2026 · Version 2 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

16 Jun 2026 SCS Railways (Joint Venture von Skanska Construction UK Limited, Costain Limited und Strabag AG)HS2 joint venture SCS Railways: £400,000 fine after tipper truck fall United KingdomWorkplace safety and accidents €462,583

SCS Railways, a joint venture of Skanska, Costain and Strabag on the HS2 rail project, was fined £400,000 and ordered to pay £8,974 in costs. On 27 July 2021 at the Copthall North site near Uxbridge, a 20-tonne tipper truck belonging to a contracted haulage company fell from an excavation ramp and the driver was injured. The Health and Safety Executive found neither signage nor edge protection on the vehicle routes; a traffic route changed on the morning of the incident had left an unprotected edge and had been neither properly planned nor communicated in time.

What organisations can take from it

Every short-notice change to site vehicle routes needs a risk check and immediate briefing of all drivers.

Relevance to training and awareness

Traffic routes and change management on major construction sites

Authority / court
Uxbridge Magistrates' Court (Anklage: Health and Safety Executive)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Section 3(1) Health and Safety at Work etc. Act 1974
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Mitigating circumstances
Guilty plea.
Published
26 Jun 2026

Original amount 400,000 GBP, converted at the ECB reference rate of 16 Jun 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

9 Jun 2026 Leader Properties Investment Pty LtdNSW: property manager Leader Properties penalised for unlawfully locking out a tenant AustraliaConsumer protection and online retail €13,422

NSW Fair Trading (the consumer protection regulator of New South Wales) reprimanded Leader Properties Investment Pty Ltd on 9 June 2026 and imposed a monetary penalty of 22,000 AUD because it had locked out a tenant and unlawfully taken possession of the rented home in breach of the Residential Tenancies Act 2010. All licensed agents of the company who provide property management must complete tenancy training. Measures against individuals are not set out here.

What organisations can take from it

Property managers must never lock out tenants on their own authority; evictions only go through the statutory process, and staff must know this.

Relevance to training and awareness

Tenancy law in property management: no self-help evictions or lockouts

Missing or inadequate training played a role in the decision.

Authority / court
NSW Fair Trading
Area of law
Consumer protection and online retail
Legal basis
Property and Stock Agents Act 2002 (NSW), s 192(1)(a), (c) und (d); Verstoß gegen den Residential Tenancies Act 2010 (NSW)
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Liability of senior managers
Measures against individuals are not set out here.
Published
25 Jun 2026

Original amount 22,000 AUD, converted at the ECB reference rate of 9 Jun 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

9 Jun 2026 Deutsche Wohnen SELG Berlin I confirms GDPR infringement by Deutsche Wohnen through tenant archive without deletion function GermanyData breaches and data security Fine

In 2019, the Berlin Commissioner for Data Protection and Freedom of Information (BlnBDI) had imposed 14.5 million EUR on the housing group because tenant data such as salary statements, bank statements and social security data were held in an archive system with no means of deletion. Following the 2023 CJEU judgment on direct corporate liability, the Berlin Regional Court (Landgericht Berlin I) confirmed on 9 June 2026 infringements of data minimisation and storage limitation; the press release does not state the amount of the fine set by the court.

What organisations can take from it

Ensure that archive and filing systems can technically implement deletion periods from the outset – ‘privacy by design’ is subject to fines.

Authority / court
Landgericht Berlin I (Bußgeldbehörde: Berliner Beauftragte für Datenschutz und Informationsfreiheit)
Area of law
Data protection · Data breaches and data security
Legal basis
Art. 5, Art. 25 Abs. 1 DSGVO
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Liability of senior managers
According to the CJEU (C-807/21), a breach of duty by a person in a management position need not be proven for the corporate fine.
Published
10 Jun 2026

Checked against the official source on 25 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

28 May 2026 Thermotech Wall and Loft Surveys LtdICO: £240,000 fine for Thermotech over marketing calls to TPS numbers United KingdomMarketing and consent €276,928

The ICO fined Thermotech Wall and Loft Surveys Ltd £240,000 and issued an enforcement notice. After executing a search warrant in April 2025, the regulator found that between October 2024 and March 2025 the company had instigated 575,062 unsolicited marketing calls to numbers that had been on the TPS register for more than 28 days. There were 132 complaints. The legal basis is regulations 21 and 24 of PECR.

Authority / court
Information Commissioner's Office (ICO)
Area of law
Data protection · Marketing and consent
Legal basis
Regulations 21 und 24 PECR; section 55A DPA 1998
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate

Original amount 240,000 GBP, converted at the ECB reference rate of 28 May 2026.

Checked against the official source on 28 Sep 2026 · Version 2 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

28 May 2026 Timmerhuis Weg & Waterbouw B.V., Bouwhuis Aannemingsmaatschappij „Bouwmij“ B.V., Aannemingsmaatschappij Van Gelder B.V.ACM: cartel fines on construction firms for bid rigging in an Ommen tender NetherlandsCartels and collusion €45,500

In September 2024 three construction companies coordinated their bid prices and decided the winner in a civil engineering tender of the municipality of Ommen, which was awarded for 153,250 EUR. Because of earlier cartel infringements by the companies or their legal predecessors established in 2005, the ACM (Autoriteit Consument & Markt, Dutch competition and consumer authority) increased the fines by 20%. In the simplified procedure it imposed allegedly 30,000 EUR on Timmerhuis and allegedly 15,500 EUR on Bouwhuis (45,500 EUR in total); Van Gelder, as first leniency applicant, was not fined.

What organisations can take from it

Bids in procurement procedures must be prepared independently; even agreeing the winner of a small municipal contract is sanctioned.

Relevance to training and awareness

Bid rigging in public tenders

Authority / court
Autoriteit Consument & Markt (ACM)
Area of law
Competition law · Cartels and collusion
Legal basis
Art. 6 Abs. 1 Mededingingswet
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Repeat case
yes
Mitigating circumstances
For cooperating in the simplified procedure, the ACM reduced the fines of Bouwhuis and Timmerhuis by 15%, and that of Timmerhuis by a further 5% for evidence provided voluntarily; Van Gelder, as first applicant, received full leniency immunity.
Published
2 Jun 2026

Checked against the official source on 4 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

22 May 2026 China Harbour Engineering Company LimitedChina Harbour Engineering: 78,000 HKD for discharge into water control zone Hong KongEmissions and permits €8,584

In April 2026 China Harbour Engineering Company Limited was fined 78,000 HKD at the Eastern Magistrates' Courts (a Hong Kong magistrates' court) under the Water Pollution Control Ordinance (Hong Kong's water pollution law) because the company had discharged waste or polluting matter into a water control zone on 14 July 2025; the prosecution was brought by the Environmental Protection Department (Hong Kong's environmental authority). It was the highest fine among the 40 environmental convictions the department published for April 2026.

What organisations can take from it

Discharges into waters must be authorised in advance and monitored continuously – a single incident is enough for a criminal conviction in Hong Kong.

Relevance to training and awareness

Water protection and authorised discharges

Authority / court
Eastern Magistrates' Courts, Hongkong (Anklage: Environmental Protection Department)
Area of law
Environment and sustainability · Emissions and permits
Legal basis
Water Pollution Control Ordinance (Einleitung von Abfall oder verunreinigenden Stoffen in eine water control zone)
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Published
22 May 2026

Original amount 78,000 HKD, converted at the ECB reference rate of 22 May 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

4 May 2026 Decora S.A., Bel-Pol sp. z o.o.Decora and Bel-Pol: PLN 33.6m for price and territory agreements on flooring accessories PolandCartels and collusion €7.9m

The manufacturer Decora and the wholesaler Bel-Pol had coordinated prices for vinyl panels, underlays, skirting boards and floor profiles from Decora's range and divided the wholesale market for these products. UOKiK imposed fines of PLN 28,344,000 on Decora and PLN 5,290,000 on Bel-Pol, PLN 33,634,000 in total. The decision is not final.

