Compliance Radar
Who was sanctioned, and for what?
Fines, court rulings and incidents from Europe, North America, Latin America, Asia-Pacific, Middle East and Africa: 2,229 cases from 44 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.
Click a bar to drill down one level.
Where?
by levelWhat for?
by topicWho?
by company- The Manitowoc Company, Inc.; Grove U.S. L.L.C.; Manitowoc Crane Group Germany GmbH €41m 73 % · 1 case
- Anonymised companies €14.9m 27 % · 1 case
When?
per quarter, by date of decision| Period | Cases | Total |
|---|---|---|
| Q4 2023 | 0 | – |
| Q1 2024 | 1 | €14.9m |
| Q2 2024 | 0 | – |
| Q3 2024 | 0 | – |
| Q4 2024 | 1 | €41m |
| Q1 2025 | 0 | – |
| Q2 2025 | 0 | – |
| Q3 2025 | 0 | – |
| Q4 2025 | 0 | – |
| Q1 2026 | 0 | – |
| Q2 2026 | 0 | – |
| Q3 2026 | 0 | – |
| Q4 2026 | 0 | – |
2 cases
19 Dec 2024 The Manitowoc Company, Inc.; Grove U.S. L.L.C.; Manitowoc Crane Group Germany GmbHManitowoc: USD 42.6m for cranes with uncertified diesel engines €41m
Under a consent decree, crane maker Manitowoc and two subsidiaries will pay a civil penalty of 42,600,000 USD because, between 2014 and 2018, they allegedly sold cranes with at least 1,032 diesel engines that were covered neither by a valid EPA certificate of conformity nor by the transition programme for equipment manufacturers; reporting, bonding and labelling requirements were also breached. In addition, the companies will fund the repowering of a locomotive in the Sparrows Point area (Baltimore) with an engine meeting current emission standards. According to the EPA, the court approved the settlement in March 2025.
Companies using transitional engine allowances must be able to allocate every installed unit – otherwise it counts as uncertified.
Certification of engines in imported machinery
- Authority / court
- U.S. Environmental Protection Agency (EPA) / U.S. Department of Justice (U.S. District Court, Eastern District of Wisconsin)
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- Clean Air Act, Sections 203(a) und 213(d) (Mobile-Source-Vorschriften für Offroad-Dieselmotoren)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Manufacturing and mechanical engineering
- Published
- 19 Dec 2024
Original amount 42,600,000 USD, converted at the ECB reference rate of 19 Dec 2024.
- EPA: Manitowoc Company Clean Air Act Settlement Summary Press release of an authority
- Proposed Consent Decree, United States v. The Manitowoc Company, Inc. et al., Civil Action 2:24-cv-1635 (E.D. Wis.) Decision of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
4 Mar 2024 a Japanese engine manufacturerJapanese engine manufacturer: USD 16.2m CARB settlement over refrigeration unit engines €14.9m
The California Air Resources Board (CARB) reached a settlement of 16,196,120 USD with a Japanese engine manufacturer. Almost 20,000 engines, mainly for transport refrigeration units, were affected: an incompletely reported auxiliary emission control device (AECD), the use of test procedures not applicable to the engine type, and the production of large spark-ignition engines not covered by the CARB certification. According to CARB, the company made modifications to address the incomplete reporting so that it will meet certification requirements in future.
Every device that affects emission control belongs in full in the certification application – even for small engines.
Complete information in certification procedures
- Authority / court
- California Air Resources Board (CARB)
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- CARB Off-Road Compression-Ignition Engines and Equipment Regulation
- Action
- Fine
- Status of proceedings
- final
- Sector
- Manufacturing and mechanical engineering
- Published
- 4 Mar 2024
Original amount 16,196,120 USD, converted at the ECB reference rate of 4 Mar 2024.
- California Air Resources Board (CARB), Veröffentlichung der Behörde (Entscheidung 2024) Decision of an authority
Checked against the official source on 8 Oct 2026 · Company name anonymised since 4 Mar 2026 · Direct link