Compliance Radar
Who was sanctioned, and for what?
Fines, court rulings and incidents from Europe, North America, Latin America, Asia-Pacific, Middle East and Africa: 2,229 cases from 44 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.
Click a bar to drill down one level.
Where?
by regionAll jurisdictions
What for?
by area of lawWho?
by company- Anonymised companies €34.4m 46 % · 6 cases
- Colas Rail Asia Sdn Bhd (Colas-Gruppe) €29.7m 40 % · 1 case
- Strukton Civiel Projecten B.V. und Strukton International B.V. (Strukton-Gruppe) €10m 13 % · 1 case
- BDW Trading (Barratt Redrow) €234,153 0 % · 1 case
- BAM International B.V. €30,000 0 % · 1 case
- Chevalier (Construction) Company Limited €8,683 0 % · 1 case
- China Harbour Engineering Company Limited €8,584 0 % · 1 case
When?
per year, by date of decision| Period | Cases | Total |
|---|---|---|
| 2022 | 1 | €7.21m |
| 2023 | 5 | €27.2m |
| 2024 | 1 | €30,000 |
| 2025 | 0 | – |
| 2026 | 5 | €40m |
12 cases
3 Sep 2026 BDW Trading (Barratt Redrow)Barratt Redrow subsidiary BDW pays 201,500 GBP to environmental projects after silt entered brooks €234,153
At the Ladden Garden Village construction site in Yate, a subcontractor washed silt from the site drainage into two brooks over six days in July 2022. The Environment Agency accepted an Enforcement Undertaking: BDW is paying 201,500 GBP to three environmental and charitable projects, bears the investigation costs and had already invested over 180,000 GBP in remediation, training and improved surface water management. According to the annual accounts filed with the UK companies register for financial year 2025, the company had around 5,217 employees.
Developers are liable for environmental damage caused by their subcontractors; clear procedures and training on handling surface water prevent costly proceedings.
Protecting watercourses on construction sites and managing subcontractors
Missing or inadequate training played a role in the decision.
- Authority / court
- Environment Agency
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- Environmental Civil Sanctions (England) Order 2010 (Enforcement Undertaking)
- Action
- Other
- Status of proceedings
- final
- Sector
- Construction and real estate
- Employees
- 1,000 to 9,999
- Mitigating circumstances
- Acceptance of responsibility, remediation, training of employees and application for a discharge permit.
- Published
- 3 Sep 2026
Original amount 201,500 GBP, converted at the ECB reference rate of 3 Sep 2026.
- Builder pays £201,500 to charities after silting watercourses Press release of an authority
- Companies House: Registereintrag BDW Trading Limited (03018173) Official register or notice
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
22 May 2026 China Harbour Engineering Company LimitedChina Harbour Engineering: 78,000 HKD for discharge into water control zone €8,584
In April 2026 China Harbour Engineering Company Limited was fined 78,000 HKD at the Eastern Magistrates' Courts (a Hong Kong magistrates' court) under the Water Pollution Control Ordinance (Hong Kong's water pollution law) because the company had discharged waste or polluting matter into a water control zone on 14 July 2025; the prosecution was brought by the Environmental Protection Department (Hong Kong's environmental authority). It was the highest fine among the 40 environmental convictions the department published for April 2026.
Discharges into waters must be authorised in advance and monitored continuously – a single incident is enough for a criminal conviction in Hong Kong.
Water protection and authorised discharges
- Authority / court
- Eastern Magistrates' Courts, Hongkong (Anklage: Environmental Protection Department)
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- Water Pollution Control Ordinance (Einleitung von Abfall oder verunreinigenden Stoffen in eine water control zone)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 22 May 2026
Original amount 78,000 HKD, converted at the ECB reference rate of 22 May 2026.