What organisations can take from it

Vertical agreements on prices and territories in wholesale are hardcore restrictions.

Relevance to training and awareness

Price and territory agreements between manufacturer and wholesaler

Authority / court
Prezes Urzędu Ochrony Konkurencji i Konsumentów (UOKiK)
Area of law
Competition law · Cartels and collusion
Legal basis
Art. 6 Abs. 1 Nr. 1 und 3 ustawa o ochronie konkurencji i konsumentów; Art. 101 Abs. 1 lit. a und c AEUV; Art. 106 Abs. 1 Nr. 1 und 2, Art. 113c und Art. 89a ustawa o ochronie konkurencji i konsumentów
Action
Fine
Status of proceedings
under appeal
Sector
Construction and real estate
Mitigating circumstances
As a leniency applicant, Bel-Pol received a 50% reduction of its fine and a further 10% for voluntarily accepting the fine (settlement).
Liability of senior managers
Measures against individuals are not reported here.

Original amount 33,634,000 PLN, converted at the ECB reference rate of 4 May 2026.

Checked against the official source on 28 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

24 Apr 2026 White Ray Oakleigh Pty Ltd (Ray White Oakleigh)Federal Court: 600,000 AUD against former operator of Ray White Oakleigh for underquoting AustraliaMisleading advertising and pricing €366,010

Following action by Consumer Affairs Victoria (the consumer protection regulator of the state of Victoria), the Federal Court of Australia ordered White Ray Oakleigh Pty Ltd, former operator of the Ray White Oakleigh agency, to pay 600,000 AUD because between February 2022 and November 2023 it advertised nine properties well below market value and at prices it did not itself expect to achieve (underquoting). According to the regulator, the agency agreements often provided for considerably higher commission on proceeds above the reserve price, and vendors were persuaded to lower their reserves after signing; text messages between the agents showed that they expected considerably higher prices. The court found misleading or deceptive conduct and false or misleading representations.

What organisations can take from it

Prices in property advertising must reflect the agent's genuine estimate; commission models that reward bait pricing are a compliance risk in their own right.

Relevance to training and awareness

Truthful price information in property advertising (underquoting)

Authority / court
Consumer Affairs Victoria / Federal Court of Australia
Area of law
Consumer protection and online retail · Misleading advertising and pricing
Legal basis
Irreführendes Verhalten sowie falsche oder irreführende Angaben (Vorschriften in der Mitteilung nicht genannt)
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Culpability
intentional
Mitigating circumstances
The company admitted the conduct and cooperated with the regulator in the court proceedings; it has not operated the agency since 2025.
Published
24 Apr 2026

Original amount 600,000 AUD, converted at the ECB reference rate of 24 Apr 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

21 Apr 2026 Gwalimba Construction (Pty) LtdAlleged collusion on a government job: Gwalimba Construction allegedly pays ZAR 50,000 South AfricaCartels and collusion €2,596

On 21 April 2026 the Competition Tribunal (South Africa's competition adjudicator) confirmed a settlement with Gwalimba Construction (Pty) Ltd. Following a complaint by the Department of Home Affairs (home affairs ministry), the Competition Commission (competition authority) had found that Gwalimba and Superway Construction (Pty) Ltd agreed not to compete against each other on certain tenders – including a request for quotes for fire-compliance repair work at a government office in Pretoria. Without admitting liability, Gwalimba allegedly pays an administrative penalty of 50,000 ZAR, will cooperate in the case against Superway and will introduce a competition law compliance programme.

What organisations can take from it

Even small construction firms must avoid any coordination with competitors when quoting to public bodies – authorities pursue such arrangements against small firms too.

Relevance to training and awareness

Bid rigging in public procurement

Authority / court
Competition Tribunal of South Africa (auf Antrag der Competition Commission)
Area of law
Competition law · Cartels and collusion
Legal basis
Section 4(1)(b)(i), (ii) und (iii) Competition Act 89 of 1998
Action
Fine
Status of proceedings
final
Sector
Construction and real estate
Repeat case
no
Mitigating circumstances
According to the parties: cooperation with the authority, a small firm with no previous contraventions, and it did not win the contract.
Published
23 Apr 2026

Original amount 50,000 ZAR, converted at the ECB reference rate of 21 Apr 2026.

Checked against the official source on 4 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

14 Apr 2026 Sun Shine Decoration Limited, Wai Tat Aluminium & Glass Engineering Company LimitedHong Kong: HKD 730,000 in fines for two contractors after fatal fall Hong KongWorkplace safety and accidents €79,028

The court fined Sun Shine Decoration HKD 500,000 and Wai Tat Aluminium & Glass Engineering HKD 230,000, HKD 730,000 in total, for breaches of the Factories and Industrial Undertakings Ordinance and the Construction Sites (Safety) Regulations. The case arose from a fatal accident on 16 May 2025 at a house in Kwu Tung, in which a worker fell into the swimming pool of the neighbouring house while fixing insulation boards on a metal canopy.

What organisations can take from it

Work on roofs and canopies requires fall protection planned in advance, even at residential houses, and every company involved can be held liable for breaches.

Relevance to training and awareness

Fall protection when working on roofs and canopies

Authority / court
Fanling Magistrates' Courts, Hongkong (Anklage: Labour Department)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Factories and Industrial Undertakings Ordinance; Construction Sites (Safety) Regulations
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Published
14 Apr 2026

Original amount 730,000 HKD, converted at the ECB reference rate of 14 Apr 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

8 Apr 2026 Alquiler Seguro, S.A.U.Consumer ministry: €3.6m fine on Alquiler Seguro over charges imposed on tenants SpainConsumer protection and online retail €3.6m

The Ministerio de Derechos Sociales, Consumo y Agenda 2030 (Spanish Ministry of Social Rights, Consumer Affairs and 2030 Agenda) imposed fines totalling 3,600,902 EUR (1,000,000, 990,900, three times 500,000, 100,001 and 10,001 EUR) on the rental agency Alquiler Seguro for six very serious and one serious breach of tenants' consumer rights. Among other things, the company had required tenants to pay for a tenant service as management and contract costs, to take out home insurance for the landlord's benefit and to bear debt collection and court costs, used a clause allowing reporting to debtor registers and excluded the right of withdrawal. The clauses must be removed and the sanction published.

What organisations can take from it

Agents must not pass management and signing costs on to tenants through mandatory services or add-on contracts; standard clauses in tenancy agreements should be reviewed regularly.

Relevance to training and awareness

Unfair terms and charges in tenancy agreements

Authority / court
Ministerio de Derechos Sociales, Consumo y Agenda 2030
Area of law
Consumer protection and online retail
Legal basis
Verbraucherschutzrecht (in der Pressemitteilung nicht einzeln zitiert); Ley 12/2023, de 24 de mayo, por el derecho a la vivienda (Verbot, Verwaltungs- und Vertragskosten auf Mieter abzuwälzen)
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Published
8 Apr 2026

Checked against the official source on 28 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

7 Apr 2026 Wspólnota Mieszkaniowa K. (Wohnungseigentümergemeinschaft, im Bescheid pseudonymisiert)Homeowners’ association: 4,852 PLN – misdirected statement not notified PolandIncident reporting obligations €1,135

Acting as processor, the property management company sent an owner’s statement of service charges to an unauthorised person. The association considered notification unnecessary because only ‘ordinary’ data of one member were affected, and maintained this position in the proceedings; the UODO (Poland’s data protection authority) imposed 4,852 PLN.

What organisations can take from it

Small controllers must also assess and notify data breaches by their service providers – ‘only one data subject’ is no ground for exemption.

Relevance to training and awareness

Recognising misdirected mail as a data breach – including at service providers

Authority / court
Prezes Urzędu Ochrony Danych Osobowych (UODO)
Area of law
Information security and cyber · Incident reporting obligations
Legal basis
Art. 33 Abs. 1 DSGVO
Action
Fine
Status of proceedings
final
Sector
Construction and real estate

Original amount 4,852 PLN, converted at the ECB reference rate of 7 Apr 2026.

