Compliance Radar
Who was sanctioned, and for what?
Fines, court rulings and incidents from Europe, North America, Latin America and Asia-Pacific: 1,905 cases from 39 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.
Click a bar to drill down one level.
Where?
by authority- Uxbridge Magistrates' Court (Anklage: Health and Safety Executive) €462,583 100 % · 1 case
What for?
by area of lawAll areas of law
Who?
by company- Barratt Redrow, Persimmon, Taylor Wimpey u. a. (7 Wohnungsbauunternehmen) €113.6m 96 % · 1 case
- Dragon Alfa Cement Limited €1.17m 1 % · 1 case
- Lanes Group Limited €917,326 1 % · 1 case
- Tarmac Building Products Limited €731,124 1 % · 1 case
- SCS Railways (Joint Venture von Skanska Construction UK Limited, Costain Limited und Strabag AG) €462,583 0 % · 1 case
- Hillbeck Homes (Sowerby Bridge) Ltd €349,895 0 % · 1 case
- Home Improvement Marketing Ltd €347,343 0 % · 1 case
- Green Spark Energy Ltd €289,452 0 % · 1 case
- Thermotech Wall and Loft Surveys Ltd €276,928 0 % · 1 case
- BDW Trading (Barratt Redrow) €234,153 0 % · 1 case
- 5 more€240,104
When?
per quarter, by date of decision| Period | Cases | Total |
|---|---|---|
| Q4 2023 | 0 | – |
| Q1 2024 | 0 | – |
| Q2 2024 | 0 | – |
| Q3 2024 | 0 | – |
| Q4 2024 | 0 | – |
| Q1 2025 | 0 | – |
| Q2 2025 | 0 | – |
| Q3 2025 | 0 | – |
| Q4 2025 | 0 | – |
| Q1 2026 | 0 | – |
| Q2 2026 | 1 | €462,583 |
| Q3 2026 | 0 | – |
| Q4 2026 | 0 | – |
1 case
16 Jun 2026 SCS Railways (Joint Venture von Skanska Construction UK Limited, Costain Limited und Strabag AG)HS2 joint venture SCS Railways: £400,000 fine after tipper truck fall €462,583
SCS Railways, a joint venture of Skanska, Costain and Strabag on the HS2 rail project, was fined £400,000 and ordered to pay £8,974 in costs. On 27 July 2021 at the Copthall North site near Uxbridge, a 20-tonne tipper truck belonging to a contracted haulage company fell from an excavation ramp and the driver was injured. The Health and Safety Executive found neither signage nor edge protection on the vehicle routes; a traffic route changed on the morning of the incident had left an unprotected edge and had been neither properly planned nor communicated in time.
Every short-notice change to site vehicle routes needs a risk check and immediate briefing of all drivers.
Traffic routes and change management on major construction sites
- Authority / court
- Uxbridge Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 3(1) Health and Safety at Work etc. Act 1974
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Mitigating circumstances
- Guilty plea.
- Published
- 26 Jun 2026
Original amount 400,000 GBP, converted at the ECB reference rate of 16 Jun 2026.
- HSE: HS2 contractor fined £400,000 after tipper truck driver injured (26.06.2026) Press release of an authority