Compliance Radar
Who was sanctioned, and for what?
Fines, court rulings and incidents from Europe, North America, Latin America, Asia-Pacific, Middle East and Africa: 2,229 cases from 44 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.
Click a bar to drill down one level.
Where?
by regionAll jurisdictions
What for?
by action- Fine €579,310 100 % · 3 cases
Who?
by company- Anonymised companies €377,208 65 % · 2 cases
- Cadia Holdings Pty Ltd €202,102 35 % · 1 case
When?
per quarter, by date of decision| Period | Cases | Total |
|---|---|---|
| Q4 2023 | 0 | – |
| Q1 2024 | 1 | €154,671 |
| Q2 2024 | 0 | – |
| Q3 2024 | 1 | €222,537 |
| Q4 2024 | 0 | – |
| Q1 2025 | 1 | €202,102 |
| Q2 2025 | 0 | – |
| Q3 2025 | 0 | – |
| Q4 2025 | 0 | – |
| Q1 2026 | 0 | – |
| Q2 2026 | 0 | – |
| Q3 2026 | 0 | – |
| Q4 2026 | 0 | – |
3 cases
31 Mar 2025 Cadia Holdings Pty LtdCadia Holdings: 350,000 AUD for excessive dust emissions from a mine €202,102
Cadia Holdings Pty Ltd, a Newmont Mining company (formerly Newcrest Mining), was sentenced by the Land and Environment Court of NSW after pleading guilty to three offences under s 128(1)(b) of the Protection of the Environment Operations Act 1997, because poorly operated mine exhaust fans exceeded the concentration limit for solid particles three times between November 2021 and May 2023. The court imposed fines totalling 350,000 AUD and ordered a payment of 61,500 AUD to the Department of Climate Change, Energy, Environment and Water (DCCEEW) for a new dust monitor in the Rural Air Quality Monitoring Network; in addition, the company must pay the EPA's costs and publish notices in three newspapers.
Emission-relevant equipment such as exhaust fans must be operated and monitored so that limits are also met in day-to-day operation.
Dust emissions and limits in mining
- Authority / court
- NSW Environment Protection Authority (EPA NSW)
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- Protection of the Environment Operations Act 1997 (NSW) s 128(1)(b); Zahlungsanordnung nach s 250(1)(e)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Steel and metals
- Repeat case
- no
- Mitigating circumstances
- Guilty pleas at the earliest opportunity (25% discount); no prior convictions, good character and a low risk of reoffending (further 5% discount).
- Published
- 2 Apr 2025
Original amount 350,000 AUD, converted at the ECB reference rate of 31 Mar 2025.
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
27 Aug 2024 a US steelworksSteelworks: EPA settlement over pollutant emissions €222,537
The steelworks on Lake Michigan allegedly emitted excessive particulate matter and hazardous air pollutants when charging the basic oxygen furnaces and during overflows of molten material. Under the settlement with the U.S. Environmental Protection Agency (EPA), the company is paying 248,396 USD and must charge more slowly, improve extraction and monitoring, and introduce video recording and reporting to the EPA.
Emission peaks often result from operating procedures; binding work instructions and documentation are part of permit compliance.
Operating procedures for reducing emissions in production
- Authority / court
- U.S. Environmental Protection Agency (EPA)
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- Clean Air Act
- Action
- Fine
- Status of proceedings
- final
- Sector
- Steel and metals
- Published
- 27 Aug 2024
Original amount 248,396 USD, converted at the ECB reference rate of 27 Aug 2024.
- EPA, Pressemitteilungen (Suche) (Entscheidung 2024) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 27 Aug 2026 · Direct link
Report an error
15 Feb 2024 a Canadian scrap metal recyclerScrap metal recycler: CAD 225,000 fine over unapproved shear and shredder explosions €154,671
At one site in Hamilton the scrap metal recycler installed a new metal shear without applying for the required amendment to its environmental approval; this came to light after noise complaints. At a second site explosions occurred in the automotive shredder despite a ministry order because explosive materials had not been removed, and two explosions were not reported. The court convicted the company of five offences under the Environmental Protection Act and fined it CAD 225,000 plus a victim fine surcharge of CAD 56,250.
New equipment needs an amended approval before it goes into operation, and reporting duties imposed by the regulator also apply to seemingly minor incidents.
Approval requirements for plant changes and regulatory reporting duties
- Authority / court
- Gericht in Hamilton (Ermittlung und Anklage: Ontario Ministry of the Environment, Conservation and Parks)
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- Environmental Protection Act (Ontario), RSO 1990, c E.19 – Betrieb einer Anlage ohne Genehmigung und Nichtbefolgung einer Ministeriumsanordnung
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Steel and metals
- Published
- 12 Apr 2024
Original amount 225,000 CAD, converted at the ECB reference rate of 15 Feb 2024.
- Ontario Newsroom, Veröffentlichungen (Übersicht) (Entscheidung 2024) Press release of an authority
Checked against the official source on 3 Oct 2026 · Company name anonymised since 15 Feb 2026 · Direct link