Checked against the official source on 25 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

1 Apr 2026 The Management Corporation – Strata Title Plan No. 4869 (Riverfront Residences)MCST 4869: directions over lack of data protection instructions to managing agent SingaporeData processors Order

The management corporation of the Riverfront Residences condominium had not designated a data protection officer until March 2025, had no data protection policies of its own and had given its managing agent, which acted for it as a data intermediary, no instructions on handling personal data; in April 2025 an employee of the managing agent mistakenly sent the names, addresses and maintenance fee details of two owners to another owner. The Personal Data Protection Commission (PDPC, Singapore's data protection authority) found breaches of the Accountability Obligation and the Protection Obligation; by contrast, it found no breach in the circulation of a requisition for an extraordinary general meeting bearing the names and signatures of 303 owners, because strata management law prevailed. It directed the corporation to introduce, within 90 days, policies and procedures for the processing of data by the managing agent and to communicate them to it; the managing agent itself had given a voluntary undertaking.

What organisations can take from it

Anyone who outsources management to a service provider remains responsible and needs their own data protection officer, their own policies and specific instructions to the provider.

Relevance to training and awareness

Check recipients before sending, protect sensitive attachments and give service providers clear instructions

Authority / court
Personal Data Protection Commission (PDPC)
Area of law
Data protection · Data processors
Legal basis
Sections 11(3) und 12(a) PDPA 2012 (Accountability Obligation); Section 24 i. V. m. Section 4(3) PDPA (Protection Obligation bei Einsatz eines Data Intermediary)
Action
Order
Status of proceedings
unknown
Sector
Construction and real estate
Published
7 May 2026

Checked against the official source on 4 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

19 Mar 2026 Colas Rail Asia Sdn Bhd (Colas-Gruppe)Colas Rail Asia: CJIP of 29.7 million EUR over bribery in metro contracts in Malaysia FranceBribery of public officials €29.7m

The Malaysian subsidiary of Colas Rail paid large, undocumented sums via intermediaries in connection with public contracts for urban rail lines in Kuala Lumpur (Kelana Jaya extension, MRT2). Following an internal investigation, Colas Rail self-reported the matter in 2017; the CJIP (Convention judiciaire d'intérêt public, a French deferred prosecution agreement) provides for a public interest fine of 29,745,974 EUR and a three-year compliance programme monitored by the French Anti-Corruption Agency (AFA) (costs of up to 1.9 million EUR).

What organisations can take from it

Undocumented payments to intermediaries on foreign projects must be stopped early by the finance and compliance functions – self-reporting after an internal investigation is rewarded.

Relevance to training and awareness

Intermediaries and consultants in public tenders

Authority / court
Parquet national financier (PNF); Validierung durch den Präsidenten des Tribunal judiciaire de Paris
Area of law
Bribery and corruption · Bribery of public officials
Legal basis
Art. 41-1-2 Code de procédure pénale (CJIP); Bestechung ausländischer Amtsträger
Action
Fine
Status of proceedings
final
Sector
Construction and real estate
Employees
10,000 or more
Culpability
intentional
Mitigating circumstances
Self-report (criminal complaint filed by Colas Rail on 31 May 2017) following an internal forensic investigation.
Liability of senior managers
The CJIP does not address the criminal liability of natural persons.
Published
19 Mar 2026

Checked against the official source on 25 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

23 Feb 2026 Chevalier (Construction) Company LimitedHong Kong: HKD 80,000 fine for Chevalier (Construction) for breaching a noise permit Hong KongEmissions and permits €8,683

Chevalier (Construction) was fined HKD 80,000 in January 2026 because on 23 February 2025 the company carried out prescribed construction work in breach of the conditions of its construction noise permit. It was the heaviest single fine among the 34 convictions reported by the Environmental Protection Department for January 2026.

What organisations can take from it

A noise permit only protects a site as long as its conditions on hours and equipment are actually observed.

Relevance to training and awareness

Complying with noise permit conditions on construction sites

Authority / court
Kwun Tong Magistrates' Courts, Hongkong (Anklage: Environmental Protection Department)
Area of law
Environment and sustainability · Emissions and permits
Legal basis
Noise Control Ordinance (Bauarbeiten entgegen den Bedingungen einer Construction Noise Permit)
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Published
23 Feb 2026

Original amount 80,000 HKD, converted at the ECB reference rate of 23 Feb 2026.

Sources

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

19 Feb 2026 AZOP: 100,000 EUR against estate agent over ID copies and old files CroatiaData subject rights and transparency €100,000

An estate agency (name not published) kept 11,887 brokerage contracts from 2010 to 2019, together with 914 copies of identity cards, passports and bank cards, without a legal basis, although the managing director stated that no card copies were collected. The Croatian data protection authority (Agencija za zaštitu osobnih podataka, AZOP) also criticised irregular and inadequate data protection training for employees and imposed 100,000 EUR (date of publication; exact date of the decision not stated).

What organisations can take from it

Make copies of identity documents and cards only with a legal basis, destroy old files on time and train employees regularly.

Relevance to training and awareness

Data minimisation for ID copies, retention periods

Missing or inadequate training played a role in the decision.

Authority / court
Agencija za zaštitu osobnih podataka (AZOP)
Area of law
Data protection · Data subject rights and transparency
Legal basis
Art. 5 Abs. 1 lit. c und e, Art. 6 Abs. 1, Art. 32 Abs. 4 DSGVO
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Culpability
negligent
Mitigating circumstances
No damage to data subjects was found.
Published
19 Feb 2026

Checked against the official source on 25 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

16 Feb 2026 Carillion plc (in liquidation)FCA: Public censure for Carillion plc over misleading market information United KingdomMarket abuse and insider dealing Reprimand or warning

The FCA publicly censured the former construction and services group Carillion plc. The regulator found that between July 2016 and July 2017 the company published misleading information, breaching the prohibition of market manipulation and listing requirements; in July 2017 Carillion had to announce a provision of £845 million. Because the company has been in liquidation since January 2018, no fine was imposed; the FCA stated it would otherwise have been £37.91 million.

Authority / court
Financial Conduct Authority (FCA)
Area of law
Capital markets and financial supervision · Market abuse and insider dealing
Legal basis
Art. 15 MAR; Listing Rule 1.3.3R; Listing Principle 1; Premium Listing Principle 2; sections 91 und 123 FSMA 2000
Action
Reprimand or warning
Status of proceedings
final
Sector
Construction and real estate

Checked against the official source on 28 Sep 2026 · Version 2 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

10 Feb 2026 Strukton Civiel Projecten B.V. und Strukton International B.V. (Strukton-Gruppe)Construction group Strukton pays 10 million EUR out-of-court settlement over bribery on the Riyadh Metro NetherlandsBribery of public officials €10m

To secure a share in the Riyadh Metro project, around 31 million USD was paid between 2013 and 2021 to an agent representing a high-ranking member of the Saudi royal family; the agent payments were understated to the export credit insurer Atradius. Strukton accepted a transaction (out-of-court settlement) of 10 million EUR.

What organisations can take from it

Commissions to agents with ties to ruling families carry the highest risk – and false statements to export credit insurers constitute a second offence.

Relevance to training and awareness

Agent commissions and false statements to export credit insurers

Authority / court
Openbaar Ministerie (OM)
Area of law
Bribery and corruption · Bribery of public officials
Legal basis
Buitenlandse ambtelijke omkoping und valsheid in geschrift (Wetboek van Strafrecht); Transactie nach Art. 74 Sr
Action
Fine
Status of proceedings
final
Sector
Construction and real estate
Culpability
intentional
Mitigating circumstances
Cooperation from mid-2023; compliance programme in place since 2017; the employees involved are no longer with the company.
Published
30 Mar 2026

Checked against the official source on 28 Sep 2026 · Version 2 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

4 Feb 2026 RE/MAX Twin City Realty Inc.FINTRAC: CAD 24,750 penalty on RE/MAX Twin City Realty Inc. for one violation of anti-money laundering obligations CanadaInternal controls €15,336

According to FINTRAC, RE/MAX Twin City Realty Inc. is a real estate brokerage based in Kitchener, Ontario. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 24,750 on the company on 4 February 2026. According to FINTRAC's findings, made during a compliance examination, the company committed one violation of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violation concerned assessing and documenting money laundering and terrorist financing risks. According to FINTRAC, the penalty has been paid in full and the case is closed. Source: FINTRAC (Financial Transactions and Reports Analysis Centre of Canada), "Administrative monetary penalty on RE/MAX Twin City Realty Inc.", published 5 May 2026, https://fintrac-canafe.canada.ca/pen/amps/pen-2026-05-05-1-eng; summarised in our own words; not an official version and not a reproduction of the original.

