Fines, court rulings and incidents from Europe, North America, Latin America, Asia-Pacific, Middle East and Africa: 2,229 cases from 44 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.
Click a bar to drill down one level.
Where?
by countryWhat for?
by area of lawWho?
by sectorAll sectors
- Energy and utilities €226.5m 53 % · 3 cases
- Construction and real estate €62.3m 15 % · 5 cases
- Manufacturing and mechanical engineering €45.3m 11 % · 4 cases
- Steel and metals €25.8m 6 % · 3 cases
- Transport, logistics and shipping €21m 5 % · 4 cases
- Other €20.1m 5 % · 4 cases
- Telecoms, IT and software €16.6m 4 % · 2 cases
- Food and agriculture €2.2m 1 % · 5 cases
- Healthcare €1.77m 0 % · 1 case
- Chemicals and pharmaceuticals €1.3m 0 % · 2 cases
- 3 more€1m
When?
per year, by date of decision| Period | Cases | Total |
|---|---|---|
| 2022 | 1 | €15.9m |
| 2023 | 6 | €245m |
| 2024 | 7 | €2.23m |
| 2025 | 15 | €90.3m |
| 2026 | 8 | €70.5m |
37 cases
5 Aug 2026 GmbH (im Urteil anonymisiert)Illegal dumping of construction waste: company must pay €375,000 forfeiture €375,000
The Oberlandesgericht (OLG, Higher Regional Court) Linz added a forfeiture of 375,000 EUR to the conviction of a limited company under the Verbandsverantwortlichkeitsgesetz (VbVG, Austrian Corporate Criminal Liability Act) for intentionally handling and moving waste in a way that endangered the environment; the suspended corporate fine of 30 daily rates of 500 EUR (15,000 EUR) imposed by the Landesgericht (Regional Court) Salzburg remained in place. From May 2021 to May 2024 and again from May 2025 to February 2026, contrary to the AWG 2002 (Waste Management Act) and partly to an official decision, the company had excavated soil, construction waste, asphalt and concrete rubble accepted for payment and deposited on a plot; removal costs were put at around 3.24 million EUR. Only the forfeiture of EUR 375,000 is recorded as the amount; the corporate fine of EUR 15,000 was conditionally suspended.
Anyone accepting and depositing waste without a permit risks not only a corporate fine but also forfeiture of the fees received for it, which can far exceed the fine.
Waste law and official conditions for excavated soil and construction waste
- Authority / court
- Oberlandesgericht Linz (Berufung gegen Urteil des Landesgerichts Salzburg vom 06.03.2026)
- Area of law
- Environment and sustainability · Waste and hazardous substances
- Legal basis
- § 181b Abs. 1 und 2 StGB; §§ 3, 4 Abs. 1 und 3, § 6 Abs. 1, § 14 Abs. 1 VbVG; § 20 Abs. 3 StGB; AWG 2002
- Action
- Disgorgement of profits
- Status of proceedings
- final
- Sector
- Other
- Culpability
- intentional
- Repeat case
- no
- Mitigating circumstances
- No previous convictions of the company; rather low environmental risk. Further circumstances taken into account by the court concern a natural person and are not reported here.
- Liability of senior managers
- Under the VbVG, the company's liability is linked to the conduct of its managing director.
- OLG Linz, 9 Bs 153/26b vom 05.08.2026 (RIS) Court decision
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
13 May 2026 NaphtachimieMarseille: environmental CJIP with Naphtachimie for €1.2m after oil leaks at Lavéra €1.2m
Pyrolysis oil leaked twice at the Lavéra petrochemical site in Martigues: around 50 tonnes in July 2018 through a failed seal into the Anse d'Auguette, part of which reached the sea, and around one tonne in April 2022 through a corroded seawater pipe, of which some 500 kg reached the Anse d'Auguette. Naphtachimie therefore concluded an environmental CJIP (convention judiciaire d'intérêt public, French deferred prosecution agreement) with the Marseille public prosecutor; it pays a public interest fine of 1,200,000 EUR, compensates two environmental associations and will trial, at its own expense, a biological clean-up of the Anse d'Auguette; validated on 13 May 2026.
Seals and pipes at plants handling substances hazardous to water must be inspected proactively; leaks lead to fines and remediation duties.
