Fines, court rulings and incidents from Europe, North America, Latin America, Asia-Pacific, Middle East and Africa: 2,229 cases from 44 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.
Click a bar to drill down one level.
Where?
by provinceWhat for?
by area of lawAll areas of law
Who?
by company- EllisDon Corporation €318,998 48 % · 1 case
- Anonymised companies €272,982 41 % · 1 case
- Newway Concrete Forming €69,784 11 % · 1 case
When?
per quarter, by date of decision| Period | Cases | Total |
|---|---|---|
| Q4 2023 | 1 | €272,982 |
| Q1 2024 | 0 | – |
| Q2 2024 | 0 | – |
| Q3 2024 | 0 | – |
| Q4 2024 | 0 | – |
| Q1 2025 | 0 | – |
| Q2 2025 | 0 | – |
| Q3 2025 | 0 | – |
| Q4 2025 | 2 | €388,782 |
| Q1 2026 | 0 | – |
| Q2 2026 | 0 | – |
| Q3 2026 | 0 | – |
| Q4 2026 | 0 | – |
3 cases
12 Dec 2025 EllisDon CorporationEllisDon: CAD 514,831.53 penalty after fatal crane incident at high-rise site €318,998
In February 2024 a flytable was being moved by tower crane at the Oakridge Park construction site; as it was pushed out it accelerated out of the building, fell and fatally struck a worker. WorkSafeBC found that EllisDon, as prime contractor, had not regularly reviewed the subcontractor's safe work procedures, had not confirmed that a risk assessment had been carried out, had not classed the lift as critical, had not ensured written lift plans, had not controlled the exclusion zone on the ground and had not coordinated the health and safety activities of the employers involved. It imposed an administrative penalty of CAD 514,831.53.
Prime contractors must actively plan, review and coordinate their subcontractors' critical crane lifts rather than relying on their procedures.
Coordinating health and safety and critical lifts on multi-employer construction sites
- Authority / court
- WorkSafeBC (Workers' Compensation Board of British Columbia)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Arbeitsschutzvorschriften von British Columbia, insbesondere Occupational Health and Safety Regulation (OHSR) – Pflichten des Hauptauftragnehmers (prime contractor) und Anforderungen an kritische Kranhübe; Verwaltungsstrafe (administrative penalty) von WorkSafeBC
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 12 Dec 2025
Original amount 514,831.53 CAD, converted at the ECB reference rate of 12 Dec 2025.
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
12 Dec 2025 Newway Concrete FormingNewway Concrete Forming: CAD 112,624.66 penalty after fatal flytable incident €69,784
In February 2024 the formwork contractor was moving a flytable by tower crane at the Oakridge Park construction site when it fell out of the building and fatally struck a worker. WorkSafeBC found, among other things, missing written lift plans for critical lifts, inadequate procedures for corner flytables, a lack of risk assessments and inspections, loads being passed over people and insufficient instruction, training and supervision of workers, and imposed an administrative penalty of CAD 112,624.66.
Formwork and lifting crews need written step-by-step procedures, trained ground control workers and controlled exclusion zones.
Safe lifting and formwork operations, training of ground control workers
Missing or inadequate training played a role in the decision.
- Authority / court
- WorkSafeBC (Workers' Compensation Board of British Columbia)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Arbeitsschutzvorschriften von British Columbia, insbesondere Occupational Health and Safety Regulation (OHSR) – Hebepläne, Schalungsarbeiten, Unterweisung und Aufsicht; Verwaltungsstrafe (administrative penalty) von WorkSafeBC
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 12 Dec 2025
Original amount 112,624.66 CAD, converted at the ECB reference rate of 12 Dec 2025.
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
15 Dec 2023 two Canadian construction companies (a steel fabricator and a concrete firm)Building collapse in Ontario: steel fabricator and concrete firm pay CA$400,000 €272,982
In December 2020, part of a new building collapsed while concrete was being poured on the roof level; two workers died and four were seriously injured. The manufacturer of the structural steel system had not ensured its load-bearing capacity, and the concrete firm had not adequately instructed its workers on correct measuring procedures. Fines of CA$260,000 (steel fabricator) and CA$140,000 (concrete firm).
In subcontracting chains, the structural system manufacturer and the supervising contractor each remain responsible in their own right – passing on the work does not relieve them.
Instruction on concrete pouring specifications and load limits
Missing or inadequate training played a role in the decision.
- Authority / court
- Ontario Court of Justice London (Ermittlung: Ontario Ministry of Labour, Immigration, Training and Skills Development)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 25(1)(e)(iii) und Section 25(2)(a) Occupational Health and Safety Act (Ontario)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Mitigating circumstances
- Guilty pleas by both companies.
- Published
- 5 Jan 2024
Original amount 400,000 CAD, converted at the ECB reference rate of 15 Dec 2023.
- Ontario Ministry of Labour, Meldungen (Übersicht) (Entscheidung 2023) Press release of an authority