Authority / court
Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
Area of law
Money laundering and terrorist financing · Internal controls
Legal basis
PCMLTFA s. 9.6(1); PCMLTF Regulations 156(1)(c); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
Action
Fine
Status of proceedings
final
Sector
Construction and real estate
Published
5 May 2026

Original amount 24,750 CAD, converted at the ECB reference rate of 4 Feb 2026.

Checked against the official source on 28 Sep 2026 · Version 3 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

30 Jan 2026 Jim's Realty Pty Ltd (früher Agape Property Group)WA: record 225,000 AUD fine for estate agency over trust account and bond breaches AustraliaConsumer protection and online retail €132,345

On 30 January 2026 the Perth Magistrates Court convicted Jim's Realty Pty Ltd on 35 charges – client money not credited to the trust account, unlawful withdrawals, improper records and tenancy bonds lodged late or not at all – and fined it 225,000 AUD plus 577.50 AUD in costs. A forensic audit commissioned by Consumer Protection WA (the consumer protection division of Western Australia) had identified 57 unexplained withdrawals totalling more than 334,915 AUD. According to the regulator it is the largest fine ever imposed on an estate agency in Western Australia; the company has been in liquidation since 2024.

What organisations can take from it

Trust money and tenancy bonds require complete records and timely lodgement; irregularities in the annual audit are a warning sign that must be resolved immediately.

Relevance to training and awareness

Handling client money in trust accounts and timely lodgement of tenancy bonds

Authority / court
Consumer Protection WA (Department of Local Government, Industry Regulation and Safety) / Perth Magistrates Court
Area of law
Consumer protection and online retail
Legal basis
Real Estate and Business Agents Act 1978 (WA); Residential Tenancies Act 1987 (WA)
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Culpability
intentional
Repeat case
yes
Mitigating circumstances
None; according to the release, the court found no mitigating factors despite the liquidation.
Published
11 Feb 2026

Original amount 225,000 AUD, converted at the ECB reference rate of 30 Jan 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

29 Jan 2026 Tarmac Building Products LimitedTarmac Building Products: 633,300 GBP after worker's legs crushed on production line United KingdomWorkplace safety and accidents €731,124

At the Linford plant in 2022 an employee's legs were trapped between metal frames weighing over a tonne because the interlocked access gate did not cut the power to the preceding sections of track. Previous near misses and a risk assessment from years earlier that called for additional control measures were not acted upon; fine of 633,300 GBP plus 5,583 GBP in costs. According to its 2025 annual accounts, the company had an average of 596 employees.

What organisations can take from it

Follow up near misses and outstanding actions from risk assessments – otherwise they prove in court that you knew of the risk.

Authority / court
Chelmsford Magistrates' Court (Anklage: Health and Safety Executive)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Section 2(1) Health and Safety at Work etc. Act 1974
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Employees
250 to 999
Published
30 Jan 2026

Original amount 633,300 GBP, converted at the ECB reference rate of 29 Jan 2026.

Checked against the official source on 28 Sep 2026 · Version 2 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

27 Jan 2026 Salford Grab Hire LimitedExcavator bucket used as a prop: mechanic seriously injured – 10,000 GBP for grab hire firm United KingdomWorkplace safety and accidents €11,517

During the repair of a tipper truck, a JCB bucket without a quick hitch or retaining pin was used to prop up the raised tipper body; the one-tonne bucket fell and seriously injured a mechanic. The business (11 employees according to its micro-entity accounts) had not used suitable props; fine of 10,000 GBP plus 3,475.90 GBP in costs.

What organisations can take from it

Secure raised loads only with props designed for the purpose – improvised supports using work equipment are a typical cause of serious crush injuries.

Authority / court
Warrington Magistrates' Court (Anklage: Health and Safety Executive)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Section 2(1) Health and Safety at Work etc. Act 1974
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Employees
Under 50
Published
4 Feb 2026

Original amount 10,000 GBP, converted at the ECB reference rate of 27 Jan 2026.

Checked against the official source on 28 Sep 2026 · Version 2 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

26 Jan 2026 DME Construction Associates Inc.DME Construction Associates: USD 600,000 OSHA settlement after fatal roof fall USAWorkplace safety and accidents €506,928

Long Island roofing contractor DME Construction Associates entered into a settlement with the US Department of Labor affirming all citations issued after an employee fell to his death through an unprotected skylight in August 2021, including nine wilful violations, eight of them cited per instance for each unprotected employee. The company will pay 600,000 USD and must introduce a written safety plan, ensure sufficient fall protection for all workers, notify OSHA of jobs in advance, allow inspections without a warrant and have supervisors complete a 30-hour course. The authority allegedly made the findings set out here; this account is not based on a final judgment.

What organisations can take from it

Missing fall protection can be penalised separately for each employee.

Relevance to training and awareness

Fall protection on roofs

Missing or inadequate training played a role in the decision.

Authority / court
U.S. Department of Labor – Occupational Safety and Health Administration (OSHA)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Occupational Safety and Health Act (Absturzsicherung im Bauwesen)
Action
Fine
Status of proceedings
final
Sector
Construction and real estate
Culpability
intentional
Liability of senior managers
Measures against individuals are not set out here.
Published
26 Jan 2026

Original amount 600,000 USD, converted at the ECB reference rate of 26 Jan 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

21 Jan 2026 Hip Seng Builders LimitedHong Kong: fines for Hip Seng Builders after fatal electrocution raised to HKD 521,000 Hong KongWorkplace safety and accidents €56,920

After a fatal accident on 19 August 2023 at a construction site in Chek Lap Kok, in which a worker received an electric shock while carrying out electrical work on a false ceiling, Hip Seng Builders had been fined HKD 261,000 on 23 January 2025. On the prosecution's application, the court reviewed the sentence and on 21 January 2026 increased the fines to HKD 521,000. The conviction was under the Factories and Industrial Undertakings Ordinance and two regulations on construction site and electrical safety.

What organisations can take from it

Electrical work on construction sites requires isolation and testing before work starts; Hong Kong prosecutors actively challenge sentences they consider too lenient.

Relevance to training and awareness

Electrical safety during installation work on construction sites

Authority / court
West Kowloon Magistrates' Courts, Hongkong (Anklage: Labour Department)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Factories and Industrial Undertakings Ordinance; Construction Sites (Safety) Regulations; Factories and Industrial Undertakings (Electricity) Regulations
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Published
21 Jan 2026

Original amount 521,000 HKD, converted at the ECB reference rate of 21 Jan 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

9 Jan 2026 Bulgarian construction subcontractor: 215,000 EUR for paying below the minimum wage GermanyMinimum wage and undeclared work €215,000

A Bulgarian construction company that worked as a subcontractor for a German firm on a major construction site in the district of Tuttlingen between January and May 2023 paid below the minimum wage, recorded only the duration of working time rather than its start and end, and did not register the posting. Around 215,000 EUR was imposed on the company, corresponding to the economic benefit obtained by paying below the minimum wage; the decision issued in September 2025 has been final since the end of 2025 (date = publication; exact date of the decision not specified).

What organisations can take from it

General contractors should actively check the minimum wage, working time records and posting notifications of their foreign subcontractors; the economic benefit is disgorged in full.