Maintenance and leak prevention at industrial sites near water
- Authority / court
- Parquet de Marseille (Procureur de la République); Validierung durch den Präsidenten des Tribunal judiciaire de Marseille
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- Art. 41-1-3 Code de procédure pénale (pollution des eaux)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Chemicals and pharmaceuticals
- Published
- 26 May 2026
- Communiqué de presse du parquet de Marseille, 26 mai 2026 (CJIP-E Naphtachimie) Press release of an authority
- Ministère de la Justice: Liste der Conventions judiciaires d'intérêt public Official register or notice
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
19 Mar 2026 Colas Rail Asia Sdn Bhd (Colas-Gruppe)Colas Rail Asia: CJIP of 29.7 million EUR over bribery in metro contracts in Malaysia €29.7m
The Malaysian subsidiary of Colas Rail paid large, undocumented sums via intermediaries in connection with public contracts for urban rail lines in Kuala Lumpur (Kelana Jaya extension, MRT2). Following an internal investigation, Colas Rail self-reported the matter in 2017; the CJIP (Convention judiciaire d'intérêt public, a French deferred prosecution agreement) provides for a public interest fine of 29,745,974 EUR and a three-year compliance programme monitored by the French Anti-Corruption Agency (AFA) (costs of up to 1.9 million EUR).
Undocumented payments to intermediaries on foreign projects must be stopped early by the finance and compliance functions – self-reporting after an internal investigation is rewarded.
Intermediaries and consultants in public tenders
- Authority / court
- Parquet national financier (PNF); Validierung durch den Präsidenten des Tribunal judiciaire de Paris
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale (CJIP); Bestechung ausländischer Amtsträger
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Employees
- 10,000 or more
- Culpability
- intentional
- Mitigating circumstances
- Self-report (criminal complaint filed by Colas Rail on 31 May 2017) following an internal forensic investigation.
- Liability of senior managers
- The CJIP does not address the criminal liability of natural persons.
- Published
- 19 Mar 2026
- Communiqué de presse du procureur de la République financier – CJIP COLAS RAIL ASIA Press release of an authority
- Convention judiciaire d'intérêt public – COLAS RAIL ASIA (17.03.2026) Decision of an authority
- Ministère de la Justice: Conventions judiciaires d'intérêt public (Verzeichnis) Official register or notice
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
19 Mar 2026 Balt USA LLC (Balt-Gruppe)Balt USA: CJIP in France over payments to a hospital physician €1.77m
In parallel with the US declination, the PNF concluded a CJIP with the US subsidiary of the French medical technology manufacturer for 1,765,493 EUR (after crediting the US disgorgement) and a three-year AFA compliance programme. The case arose from Balt SAS's voluntary self-disclosure of 22 May 2023 concerning conduct at the acquired company Blockade Medical.
Acquisitions require anti-corruption due diligence on the target company – otherwise legacy misconduct by its management becomes a group risk.
Benefits to hospital physicians, integration of acquired companies
- Authority / court
- Parquet national financier (PNF); Validierung durch den Präsidenten des Tribunal judiciaire de Paris
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale (CJIP); aktive und passive Bestechung von Amtsträgern
- Action
- Fine
- Status of proceedings
- final
- Sector
- Healthcare
- Employees
- 250 to 999
- Culpability
- intentional
- Mitigating circumstances
- Voluntary self-disclosure to the PNF and the DOJ; coordinated resolution with crediting.
- Liability of senior managers
- The CJIP does not address the criminal liability of natural persons.
- Published
- 19 Mar 2026
- Communiqué de presse du procureur de la République financier – CJIP BALT USA Press release of an authority
- Ministère de la Justice – Conventions judiciaires d'intérêt public (Liste) Official register or notice
- CJIP Société BALT USA LLC (17.03.2026) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
10 Mar 2026 Vier Unternehmen eines Bodenaufbereitungskonzerns aus Barneveld (anonymisiert)OM: €1.125m against four soil firms from Barneveld over environmental fraud €1.13m
The Openbaar Ministerie (OM, Dutch Public Prosecution Service) imposed penalty orders totalling 1,125,000 EUR on four companies from Barneveld that belonged to the same group at the time and are not named in the releases, consisting of 660,000 EUR in fines and 465,000 EUR in confiscation of unlawfully obtained gains. According to the OM, between 2013 and 2016 the firms accepted excessively contaminated sand, cleaned it inadequately or incorrectly and deliberately mixed it with cleaner sand for reuse, in breach of permit conditions and the Wet milieubeheer (Environmental Management Act) and involving forgery. The companies initially lodged an objection (verzet) but withdrew it, so the penalty orders are final (release of 2 July 2026).
