Compliance Radar
Who was sanctioned, and for what?
Fines, court rulings and incidents from Europe, North America, Latin America, Asia-Pacific, Middle East and Africa: 2,229 cases from 44 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.
Click a bar to drill down one level.
Where?
by authority- Oberlandesgericht Wien als Kartellgericht (Antrag der Bundeswettbewerbsbehörde) €530,000 63 % · 2 cases
- Bundesverwaltungsgericht (Beschwerde gegen Straferkenntnis der Finanzmarktaufsicht FMA) €300,000 36 % · 1 case
- Datenschutzbehörde (DSB) €10,000 1 % · 1 case
What for?
by area of lawAll areas of law
Who?
by company- MAGEBA Gesellschaft m.b.H.; Maurer SE, Maurer Söhne Ges. mbH (nur Feststellung) €400,000 74 % · 1 case
- Bauunternehmung Pusiol GmbH €130,000 24 % · 1 case
- Anonymised companies €10,000 2 % · 1 case
When?
per quarter, by date of decision| Period | Cases | Total |
|---|---|---|
| Q4 2023 | 1 | €10,000 |
| Q1 2024 | 0 | – |
| Q2 2024 | 0 | – |
| Q3 2024 | 0 | – |
| Q4 2024 | 0 | – |
| Q1 2025 | 0 | – |
| Q2 2025 | 1 | €400,000 |
| Q3 2025 | 2 | €430,000 |
| Q4 2025 | 0 | – |
| Q1 2026 | 0 | – |
| Q2 2026 | 0 | – |
| Q3 2026 | 0 | – |
| Q4 2026 | 0 | – |
4 cases
30 Sep 2025 Bauunternehmung Pusiol GmbHConstruction cartel: €130,000 on civil engineering firm Pusiol, losses considered €130,000
The Kartellgericht (Cartel Court) fined Bauunternehmung Pusiol GmbH, a subsidiary of Steiner Baugesellschaft m.b.H., allegedly 130,000 EUR for taking part in the construction cartel in Lower Austria from July 2002 to August 2016 (price fixing, market sharing and information exchange in civil engineering tenders). The BWB (Federal Competition Authority) set the fine lower because of the company's limited financial capacity, as it reported annual losses in 2023 and 2024; the company gave a full acknowledgement.
Collusion from long ago is still punished; a strained financial position can reduce the fine but cannot avert it.
Bid rigging in tenders
- Authority / court
- Oberlandesgericht Wien als Kartellgericht (Antrag der Bundeswettbewerbsbehörde)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- § 1 Abs. 1 KartG und Art. 101 Abs. 1 AEUV; § 29 Abs. 1 Z 1 lit. a und d KartG
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Repeat case
- no
- Mitigating circumstances
- Limited financial capacity (losses in 2023 and 2024); full acknowledgement.
- Published
- 4 Mar 2026
Checked against the official source on 4 Oct 2026 · Direct link
Report an error
9 Jul 2025 Share buyback disclosed too late: BVwG reduces FMA penalty against real estate company €300,000
On Saturday, 17 December 2022, the management board of a listed real estate company (anonymised in the judgment) approved by email a new share buyback programme including its volume, period and price, but only published it after a formal resolution on Monday, 19 December 2022. Austria's Financial Market Authority (FMA) imposed a penalty of 375,000 EUR; the Federal Administrative Court (Bundesverwaltungsgericht, BVwG) upheld the breach of the ad hoc disclosure obligation but reduced the penalty to 300,000 EUR.
A final decision by a corporate body triggers the ad hoc disclosure obligation immediately – weekends and outstanding contractual details do not postpone it.
Ad hoc disclosure obligation for decisions of corporate bodies, including at weekends
- Authority / court
- Bundesverwaltungsgericht (Beschwerde gegen Straferkenntnis der Finanzmarktaufsicht FMA)
- Area of law
- Capital markets and financial supervision · Disclosure and reporting obligations
- Legal basis
- Art. 17 Abs. 1 MAR i. V. m. § 156 Abs. 3 Z 2, Abs. 4 BörseG 2018
- Action
- Fine
- Status of proceedings
- reduced
- Sector
- Construction and real estate
- Culpability
- negligent
- BVwG W279 2310813-1 vom 09.07.2025 Court decision
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
5 Jun 2025 MAGEBA Gesellschaft m.b.H.; Maurer SE, Maurer Söhne Ges. mbH (nur Feststellung)Bridge component suppliers: €400,000 fine on MAGEBA, leniency applicant Maurer not fined €400,000
The Kartellgericht (Cartel Court) fined MAGEBA Gesellschaft m.b.H. 400,000 EUR because, from November 2017 to December 2018, it shared customers for road expansion joints and bridge bearings in Austria with a competitor and exchanged information on pricing behaviour. Against Maurer SE and Maurer Söhne Ges. mbH the court merely declared the infringement because of their leniency status. A compliance system introduced in the course of cooperation was taken into account in mitigation, and intent in a hardcore restriction as an aggravating factor.
The first to report a cartel can escape a fine entirely, while those who wait pay; this argues for internal reporting channels and quick decisions on a leniency application.
Customer allocation and the leniency programme
- Authority / court
- Oberlandesgericht Wien als Kartellgericht (Antrag der Bundeswettbewerbsbehörde)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- § 1 Abs. 1 KartG; § 29 Abs. 1 Z 1 lit. a KartG; § 28 Abs. 1 und 1a Z 1 KartG (Feststellung gegenüber Kronzeugin)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Culpability
- intentional
- Repeat case
- no
- Mitigating circumstances
- Only five projects over about 13 months, no enrichment established, low-level information exchange, the group's economic difficulties, compliance system introduced in the course of cooperation.
- Published
- 18 Nov 2025
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
7 Dec 2023 an Austrian non-profit housing companyNon-profit housing company: €10,000 for ignoring data protection authority requests €10,000
The DSB (Datenschutzbehörde, Austrian data protection authority) fined a non-profit housing company limited by shares 10,000 EUR because it left several requests for comments in a complaint procedure between November 2021 and June 2022 unanswered, thereby breaching its duty to cooperate with the supervisory authority. The cause was internal failings in forwarding official letters; the DSB found conditional intent. Mitigating factors were the confession, the absence of previous infringements and a new control system for official mail together with staff training.
Mail from supervisory authorities needs a reliable internal intake and forwarding process with deadline control, otherwise silence alone leads to a fine.
Handling letters from the data protection authority
Missing or inadequate training played a role in the decision.
- Authority / court
- Datenschutzbehörde (DSB)
- Area of law
- Data protection
- Legal basis
- Art. 31 iVm Art. 58 Abs. 1 lit. a und e DSGVO; Art. 83 Abs. 4 lit. a DSGVO
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Culpability
- intentional
- Repeat case
- no
- Mitigating circumstances
- No previous infringements; cooperation, insight and confession; new control system for official documents and internal data protection training.
- RIS, Entscheidungen der Datenschutzbehörde (Suche) (Entscheidung 2023) Decision of an authority
Checked against the official source on 2 Oct 2026 · Company name anonymised since 7 Dec 2025 · Direct link