- Environmental Protection Department: EPD convictions in April (2026) – Liste der Verurteilungen Enforcement database of an authority
- HKSAR Government (EPD): EPD convictions in April (22.05.2026) Press release of an authority
- Environmental Protection Department: EPD convictions in April Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
19 Mar 2026 Colas Rail Asia Sdn Bhd (Colas-Gruppe)Colas Rail Asia: CJIP of 29.7 million EUR over bribery in metro contracts in Malaysia €29.7m
The Malaysian subsidiary of Colas Rail paid large, undocumented sums via intermediaries in connection with public contracts for urban rail lines in Kuala Lumpur (Kelana Jaya extension, MRT2). Following an internal investigation, Colas Rail self-reported the matter in 2017; the CJIP (Convention judiciaire d'intérêt public, a French deferred prosecution agreement) provides for a public interest fine of 29,745,974 EUR and a three-year compliance programme monitored by the French Anti-Corruption Agency (AFA) (costs of up to 1.9 million EUR).
Undocumented payments to intermediaries on foreign projects must be stopped early by the finance and compliance functions – self-reporting after an internal investigation is rewarded.
Intermediaries and consultants in public tenders
- Authority / court
- Parquet national financier (PNF); Validierung durch den Präsidenten des Tribunal judiciaire de Paris
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale (CJIP); Bestechung ausländischer Amtsträger
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Employees
- 10,000 or more
- Culpability
- intentional
- Mitigating circumstances
- Self-report (criminal complaint filed by Colas Rail on 31 May 2017) following an internal forensic investigation.
- Liability of senior managers
- The CJIP does not address the criminal liability of natural persons.
- Published
- 19 Mar 2026
- Communiqué de presse du procureur de la République financier – CJIP COLAS RAIL ASIA Press release of an authority
- Convention judiciaire d'intérêt public – COLAS RAIL ASIA (17.03.2026) Decision of an authority
- Ministère de la Justice: Conventions judiciaires d'intérêt public (Verzeichnis) Official register or notice
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
23 Feb 2026 Chevalier (Construction) Company LimitedHong Kong: HKD 80,000 fine for Chevalier (Construction) for breaching a noise permit €8,683
Chevalier (Construction) was fined HKD 80,000 in January 2026 because on 23 February 2025 the company carried out prescribed construction work in breach of the conditions of its construction noise permit. It was the heaviest single fine among the 34 convictions reported by the Environmental Protection Department for January 2026.
A noise permit only protects a site as long as its conditions on hours and equipment are actually observed.
Complying with noise permit conditions on construction sites
- Authority / court
- Kwun Tong Magistrates' Courts, Hongkong (Anklage: Environmental Protection Department)
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- Noise Control Ordinance (Bauarbeiten entgegen den Bedingungen einer Construction Noise Permit)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 23 Feb 2026
Original amount 80,000 HKD, converted at the ECB reference rate of 23 Feb 2026.
- EPD convictions in January 2026 (Liste der Verurteilungen) Enforcement database of an authority
- EPD convictions in January (23 February 2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
10 Feb 2026 Strukton Civiel Projecten B.V. und Strukton International B.V. (Strukton-Gruppe)Construction group Strukton pays 10 million EUR out-of-court settlement over bribery on the Riyadh Metro €10m
To secure a share in the Riyadh Metro project, around 31 million USD was paid between 2013 and 2021 to an agent representing a high-ranking member of the Saudi royal family; the agent payments were understated to the export credit insurer Atradius. Strukton accepted a transaction (out-of-court settlement) of 10 million EUR.
Commissions to agents with ties to ruling families carry the highest risk – and false statements to export credit insurers constitute a second offence.
Agent commissions and false statements to export credit insurers
- Authority / court
- Openbaar Ministerie (OM)
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Buitenlandse ambtelijke omkoping und valsheid in geschrift (Wetboek van Strafrecht); Transactie nach Art. 74 Sr
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Culpability
- intentional
- Mitigating circumstances
- Cooperation from mid-2023; compliance programme in place since 2017; the employees involved are no longer with the company.
- Published
- 30 Mar 2026
- Strukton betaalt hoge transactie van 10 miljoen euro na corruptieonderzoek Press release of an authority
- OM Functioneel Parket: Transactieovereenkomst Calisto (10.02.2026) Decision of an authority
- College van procureurs-generaal: Beslissing hoge transactie onderzoek Calisto (09.02.2026) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
17 Dec 2024 BAM International B.V.OM: penalty order for BAM International over misrecorded facilitation payments €30,000
The Openbaar Ministerie (OM, Dutch Public Prosecution Service) imposed a penalty order of 30,000 EUR on BAM International B.V. for forgery (valsheid in geschrift): on a completed project in Africa, so-called facilitation payments had been made to officials in connection with a tax dispute, and not all of them were recorded transparently in the accounts. The company had discovered the payments in its own investigation and reported them itself; the amount reflects the OM guideline on self-reporting, cooperation and internal investigation. The OM dropped separate proceedings for bribery of public officials on other projects for lack of evidence.
