Compliance Radar
Who was sanctioned, and for what?
Fines, court rulings and incidents from Europe, North America, Latin America, Asia-Pacific and Middle East: 1,929 cases from 40 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.
Click a bar to drill down one level.
Where?
by regionAll jurisdictions
What for?
by area of lawAll areas of law
Who?
by company- Anonymised companies €153.3m 35 % · 22 cases
- Barratt Redrow, Persimmon, Taylor Wimpey u. a. (7 Wohnungsbauunternehmen) €113.6m 26 % · 1 case
- AS Asphaltstraßensanierung GmbH, BITUNOVA GmbH, Kutter Spezialstraßenbau GmbH & Co. KG, Possehl Construction GmbH (inkl. VSI), Liesen…alles für den Bau GmbH, OAT GmbH/Otto Alte-Teigeler GmbH €60.3m 14 % · 1 case
- Colas Rail Asia Sdn Bhd (Colas-Gruppe) €29.7m 7 % · 1 case
- Allied Stone Inc. €10.6m 2 % · 1 case
- AS Asphaltstraßensanierung, BITUNOVA, Mainka u. a. (Straßenerhaltungskartell, 7 Unternehmen) €10.5m 2 % · 1 case
- Strukton Civiel Projecten B.V. und Strukton International B.V. (Strukton-Gruppe) €10m 2 % · 1 case
- Decora S.A., Bel-Pol sp. z o.o. €7.9m 2 % · 1 case
- Evolutions Flooring Inc. €7.48m 2 % · 1 case
- Retta Isännöinti Oy (Retta-Gruppe), Oulun Kiinteistötieto Oy, REIM Group Oy Ltd u. a. (Verband und 11 Gesellschaften) €6.56m 1 % · 1 case
- 57 more€32.4m
When?
per quarter, by date of decision| Period | Cases | Total |
|---|---|---|
| Q4 2023 | 0 | – |
| Q1 2024 | 0 | – |
| Q2 2024 | 0 | – |
| Q3 2024 | 0 | – |
| Q4 2024 | 0 | – |
| Q1 2025 | 0 | – |
| Q2 2025 | 0 | – |
| Q3 2025 | 0 | – |
| Q4 2025 | 1 | €69,784 |
| Q1 2026 | 0 | – |
| Q2 2026 | 0 | – |
| Q3 2026 | 0 | – |
| Q4 2026 | 0 | – |
1 case
12 Dec 2025 Newway Concrete FormingNewway Concrete Forming: CAD 112,624.66 penalty after fatal flytable incident €69,784
In February 2024 the formwork contractor was moving a flytable by tower crane at the Oakridge Park construction site when it fell out of the building and fatally struck a worker. WorkSafeBC found, among other things, missing written lift plans for critical lifts, inadequate procedures for corner flytables, a lack of risk assessments and inspections, loads being passed over people and insufficient instruction, training and supervision of workers, and imposed an administrative penalty of CAD 112,624.66.
Formwork and lifting crews need written step-by-step procedures, trained ground control workers and controlled exclusion zones.
Safe lifting and formwork operations, training of ground control workers
Missing or inadequate training played a role in the decision.
- Authority / court
- WorkSafeBC (Workers' Compensation Board of British Columbia)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Arbeitsschutzvorschriften von British Columbia, insbesondere Occupational Health and Safety Regulation (OHSR) – Hebepläne, Schalungsarbeiten, Unterweisung und Aufsicht; Verwaltungsstrafe (administrative penalty) von WorkSafeBC
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 12 Dec 2025
Original amount 112,624.66 CAD, converted at the ECB reference rate of 12 Dec 2025.
Checked against the official source on 3 Oct 2026 · Direct link