In certified recycling chains no stage may bypass acceptance or testing criteria; mixing to conceal contamination turns a permit breach into environmental fraud.
Integrity in certified recycling chains for soil and waste
- Authority / court
- Openbaar Ministerie (OM), Functioneel Parket
- Area of law
- Environment and sustainability · Waste and hazardous substances
- Legal basis
- Vorschriften der Umgebungsgenehmigungen (omgevingsvergunningen); Wet milieubeheer; valsheid in geschrift; Strafbefehle des OM
- Action
- Fine
- Status of proceedings
- final
- Sector
- Other
- Culpability
- intentional
- Mitigating circumstances
- The companies have adapted or ceased their activities, and measures have been taken within the group.
- Published
- 10 Mar 2026
- OM: Verzet tegen boetes van 1.125.000 euro voor milieufraude met verontreinigde zandgrond Press release of an authority
- OM: Boetes van in totaal 1.125.000 euro voor milieufraude met verontreinigde grond na intrekken verzet Press release of an authority
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
6 Mar 2026 Fleurette Properties LtdCommodities holding Fleurette: 25.8 million EUR strafbeschikking over bribery in Congo €25.8m
According to the Dutch Public Prosecution Service (OM), the top holding company of a mining, oil and gold group, which was based in the Netherlands from 2010 to 2017, participated together with others in bribing public officials of the DR Congo in order to obtain licences for cobalt and copper mines. On 6 March 2026, the OM issued a strafbeschikking (prosecutorial penalty order) imposing a fine of 25.8 million EUR, which Fleurette accepted.
In the commodities sector, licences and concessions are the main target for bribery – holding companies share liability for payments made by their subsidiaries.
Award of licences in the commodities sector, payments to public officials
- Authority / court
- Openbaar Ministerie (OM); Ermittlungen FIOD Anti-Corruptie Centrum
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Buitenlandse ambtelijke omkoping (Wetboek van Strafrecht); OM-strafbeschikking
- Action
- Fine
- Status of proceedings
- final
- Sector
- Steel and metals
- Culpability
- intentional
- Published
- 10 Mar 2026
- Geldboete Fleurette Properties Ltd wegens omkoping in Congo Press release of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
18 Feb 2026 Périphériques et Matériels de Contrôle SAS (Groupe Carrus)Betting terminal manufacturer PMC: CJIP over payments to an official in Mali €499,150
From 2008 to 2011, the Paris-based supplier of betting and gaming terminals made unjustified payments of 78,972 EUR to an official of a majority state-owned company in Mali, with which it had a supply contract awarded without a tender. The case was triggered by a report from TRACFIN (the French financial intelligence unit). Public interest fine of 499,150 EUR (including 335,000 EUR already seized) and a three-year AFA compliance programme.
Managers of state-controlled companies are also public officials – even small private payments to them create a risk of criminal liability for medium-sized companies.
Payments to heads of state-owned companies abroad
- Authority / court
- Parquet national financier (PNF); Validierung durch den Präsidenten des Tribunal judiciaire de Paris
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale (CJIP); Bestechung ausländischer Amtsträger und Geldwäsche
- Action
- Fine
- Status of proceedings
- final
- Sector
- Telecoms, IT and software
- Employees
- 50 to 249
- Culpability
- intentional
- Liability of senior managers
- The CJIP does not address the criminal liability of natural persons.
- Published
- 18 Feb 2026
- Communiqué de presse du procureur de la République financier – CJIP PMC Press release of an authority
- Convention judiciaire d'intérêt public – Périphériques et Matériels de Contrôle SAS Decision of an authority
- Ministère de la Justice: Conventions judiciaires d'intérêt public (Verzeichnis) Official register or notice
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
10 Feb 2026 Strukton Civiel Projecten B.V. und Strukton International B.V. (Strukton-Gruppe)Construction group Strukton pays 10 million EUR out-of-court settlement over bribery on the Riyadh Metro €10m
To secure a share in the Riyadh Metro project, around 31 million USD was paid between 2013 and 2021 to an agent representing a high-ranking member of the Saudi royal family; the agent payments were understated to the export credit insurer Atradius. Strukton accepted a transaction (out-of-court settlement) of 10 million EUR.