Authority / court
Hauptzollamt Singen (Finanzkontrolle Schwarzarbeit)
Area of law
Health and safety and employment law · Minimum wage and undeclared work
Legal basis
Mindestlohngesetz; Arbeitnehmer-Entsendegesetz (Aufzeichnungs- und Meldepflichten)
Action
Fine
Status of proceedings
final
Sector
Construction and real estate
Published
9 Jan 2026

Checked against the official source on 28 Sep 2026 · Version 2 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

7 Jan 2026 Exyte Management GmbHExyte: 1.5 million USD – Chinese subsidiary arranged US goods for listed chipmaker SMIC USAExport control and dual-use goods €1.28m

The Shanghai company of the Stuttgart-based Exyte group caused around 884 US items (flowmeters, pressure transmitters, controllers) worth around 2.85 million USD to be delivered by Chinese suppliers to SMIC Beijing, which is on the Entity List (the US export control list of restricted parties), on 13 occasions in 2021/22. According to the Bureau of Industry and Security (BIS, the export control agency of the US Department of Commerce), the compliance programme did not recognise that in-country transfers within China also require a licence; Exyte voluntarily disclosed the transactions and admitted them.

What organisations can take from it

Screen end customers against the Entity List in foreign subsidiaries too, even for local purchases – US export law also covers transfers of US goods within China.

Relevance to training and awareness

Entity List screening also for domestic deliveries abroad

Authority / court
U.S. Department of Commerce, Bureau of Industry and Security (BIS)
Area of law
Sanctions and export control · Export control and dual-use goods
Legal basis
Export Administration Regulations, 15 C.F.R. § 764.2(b), § 744.11
Action
Fine
Status of proceedings
final
Sector
Construction and real estate
Culpability
negligent
Mitigating circumstances
Voluntary self-disclosure, own investigation with external lawyers and investment in the compliance programme.
Published
7 Jan 2026

Original amount 1,500,000 USD, converted at the ECB reference rate of 7 Jan 2026.

Checked against the official source on 28 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

12 Dec 2025 EllisDon CorporationEllisDon: CAD 514,831.53 penalty after fatal crane incident at high-rise site Canada, British ColumbiaWorkplace safety and accidents €318,998

In February 2024 a flytable was being moved by tower crane at the Oakridge Park construction site; as it was pushed out it accelerated out of the building, fell and fatally struck a worker. WorkSafeBC found that EllisDon, as prime contractor, had not regularly reviewed the subcontractor's safe work procedures, had not confirmed that a risk assessment had been carried out, had not classed the lift as critical, had not ensured written lift plans, had not controlled the exclusion zone on the ground and had not coordinated the health and safety activities of the employers involved. It imposed an administrative penalty of CAD 514,831.53.

What organisations can take from it

Prime contractors must actively plan, review and coordinate their subcontractors' critical crane lifts rather than relying on their procedures.

Relevance to training and awareness

Coordinating health and safety and critical lifts on multi-employer construction sites

Authority / court
WorkSafeBC (Workers' Compensation Board of British Columbia)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Arbeitsschutzvorschriften von British Columbia, insbesondere Occupational Health and Safety Regulation (OHSR) – Pflichten des Hauptauftragnehmers (prime contractor) und Anforderungen an kritische Kranhübe; Verwaltungsstrafe (administrative penalty) von WorkSafeBC
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Published
12 Dec 2025

Original amount 514,831.53 CAD, converted at the ECB reference rate of 12 Dec 2025.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

12 Dec 2025 Newway Concrete FormingNewway Concrete Forming: CAD 112,624.66 penalty after fatal flytable incident Canada, British ColumbiaWorkplace safety and accidents €69,784

In February 2024 the formwork contractor was moving a flytable by tower crane at the Oakridge Park construction site when it fell out of the building and fatally struck a worker. WorkSafeBC found, among other things, missing written lift plans for critical lifts, inadequate procedures for corner flytables, a lack of risk assessments and inspections, loads being passed over people and insufficient instruction, training and supervision of workers, and imposed an administrative penalty of CAD 112,624.66.

What organisations can take from it

Formwork and lifting crews need written step-by-step procedures, trained ground control workers and controlled exclusion zones.

Relevance to training and awareness

Safe lifting and formwork operations, training of ground control workers

Missing or inadequate training played a role in the decision.

Authority / court
WorkSafeBC (Workers' Compensation Board of British Columbia)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Arbeitsschutzvorschriften von British Columbia, insbesondere Occupational Health and Safety Regulation (OHSR) – Hebepläne, Schalungsarbeiten, Unterweisung und Aufsicht; Verwaltungsstrafe (administrative penalty) von WorkSafeBC
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Published
12 Dec 2025

Original amount 112,624.66 CAD, converted at the ECB reference rate of 12 Dec 2025.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

10 Dec 2025 Century 21 Heritage Group Ltd.FINTRAC: CAD 148,912.50 penalty on Century 21 Heritage Group Ltd. for one violation of anti-money laundering obligations CanadaSuspicious activity reports €92,446

According to FINTRAC, Century 21 Heritage Group Ltd. is a real estate brokerage. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 148,912.50 on the company on 10 December 2025. According to FINTRAC's findings, made during a compliance examination, the company committed one violation of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violation concerned suspicious transaction reporting. According to FINTRAC, the company has appealed the decision to the Federal Court. Source: FINTRAC (Financial Transactions and Reports Analysis Centre of Canada), "Administrative monetary penalty on Century 21 Heritage Group Ltd.", published 10 February 2026, https://fintrac-canafe.canada.ca/pen/amps/pen-2026-02-10-eng; summarised in our own words; not an official version and not a reproduction of the original.

Authority / court
Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
Area of law
Money laundering and terrorist financing · Suspicious activity reports
Legal basis
PCMLTFA s. 7; Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
Action
Fine
Status of proceedings
under appeal
Sector
Construction and real estate
Published
10 Feb 2026

Original amount 148,912.5 CAD, converted at the ECB reference rate of 10 Dec 2025.

Checked against the official source on 28 Sep 2026 · Version 3 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

4 Dec 2025 Gracetown, Inc.OFAC: USD 7.14 million penalty on Gracetown over payments for a blocked company and failure to file a blocking report USABreaches of sanctions and embargoes €6.12m

OFAC has imposed a penalty of USD 7,139,305 on New York property management company Gracetown, Inc. by way of a Penalty Notice. According to OFAC's findings, between April 2018 and May 2020 Gracetown received 24 payments on behalf of an affiliated company owned by a sanctioned Russian oligarch, although OFAC had previously given it explicit notice of the prohibition. Gracetown also failed to report the blocked property to OFAC for more than 45 months. OFAC regarded the violations as wilful or at least reckless, egregious and not voluntarily self-disclosed; the base penalty equalled the statutory maximum of USD 8,906,358. OFAC's publication does not state whether Gracetown has paid the penalty or challenged it in court. Source: U.S. Department of the Treasury, Office of Foreign Assets Control (OFAC), enforcement release "OFAC Imposes $7,139,305 Penalty on Gracetown, Inc. for Violating Ukraine-/Russia-Related Sanctions and Reporting Obligations", 4 December 2025, https://ofac.treasury.gov/media/934796/download?inline; summarised in our own words.

Authority / court
U.S. Department of the Treasury, Office of Foreign Assets Control (OFAC)
Area of law
Sanctions and export control · Breaches of sanctions and embargoes
Legal basis
Ukraine-/Russia-Related Sanctions Regulations, 31 C.F.R. § 589.201; Reporting, Procedures and Penalties Regulations, 31 C.F.R. § 501.603 (Sperrmeldung); Penalty Notice nach den Economic Sanctions Enforcement Guidelines, 31 C.F.R. part 501, app. A
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Published
4 Dec 2025

Original amount 7,139,305 USD, converted at the ECB reference rate of 4 Dec 2025.