Commissions to agents with ties to ruling families carry the highest risk – and false statements to export credit insurers constitute a second offence.
Agent commissions and false statements to export credit insurers
- Authority / court
- Openbaar Ministerie (OM)
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Buitenlandse ambtelijke omkoping und valsheid in geschrift (Wetboek van Strafrecht); Transactie nach Art. 74 Sr
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Culpability
- intentional
- Mitigating circumstances
- Cooperation from mid-2023; compliance programme in place since 2017; the employees involved are no longer with the company.
- Published
- 30 Mar 2026
- Strukton betaalt hoge transactie van 10 miljoen euro na corruptieonderzoek Press release of an authority
- OM Functioneel Parket: Transactieovereenkomst Calisto (10.02.2026) Decision of an authority
- College van procureurs-generaal: Beslissing hoge transactie onderzoek Calisto (09.02.2026) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
4 Dec 2025 Eurowings GmbHDüsseldorf Higher Regional Court bans misleading Eurowings CO2 offsetting claims Order
On appeal by the Verbraucherzentrale Bundesverband (Federation of German Consumer Organisations), the Oberlandesgericht Düsseldorf (Düsseldorf Higher Regional Court) prohibited Eurowings from advertising a €9 CO2 offset during online booking in a way that makes customers believe they travel climate-neutrally; it was not mentioned that other climate-damaging emissions are not offset. By contrast, the court did not consider the 'Sustainable Aviation Fuel' advertising misleading; it did not grant leave to appeal on points of law.
Anyone selling CO2 offsets must point out that only part of the climate impact is offset, even if each individual statement is correct.
CO2 offsetting and climate neutrality in customer communication
- Authority / court
- Oberlandesgericht Düsseldorf, 20. Zivilsenat
- Area of law
- Environment and sustainability · Misleading environmental and sustainability claims
- Legal basis
- UWG (irreführende Werbung); Az. I-20 U 38/25
- Action
- Order
- Status of proceedings
- unknown
- Sector
- Transport, logistics and shipping
- Published
- 5 Dec 2025
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
6 Nov 2025 Braathens International Airways ABBraathens International Airways: SEK 142.8m for emission allowances not surrendered €13m
The Naturvårdsverket (Swedish Environmental Protection Agency) imposed a penalty of 142,757,565 SEK on the airline Braathens International Airways because it had not surrendered emission allowances for 99,707 tonnes of CO2 equivalent from 2024 by the deadline of 30 September 2025. The inflation-adjusted penalty amounts to 129.69 EUR per tonne (12,930,939 EUR) and does not release the company from the obligation to surrender allowances; the company had been declared bankrupt on 30 September 2025. A separate penalty was imposed on its sister company Braathens Regional Airways AB.
Surrendering emission allowances is a hard deadline without exceptions; even in a crisis it must be secured in liquidity planning.
Timely surrender of emission allowances under the EU Emissions Trading System
- Authority / court
- Naturvårdsverket
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- 10 kap. 5 § förordningen (2020:1180) om vissa utsläpp av växthusgaser; 16 § 3 lagen om vissa utsläpp av växthusgaser; Art. 12 Abs. 3 Richtlinie 2003/87/EG (EU-Emissionshandel)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Transport, logistics and shipping
- Mitigating circumstances
- None: EU rules allow no exception from the surrender obligation regardless of the company's financial situation.
- Published
- 10 Nov 2025
Original amount 142,757,565 SEK, converted at the ECB reference rate of 6 Nov 2025.