Checked against the official source on 28 Sep 2026 · Version 3 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

1 Dec 2025 VIP Realty Inc.FINTRAC: CAD 33,000 penalty on VIP Realty Inc. for one violation of anti-money laundering obligations CanadaInternal controls €20,296

According to FINTRAC, VIP Realty Inc. is a real estate brokerage based in Ottawa, Ontario. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 33,000 on the company on 1 December 2025. According to FINTRAC's findings, made during a compliance examination, the company committed one violation of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violation concerned the prescribed review of the compliance programme. According to FINTRAC, the penalty has been paid in full and the case is closed. Source: FINTRAC (Financial Transactions and Reports Analysis Centre of Canada), "Administrative monetary penalty on VIP Realty Inc.", published 9 July 2026, https://fintrac-canafe.canada.ca/pen/amps/pen-2026-07-09-2-eng; summarised in our own words; not an official version and not a reproduction of the original.

Authority / court
Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
Area of law
Money laundering and terrorist financing · Internal controls
Legal basis
PCMLTFA s. 9.6(1); PCMLTF Regulations 156(1)(f); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
Action
Fine
Status of proceedings
final
Sector
Construction and real estate
Published
9 Jul 2026

Original amount 33,000 CAD, converted at the ECB reference rate of 1 Dec 2025.

Checked against the official source on 28 Sep 2026 · Version 3 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

27 Nov 2025 Manor Windsor Realty Ltd.FINTRAC: estate agent Manor Windsor Realty without AML training programme – 107,250 CAD CanadaInternal controls €65,907

The estate agency in Windsor (Ontario) received a penalty of 107,250 CAD from the Financial Transactions and Reports Analysis Centre of Canada (FINTRAC) for four violations: no up-to-date, approved compliance policies, no assessment of the money laundering risk, no written ongoing training programme and no effectiveness review of the compliance programme. The company has appealed to the Federal Court.

What organisations can take from it

For estate agents, a missing written training programme is a separate violation subject to penalties.

Relevance to training and awareness

AML training programme for estate agents

Missing or inadequate training played a role in the decision.

Authority / court
Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
Area of law
Money laundering and terrorist financing · Internal controls
Legal basis
Proceeds of Crime (Money Laundering) and Terrorist Financing Act, Part 1, und zugehörige Verordnungen
Action
Fine
Status of proceedings
under appeal
Sector
Construction and real estate
Published
12 Feb 2026

Original amount 107,250 CAD, converted at the ECB reference rate of 27 Nov 2025.

Checked against the official source on 25 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

20 Nov 2025 1135233 B.C. Ltd.FINTRAC: CAD 149,886 penalty on 1135233 B.C. Ltd. for 6 violations of anti-money laundering obligations CanadaSuspicious activity reports €92,557

According to FINTRAC, 1135233 B.C. Ltd. (operating as LeHomes Realty Premier) is a real estate brokerage based in Vancouver, British Columbia. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 149,886 on the company. Published by FINTRAC on 20 November 2025; decision date not published. According to FINTRAC's findings, the company committed 6 violations of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violations concerned suspicious transaction reporting, appointing a compliance officer, written compliance policies and procedures, assessing and documenting money laundering and terrorist financing risks, the compliance training programme and client identification record keeping. According to FINTRAC, the company will pay the penalty in full and the case is closed. Source: FINTRAC (Financial Transactions and Reports Analysis Centre of Canada), "Administrative monetary penalty on 1135233 B.C. Ltd.", published 20 November 2025, https://fintrac-canafe.canada.ca/pen/amps/pen-2025-11-20-3-eng; summarised in our own words; not an official version and not a reproduction of the original.

Authority / court
Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
Area of law
Money laundering and terrorist financing · Suspicious activity reports
Legal basis
PCMLTFA s. 7; PCMLTF Regulations 39(1)(b), 71(1)(a), 71(1)(b), 71(1)(c), 71(1)(d); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
Action
Fine
Status of proceedings
final
Sector
Construction and real estate
Published
20 Nov 2025

Original amount 149,886 CAD, converted at the ECB reference rate of 20 Nov 2025.

Checked against the official source on 28 Sep 2026 · Version 3 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

20 Nov 2025 ein Dachdeckerbetrieb in EnglandRoofing contractor: 16,650 GBP after fall through skylight opening United KingdomWorkplace safety and accidents €18,888

While re-covering a flat roof on a residential property in England, an employee fell more than three metres through an open skylight opening and needed surgery. The business (a micro-enterprise with fewer than 10 employees) had not planned the work at height and had provided neither a crash deck nor netting; fine of 16,650 GBP plus 7,205 GBP in costs.

What organisations can take from it

Secure or provide protection beneath openings before work starts, even on small roofing jobs; planning is mandatory, not optional.

Authority / court
Birmingham Magistrates' Court (Anklage: Health and Safety Executive)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Section 3(1) Health and Safety at Work etc. Act 1974
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Employees
Under 50
Published
25 Nov 2025

Original amount 16,650 GBP, converted at the ECB reference rate of 20 Nov 2025.

Checked against the official source on 28 Sep 2026 · Version 2 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

30 Oct 2025 Barratt Redrow, Persimmon, Taylor Wimpey u. a. (7 Wohnungsbauunternehmen)CMA: seven housebuilders pay GBP 100m after suspected information exchange United KingdomCartels and collusion €113.6m

The CMA accepted binding commitments from Barratt Redrow, Bellway, Berkeley, Bloor Homes, Persimmon, Taylor Wimpey and Vistry after investigating whether they had exchanged competitively sensitive information such as achieved sale prices. The companies committed to stop sharing such information, introduce compliance measures and annual competition law training, help develop industry guidance and jointly pay GBP 100m to affordable housing programmes; no infringement was found.

What organisations can take from it

Even exchanging current sale prices with competitors can trigger a competition investigation and large payments; contacts with competitors need clear rules and training.

Relevance to training and awareness

Exchanging pricing and sales information with competitors

Missing or inadequate training played a role in the decision.

Authority / court
Competition and Markets Authority (CMA)
Area of law
Competition law · Cartels and collusion
Legal basis
Chapter I prohibition Competition Act 1998 (Verdacht); Verpflichtungszusagen nach section 31A Competition Act 1998
Action
Other
Status of proceedings
final
Sector
Construction and real estate
Published
30 Oct 2025

Original amount 100,000,000 GBP, converted at the ECB reference rate of 30 Oct 2025.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

27 Oct 2025 SINOP ALFA, s.r.o.SINOP ALFA: 70,000 EUR for refusing to hand over business mobile phone during inspection SlovakiaCompetition law €70,000

During an unannounced inspection in the air-conditioning, refrigeration and heat pump services sector, the company repeatedly refused to produce a mobile phone used for business purposes. The Protimonopolný úrad Slovenskej republiky (Antimonopoly Office of the Slovak Republic, PMÚ SR) regarded this as obstruction of the inspection and imposed 70,000 EUR, around 1% of the previous year’s turnover (not final).

What organisations can take from it

Business smartphones are part of the documents that may be inspected – a dawn raid guide for employees prevents costly wrong reactions.

Relevance to training and awareness

Conduct during inspections (dawn raids), handing over mobile devices

Authority / court
Protimonopolný úrad Slovenskej republiky (PMÚ SR)
Area of law
Competition law
Legal basis
Slowakisches Wettbewerbsschutzgesetz (Mitwirkungspflicht bei Nachprüfungen)
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Culpability
intentional
Published
28 Oct 2025

Checked against the official source on 25 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

2 Oct 2025 Lanes Group LimitedLanes Group: fatal accident with high-pressure hose – 800,000 GBP United KingdomWorkplace safety and accidents €917,326

While a high-pressure jetting system was being primed in freezing conditions in 2022, a pressure release occurred and the end of the hose struck a drainage engineer in the face; he died two and a half weeks later. There was no safe system of work, jetting vices were not properly maintained, monitoring was lacking, and information, instruction, training and supervision were insufficient; fine of 800,000 GBP (reduced from 1.2 million GBP for an early guilty plea) plus 8,680 GBP in costs. According to its consolidated accounts (financial year to July 2024), the company employed 2,268 people and the group 3,610.