- Naturvårdsverket: Sanktionsavgifter för två flygbolag inom Braathens-koncernen (10.11.2025) Press release of an authority
- Naturvårdsverket, Beschluss NV-25-044709 vom 06.11.2025 – Braathens International Airways AB Decision of an authority
Checked against the official source on 28 Sep 2026 · Direct link
Report an error
23 Oct 2025 TotalEnergies; TotalEnergies Electricité et Gaz de FranceParis Judicial Court: TotalEnergies advertising on climate neutrality misleading Order
In an action brought by Greenpeace France, Les Amis de la Terre and Notre Affaire à Tous, the Paris Judicial Court (Tribunal judiciaire de Paris, 34th chamber) found that TotalEnergies had advertised on totalenergies.fr with the goal of ‘carbon neutrality by 2050’ and its role as a player in the energy transition without disclosing that oil and gas production continues to be expanded – a misleading commercial practice. The court ordered the communication to cease, damages to be paid to the associations and the operative part of the judgment to be published on the website (RG 22/02955); claims relating to gas and agrofuels were dismissed.
Net-zero targets may only be advertised to consumers with reference to the actual business strategy.
Climate targets in consumer communication
- Authority / court
- Tribunal judiciaire de Paris (34. Kammer)
- Area of law
- Environment and sustainability · Misleading environmental and sustainability claims
- Legal basis
- Art. L121-1 ff. Code de la consommation (Umsetzung der Richtlinie 2005/29/EG)
- Action
- Order
- Status of proceedings
- unknown
- Sector
- Energy and utilities
- Employees
- 10,000 or more
- Published
- 23 Oct 2025
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
3 Sep 2025 SURYS SAS (Gruppe Imprimerie Nationale)Hologram manufacturer SURYS: CJIP of 18.4 million EUR in the Ukrainian passport case €18.4m
From 2013, SURYS supplied security holograms for Ukrainian passports to the state-owned company Polygraph via an interposed Estonian company; the investigation (following a request for mutual legal assistance from Ukraine's National Anti-Corruption Bureau, NABU) concerned misappropriation of public funds, bribery of foreign public officials and money laundering. Public interest fine of 18,363,007 EUR, plus 3,770,000 EUR in damages to the Ukrainian state and a three-year AFA compliance programme.
If a state customer insists on an interposed trader without any discernible added value, treat this as a red flag for misappropriation and bribery.
Interposed trading companies and sales agents
- Authority / court
- Parquet national financier (PNF); Validierung durch den Präsidenten des Tribunal judiciaire de Paris
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale (CJIP); Bestechung ausländischer Amtsträger, Geldwäsche
- Action
- Fine
- Status of proceedings
- final
- Sector
- Other
- Employees
- 250 to 999
- Culpability
- intentional
- Liability of senior managers
- The CJIP does not address the criminal liability of natural persons.
- Published
- 3 Sep 2025
- Communiqué de presse du procureur de la République financier – CJIP SURYS Press release of an authority
- Convention judiciaire d'intérêt public – SURYS (08.07.2025) Decision of an authority
- Ministère de la Justice: Conventions judiciaires d'intérêt public (Verzeichnis) Official register or notice
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
26 Aug 2025 Acqua Minerale San Benedetto S.p.A.AGCM: San Benedetto removes ‘CO2 neutral’ claim on Ecogreen bottles Other
Labels, the website and commercials for the Ecogreen line claimed that bottle production caused no greenhouse gas emissions and even had a positive effect on the environment. Following an intervention by Italy's competition and consumer protection authority (Autorità Garante della Concorrenza e del Mercato, AGCM) (moral suasion, case PS12596), the mineral water producer removed the claim ‘impatto zero CO2’ in mid-July 2025, revised nature motifs and added a QR code linking to sustainability information.
‘Zero emissions’ promises on packaging can hardly be substantiated; it is better to present specific reduction steps transparently.
Climate claims on packaging
- Authority / court
- Autorità Garante della Concorrenza e del Mercato (AGCM)
- Area of law
- Environment and sustainability · Misleading environmental and sustainability claims
- Legal basis
- Codice del Consumo (unlautere Geschäftspraktiken), Verfahren PS12596
- Action
- Other
- Status of proceedings
- final
- Sector
- Food and agriculture
- Mitigating circumstances
- Voluntary amendment of all labels and advertising materials following the authority's intervention.
- Published
- 26 Aug 2025
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
4 Aug 2025 Infinite Styles Services Co. Ltd (Shein)AGCM: 1 million EUR fine against Shein for misleading environmental claims €1m
Italy's competition and consumer protection authority (Autorità Garante della Concorrenza e del Mercato, AGCM) objected to vague and in part false claims about circular design and recyclability, about the ‘green’ evoluSHEIN collection (only a small share of the range) and about emission targets, while emissions rose in 2023/2024. The ultra-fast-fashion model is subject to a heightened duty of care, the authority held; it imposed 1 million EUR (case PS12709).
Communicate climate targets and recycling promises only if they are specific, substantiated and consistent with actual developments.
Verifiable sustainability communication in online retail
- Authority / court
- Autorità Garante della Concorrenza e del Mercato (AGCM)
- Area of law
- Environment and sustainability · Misleading environmental and sustainability claims
- Legal basis
- Codice del Consumo (unlautere Geschäftspraktiken), Verfahren PS12709
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Retail and e-commerce
- Employees
- 10,000 or more
- Published
- 4 Aug 2025
- PS12709 - Italian Competition Authority: 1 million euros fine imposed on Shein for misleading and omissive green claims Press release of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
27 Jun 2025 IDEMIA France (vormals Oberthur Technologies)Paris prosecutor: CJIP with IDEMIA France for €15.54m over foreign bribery €15.5m
IDEMIA France, formerly Oberthur Technologies, undertook to pay a public interest fine of 15,541,130 EUR in a CJIP (convention judiciaire d'intérêt public, French deferred prosecution agreement) with the Paris public prosecutor. The investigation opened in 2013, including for bribery of foreign public officials and money laundering, concerned contracts between the Angolan central bank (BNA) and Oberthur Technologies from its former banknote business; validation took place on 27 June 2025.
Contracts with state bodies such as central banks require particularly careful scrutiny of intermediaries and payment flows.
Bribery risks in contracts with state central banks
- Authority / court
- Parquet de Paris (Procureure de la République); Validierung durch das Tribunal judiciaire de Paris
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale (corruption d'agent public étranger, blanchiment)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Manufacturing and mechanical engineering
- Published
- 27 Jun 2025
- Communiqué de presse de la Procureure de la République de Paris, 27 juin 2025 (CJIP IDEMIA France) Press release of an authority
- Ministère de la Justice: Liste der Conventions judiciaires d'intérêt public Official register or notice
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
19 Jun 2025 Exclusive Networks Corporate SASIT distributor Exclusive Networks: CJIP of 16 million EUR following a whistleblower report €16.1m
In 2021, a whistleblower reported payments by subsidiaries in Indonesia, Malaysia, Vietnam, Thailand and India to contractual partners; the investigation concerned private-sector bribery and bribery of foreign public officials. The CJIP provides for a public interest fine of 16,074,511 EUR (including 1 million EUR already seized) and a three-year AFA compliance programme.
A functioning whistleblowing system uncovers foreign risks – companies should investigate reports themselves before the authorities do.
Payments to sales partners in Asia, whistleblowing systems
- Authority / court
- Parquet national financier (PNF); Validierung durch das Tribunal judiciaire de Paris
- Area of law
- Bribery and corruption · Commercial bribery
- Legal basis
- Art. 41-1-2 Code de procédure pénale (CJIP); Bestechung im privaten Sektor und ausländischer Amtsträger
- Action
- Fine
- Status of proceedings
- final
- Sector
- Telecoms, IT and software
- Employees
- 1,000 to 9,999
- Culpability
- intentional
- Liability of senior managers
- The CJIP does not address the criminal liability of natural persons.
- Published
- 19 Jun 2025
- Communiqué de presse du procureur de la République financier – CJIP Exclusive Networks Corporate Press release of an authority
- CJIP société Exclusive Networks Corporate (16.06.2025) Decision of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
27 Mar 2025 Aurivo Dairy Ingredients LimitedAurivo Dairy Ingredients: EUR 200,000 in fines for odour and wastewater offences €200,000
The company pleaded guilty to repeatedly breaching conditions of its industrial emissions licence at its Ballaghaderreen plant in 2022: odour nuisance, exceedance of limits for effluent and cooling water, impairment of the River Lung and late incident notifications to the EPA and Inland Fisheries Ireland. The court imposed fines totalling €200,000 for the two notification breaches and additionally ordered €150,000 to be paid over ten years to local community groups and Inland Fisheries Ireland for the river , plus investigation costs. Only the fines of EUR 200,000 are recorded as the amount.