What organisations can take from it

Make routine safe with high-pressure equipment: always secure hose ends mechanically, include weather risks such as frost in work instructions and check compliance.

Relevance to training and awareness

Safe working with high-pressure water jetting equipment

Missing or inadequate training played a role in the decision.

Authority / court
City of London Magistrates' Court (Anklage: Health and Safety Executive)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Section 2(1) Health and Safety at Work etc. Act 1974
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Employees
1,000 to 9,999
Mitigating circumstances
Early guilty plea (reduction from 1.2 million GBP to 800,000 GBP)
Published
6 Oct 2025

Original amount 800,000 GBP, converted at the ECB reference rate of 2 Oct 2025.

Checked against the official source on 28 Sep 2026 · Version 2 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

30 Sep 2025 Bauunternehmung Pusiol GmbHConstruction cartel: €130,000 on civil engineering firm Pusiol, losses considered AustriaCartels and collusion €130,000

The Kartellgericht (Cartel Court) fined Bauunternehmung Pusiol GmbH, a subsidiary of Steiner Baugesellschaft m.b.H., allegedly 130,000 EUR for taking part in the construction cartel in Lower Austria from July 2002 to August 2016 (price fixing, market sharing and information exchange in civil engineering tenders). The BWB (Federal Competition Authority) set the fine lower because of the company's limited financial capacity, as it reported annual losses in 2023 and 2024; the company gave a full acknowledgement.

What organisations can take from it

Collusion from long ago is still punished; a strained financial position can reduce the fine but cannot avert it.

Relevance to training and awareness

Bid rigging in tenders

Authority / court
Oberlandesgericht Wien als Kartellgericht (Antrag der Bundeswettbewerbsbehörde)
Area of law
Competition law · Cartels and collusion
Legal basis
§ 1 Abs. 1 KartG und Art. 101 Abs. 1 AEUV; § 29 Abs. 1 Z 1 lit. a und d KartG
Action
Fine
Status of proceedings
final
Sector
Construction and real estate
Repeat case
no
Mitigating circumstances
Limited financial capacity (losses in 2023 and 2024); full acknowledgement.
Published
4 Mar 2026

Checked against the official source on 4 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

1 Sep 2025 SIA "SILTUMTEHSERVISS", SIA "Apkure IM", SIA "ADAPTERIS", SIA "Alpex", SIA "Infrakom"Bid-rigging cartel in pipeline construction contracts – five construction firms pay 513,508 EUR LatviaCartels and collusion €513,508

From 2021 to 2024, two groups of construction companies coordinated in more than 30 public tenders for the construction and repair of utility pipelines: they exchanged sensitive information, determined winners and submitted sham bids. Prompted by information from the contracting entity Rīgas namu pārvaldnieks, the Konkurences padome (Latvian Competition Council) imposed a total of 513,508.08 EUR.

What organisations can take from it

Jointly preparing bids with competitors – even where the work is later carried out jointly – is a cartel; tender teams must know this.

Relevance to training and awareness

Competition law in tenders

Authority / court
Konkurences padome (Lettischer Wettbewerbsrat)
Area of law
Competition law · Cartels and collusion
Legal basis
Art. 11 Abs. 1 Konkurences likums
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Mitigating circumstances
All companies except Infrakom concluded a settlement with the Competition Council, acknowledged the facts and waived an appeal; in return, a 10% fine reduction.
Published
10 Sep 2025

Checked against the official source on 25 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

28 Aug 2025 Home Improvement Marketing LtdICO: £300,000 fine for Home Improvement Marketing over 2.4 million automated calls United KingdomMarketing and consent €347,343

The ICO fined Home Improvement Marketing Ltd £300,000 and issued an enforcement notice. After executing a search warrant in March 2024, it found that between 31 May and 31 August 2023 the company had instigated 2,449,380 automated marketing calls without prior consent; 274 complaints were received. According to the ICO, the software responded to recipients' answers and offered no way to opt out of further calls. The legal basis is regulations 19 and 24 of PECR.

Authority / court
Information Commissioner's Office (ICO)
Area of law
Data protection · Marketing and consent
Legal basis
Regulations 19 und 24 PECR; section 55A DPA 1998
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate

Original amount 300,000 GBP, converted at the ECB reference rate of 28 Aug 2025.

Checked against the official source on 28 Sep 2026 · Version 2 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

28 Aug 2025 Green Spark Energy LtdICO: £250,000 fine for Green Spark Energy over 9.6 million automated marketing calls United KingdomMarketing and consent €289,452

The ICO fined Green Spark Energy Ltd £250,000 and issued an enforcement notice. After executing a search warrant in March 2024, the regulator found that from May 2023 to May 2024 the company had instigated 9,587,050 automated calls carrying recorded marketing messages; 497 complaints were received. According to the ICO, the recordings contained misleading statements designed to pressure homeowners, for example about supposed risks of their existing loft insulation. The legal basis is regulations 19 and 24 of PECR.

Authority / court
Information Commissioner's Office (ICO)
Area of law
Data protection · Marketing and consent
Legal basis
Regulations 19 und 24 PECR; section 55A DPA 1998
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate

Original amount 250,000 GBP, converted at the ECB reference rate of 28 Aug 2025.

Checked against the official source on 28 Sep 2026 · Version 2 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

25 Aug 2025 PAUPE HOLDING SA, Bitusag S.A., Bitusag Neuchâtel SA, Wyss Fils SA, Prodo SA, Duckert SAWEKO fines road maintenance firms in Jura/Neuchâtel over bid rigging SwitzerlandCartels and collusion Fine

Regional suppliers of surface treatments and chip sealing in road maintenance colluded on bids and allocated territories. Switzerland's Competition Commission (Wettbewerbskommission, WEKO) imposed sanctions on Bitusag/Paupe (jointly and severally, CHF 640,000–990,000, exact amount redacted), Wyss Fils (CHF 44,000–74,000), Prodo (CHF 760) and Duckert (CHF 0) and approved amicable settlements; the investigation against Colas Suisse was discontinued.

What organisations can take from it

Small regional road builders are also sanctioned – cover bids and territorial protection must disappear from corporate culture.

Relevance to training and awareness

Cover bids and territorial agreements in regional road construction

Authority / court
Wettbewerbskommission (WEKO)
Area of law
Competition law · Cartels and collusion
Legal basis
Art. 5 Abs. 3 i.V.m. Abs. 1 KG, Art. 49a Abs. 1 KG
Action
Fine
Status of proceedings
unknown
Sector
Construction and real estate
Mitigating circumstances
Amicable settlements; leniency programme (Duckert free of sanctions)

Checked against the official source on 25 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

19 Aug 2025 Allied Stone Inc.Allied Stone: 12.4 million USD – Chinese quartz declared as marble or glass USACustoms €10.6m

The Dallas-based supplier of countertops allegedly declared Chinese quartz surface products between 2018 and 2023 as goods subject to lower duties, such as marble or crystallised glass, and evaded anti-dumping and countervailing duties, including by using third parties as importers of record. The settlement of 12.4 million USD (a joint payment with a further settling party) resolves a whistleblower lawsuit.

What organisations can take from it

Do not rely on third parties acting as importer – you remain liable for the correct description of the goods; customs responsibility cannot be outsourced.

Relevance to training and awareness

Description and classification of goods subject to anti-dumping duties

Authority / court
U.S. Department of Justice, Civil Division, und U.S. Attorney’s Office Northern District of Texas
Area of law
Sanctions and export control · Customs
Legal basis
False Claims Act, 31 U.S.C. §§ 3729 ff. (Vergleich; Haftung nicht festgestellt)
Action
Other
Status of proceedings
final
Sector
Construction and real estate
Liability of senior managers
Measures against individuals are not reported here.
Published
19 Aug 2025

Original amount 12,400,000 USD, converted at the ECB reference rate of 19 Aug 2025.