Environmental incidents must be reported to the authority immediately through the prescribed channels; here it was the late notifications that proved most costly.
- Authority / court
- Sligo Circuit Criminal Court (Anklage: Director of Public Prosecutions nach Ermittlungen der Environmental Protection Agency)
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- Bedingungen 5.1, 5.3, 11.3 und 11.5 der Industrieemissionsgenehmigung P0802-03
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Food and agriculture
- Published
- 27 Mar 2025
- EPA: DPP Prosecutes Aurivo Dairy Ingredients Limited (P0802-03) Enforcement database of an authority
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
25 Mar 2025 Adidas (Sportartikelhersteller)Nuremberg-Fürth Regional Court: Adidas may not claim 'climate neutral by 2050' without explanation Other
On an action by a consumer association, the Landgericht Nürnberg-Fürth (Nuremberg-Fürth Regional Court) ordered Adidas to cease the former statement 'By 2050 we will be climate neutral' on its corporate website and to reimburse warning costs. The statement created the impression that the goal would be reached solely through the company's own emission reductions, although green electricity certificates were also to be used; a reference only in the linked annual report was not sufficient. According to the court's press release of 26 March 2025, the judgment was not final; whether an appeal was lodged is not known here.
Climate targets on a corporate website also count as advertising and must disclose there what role offsetting plays.
Climate targets on the corporate website as advertising
- Authority / court
- Landgericht Nürnberg-Fürth
- Area of law
- Environment and sustainability · Misleading environmental and sustainability claims
- Legal basis
- UWG (irreführende Werbung); Az. 3 HK O 6524/24
- Action
- Other
- Status of proceedings
- unknown
- Sector
- Retail and e-commerce
- Employees
- 10,000 or more
- Published
- 26 Mar 2025
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
11 Feb 2025 Paprec GroupPNF: CJIP with Paprec Group for €17.54m after investigation into waste contracts €17.5m
Paprec Group undertook, in a CJIP (convention judiciaire d'intérêt public, French deferred prosecution agreement), to pay a public interest fine of 17,538,990 EUR, including 4,828,000 EUR already seized, and to implement a three-year compliance programme under the supervision of the Agence française anticorruption (French anti-corruption agency) (costs up to 1,000,000 EUR). The background is a judicial investigation including for bribery, favouritism in procurement, money laundering and unlawful agreements concerning contracts and concessions of French local authorities for waste treatment; validated on 11 February 2025.
Companies that depend on municipal contracts must systematically review contacts with decision-makers and tender processes for bribery and favouritism risks.
Integrity in municipal contracts and concessions
- Authority / court
- Parquet national financier (PNF); Validierung durch den Präsidenten des Tribunal judiciaire de Paris
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale
- Action
- Fine
- Status of proceedings
- final
- Sector
- Energy and utilities
- Published
- 11 Feb 2025
- Communiqué de presse du Procureur de la République financier, 11 février 2025 (CJIP Paprec Group) Press release of an authority
- Agence française anticorruption: Affaire Paprec group Official register or notice
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
11 Feb 2025 KLUBB France SASVehicle body builder KLUBB France: CJIP over an ambulance contract in Algeria €558,024
Following a referral from the public prosecutor's office in Rennes, the PNF investigated bribery of foreign public officials in the performance of a contract for the supply of ambulances to Algeria. KLUBB France is paying a public interest fine of 558,024 EUR and is undergoing a three-year AFA compliance programme.
Medium-sized exporters are also in the spotlight: companies supplying foreign authorities need a robust anti-corruption programme under Sapin II (the French anti-corruption law).
Export contracts with state bodies
- Authority / court
- Parquet national financier (PNF); Validierung durch den Präsidenten des Tribunal judiciaire de Paris
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale (CJIP); Bestechung ausländischer Amtsträger
- Action
- Fine
- Status of proceedings
- final
- Sector
- Manufacturing and mechanical engineering
- Employees
- 50 to 249
- Culpability
- intentional
- Liability of senior managers
- The CJIP does not address the criminal liability of natural persons.
- Published
- 11 Feb 2025
- Communiqué de presse du procureur de la République financier – CJIP KLUBB France Press release of an authority
- CJIP KLUBB France SAS (10.02.2025) Decision of an authority
Checked against the official source on 25 Sep 2026 · Direct link