Checked against the official source on 28 Sep 2026 · Version 2 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

9 Jul 2025 Share buyback disclosed too late: BVwG reduces FMA penalty against real estate company AustriaDisclosure and reporting obligations €300,000

On Saturday, 17 December 2022, the management board of a listed real estate company (anonymised in the judgment) approved by email a new share buyback programme including its volume, period and price, but only published it after a formal resolution on Monday, 19 December 2022. Austria's Financial Market Authority (FMA) imposed a penalty of 375,000 EUR; the Federal Administrative Court (Bundesverwaltungsgericht, BVwG) upheld the breach of the ad hoc disclosure obligation but reduced the penalty to 300,000 EUR.

What organisations can take from it

A final decision by a corporate body triggers the ad hoc disclosure obligation immediately – weekends and outstanding contractual details do not postpone it.

Relevance to training and awareness

Ad hoc disclosure obligation for decisions of corporate bodies, including at weekends

Authority / court
Bundesverwaltungsgericht (Beschwerde gegen Straferkenntnis der Finanzmarktaufsicht FMA)
Area of law
Capital markets and financial supervision · Disclosure and reporting obligations
Legal basis
Art. 17 Abs. 1 MAR i. V. m. § 156 Abs. 3 Z 2, Abs. 4 BörseG 2018
Action
Fine
Status of proceedings
reduced
Sector
Construction and real estate
Culpability
negligent

Checked against the official source on 25 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

2 Jul 2025 ATE, s. r. o.; AŽD Praha s.r.o.; EPLcond a.s.; MONZAS, a.s.; První SaZ Plzeň a.s.; STARMON s.r.o.Railway signalling: 157.7 million CZK against six companies for bid rigging CzechiaCartels and collusion €6.39m

The six companies colluded on cover bids, market sharing and prices in 26 contracts awarded by the state railway infrastructure administration (total value over 850 million CZK, 2015–2021). In a settlement procedure, the Úřad pro ochranu hospodářské soutěže (Czech Office for the Protection of Competition, ÚOHS) imposed a total of 157.693 million CZK at first instance; two companies appealed against the amount.

What organisations can take from it

A cover bid submitted ‘as a favour’ is bid rigging – sales and costing teams must be aware of this.

Relevance to training and awareness

Cover bids and collusion in public tenders

Missing or inadequate training played a role in the decision.

Authority / court
Úřad pro ochranu hospodářské soutěže (ÚOHS)
Area of law
Competition law · Cartels and collusion
Legal basis
Tschechisches Wettbewerbsgesetz, Art. 101 AEUV (Submissionsabsprachen)
Action
Fine
Status of proceedings
under appeal
Sector
Construction and real estate
Culpability
intentional
Mitigating circumstances
Settlement (20% reduction, no procurement ban), leniency application by one participant and compliance programmes at two companies.
Published
2 Jul 2025

Original amount 157,693,000 CZK, converted at the ECB reference rate of 2 Jul 2025.

Checked against the official source on 25 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

2 Jul 2025 9321-0599 Québec Inc.FINTRAC: CAD 23,100 penalty on 9321-0599 Québec Inc. for 2 violations of anti-money laundering obligations CanadaInternal controls €14,401

According to FINTRAC, 9321-0599 Québec Inc. is a real estate brokerage based in Brossard, Québec. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 23,100 on the company on 2 July 2025. According to FINTRAC's findings, made during a compliance examination, the company committed 2 violations of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violations concerned written compliance policies and procedures and assessing and documenting money laundering and terrorist financing risks. According to FINTRAC, the company has appealed the decision to the Federal Court. Source: FINTRAC (Financial Transactions and Reports Analysis Centre of Canada), "Administrative monetary penalty on 9321-0599 Québec Inc.", published 20 November 2025, https://fintrac-canafe.canada.ca/pen/amps/pen-2025-11-20-1-eng; summarised in our own words; not an official version and not a reproduction of the original.

Authority / court
Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
Area of law
Money laundering and terrorist financing · Internal controls
Legal basis
PCMLTFA s. 9.6(1); PCMLTF Regulations 156(1)(b), 156(1)(c); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
Action
Fine
Status of proceedings
under appeal
Sector
Construction and real estate
Published
20 Nov 2025

Original amount 23,100 CAD, converted at the ECB reference rate of 2 Jul 2025.

Checked against the official source on 28 Sep 2026 · Version 3 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

26 Jun 2025 Retta Isännöinti Oy (Retta-Gruppe), Oulun Kiinteistötieto Oy, REIM Group Oy Ltd u. a. (Verband und 11 Gesellschaften)Finnish property management cartel: Supreme Administrative Court raises fines to EUR 6.558m FinlandCartels and collusion €6.56m

The Korkein hallinto-oikeus (Supreme Administrative Court of Finland) found that the association Suomen Isännöintiliitto ry and six property management companies or groups had unlawfully cooperated on price increases in 2014–2017, and raised the fines imposed by the Markkinaoikeus (Market Court) in December 2022 from a total of 4.93 million EUR to 6,558,000 EUR. Breakdown: Retta Isännöinti Oy, Retta Oy, Retta Group Oy and Retta Holding Oy 4,000,000 EUR; Oulun Kiinteistötieto Oy and Suomen Kiinteistöhallinta Oy 900,000 EUR; REIM Hämeenlinna Oy and REIM Group Oy Ltd 750,000 EUR; Colliers Finland Group Oy and Retta Isännöinti Oy 700,000 EUR; OP Koti Kainuu Oy 75,000 EUR; Suomen Isännöintiliitto ry 73,000 EUR; Kiinteistö-Tahkola Tampere Oy 60,000 EUR. The authority had originally sought 22 million EUR.

What organisations can take from it

Trade associations must not circulate price recommendations, and competitors should never discuss their own prices in association bodies.

Relevance to training and awareness

Price discussions and price recommendations in trade associations

Authority / court
Korkein hallinto-oikeus (KHO) auf Antrag des Kilpailu- ja kuluttajavirasto (KKV)
Area of law
Competition law · Cartels and collusion
Legal basis
Kilpailulaki (948/2011) 5 § und 12 §
Action
Fine
Status of proceedings
final
Sector
Construction and real estate
Published
26 Jun 2025

Checked against the official source on 28 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

24 Jun 2025 Pacesetter Marketing Ltd.FINTRAC: CAD 41,085 penalty on Pacesetter Marketing Ltd. for 3 violations of anti-money laundering obligations CanadaInternal controls €25,815

According to FINTRAC, Pacesetter Marketing Ltd. is a real estate brokerage based in Vancouver, British Columbia. Canada's anti-money laundering regulator FINTRAC imposed an administrative monetary penalty of CAD 41,085 on the company on 24 June 2025. According to FINTRAC's findings, made during a compliance examination, the company committed 3 violations of the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA) and its regulations. As described by the regulator, the violations concerned written compliance policies and procedures, assessing and documenting money laundering and terrorist financing risks and the prescribed review of the compliance programme. According to FINTRAC, the company is paying the penalty in full and the case is closed. Source: FINTRAC (Financial Transactions and Reports Analysis Centre of Canada), "Administrative monetary penalty on Pacesetter Marketing Ltd.", published 20 November 2025, https://fintrac-canafe.canada.ca/pen/amps/pen-2025-11-20-2-eng; summarised in our own words; not an official version and not a reproduction of the original.

Authority / court
Financial Transactions and Reports Analysis Centre of Canada (FINTRAC)
Area of law
Money laundering and terrorist financing · Internal controls
Legal basis
PCMLTFA s. 9.6(1); PCMLTF Regulations 156(1)(b), 156(1)(c), 156(1)(f), 156(3); Verwaltungsgeldbuße nach Teil 4.1 PCMLTFA
Action
Fine
Status of proceedings
final
Sector
Construction and real estate
Published
20 Nov 2025

Original amount 41,085 CAD, converted at the ECB reference rate of 24 Jun 2025.

Checked against the official source on 28 Sep 2026 · Version 3 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

Load 20 more of 67

Ready for training that actually lands?

Try the combination for free: automated administration for you, learning formats that fit your team, with no minimum or credit card.

Start 14-day free trial