Even tolerated small payments to officials must be recorded completely and transparently; self-reporting and own investigation reduce the penalty.
Facilitation payments and transparent bookkeeping
- Authority / court
- Openbaar Ministerie (OM), Functioneel Parket
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Valsheid in geschrift (Urkundenfälschung nach niederländischem Strafrecht); Strafbefehl des OM
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Mitigating circumstances
- Self-reporting, own investigation and cooperation with the investigation.
- Published
- 17 Dec 2024
- OM: Strafbeschikking en sepot in onderzoek naar BAM International B.V. Press release of an authority
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
4 Dec 2023 a French engineering and design firmPNF: CJIP with an engineering firm for €14.6m over suspected foreign bribery €14.6m
The engineering firm undertook to pay a public interest fine of 14,600,000 EUR under a CJIP (convention judiciaire d'intérêt public, French deferred prosecution agreement) concluded on 29 November 2023 and validated on 4 December 2023. The investigation, including for bribery of foreign public officials, stemmed from a criminal complaint through which the company itself had passed audit reports and an anonymous letter to the judicial authorities in 2013.
Internal audit findings and anonymous tip-offs about bribery should be investigated immediately; self-reporting does not, however, rule out a later sanction.
Handling internal indications of bribery, and self-reporting
- Authority / court
- Parquet national financier (PNF); gerichtliche Validierung
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale (corruption d'agent public étranger)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 4 Dec 2023
- Ministère de la Justice, Conventions judiciaires d'intérêt public (Übersicht) (Entscheidung 2023) Enforcement database of an authority
Checked against the official source on 14 Oct 2026 · Version 2 · Company name anonymised since 4 Dec 2025 · Direct link
Report an error
17 Oct 2023 four New Zealand property development and engineering companiesNew Zealand housing development: 93,625 NZD for sediment discharges into a stream €52,220
At a housing development in the Wellington region, earthworks were not stabilised in winter 2020 contrary to the consent conditions, an abatement notice from Greater Wellington (the regional council) was ignored, and sediment repeatedly entered a stream, a habitat of at-risk native fish species, until March 2021. On 17 October 2023 the Environment Court in Wellington sentenced the project entity (a limited partnership), the development company and two engineering and consulting firms involved on 22 charges to fines totalling 93,625 NZD.
Consent conditions on sediment control apply even under time pressure – abatement notices must be complied with immediately.
Erosion and sediment control on construction sites
- Authority / court
- Environment Court (Anklage: ein Regionalrat)
- Area of law
- Environment and sustainability · Emissions and permits
- Legal basis
- Natural Resources Plan for the Wellington Region; Auflagen der Ressourcengenehmigung und Abatement Notice
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Mitigating circumstances
- Impact of the COVID lockdown on the stabilisation programme; reductions for early guilty pleas.
- Published
- 13 Nov 2023
Original amount 93,625 NZD, converted at the ECB reference rate of 17 Oct 2023.
- Environment Court (Anklage: ein Regionalrat), Veröffentlichung der Behörde (Entscheidung 2023) Decision of an authority
Checked against the official source on 14 Oct 2026 · Company name anonymised since 17 Oct 2025 · Direct link
Report an error
16 Oct 2023 a US real estate subsidiary of a Chinese groupUS real estate company: USD 1m fine for bribing a city department head €948,947
The Californian subsidiary of a Chinese property group was sentenced to a fine of USD 1 million after its guilty plea of 17 August 2023 and must implement an anti-corruption programme for three years. Executives had paid for the then director of the city's Department of Public Works, among other things, food, drinks, lodging and transport on a trip to China in 2018 in order to obtain city approvals for a construction project in a major Californian city.
Travel and hospitality for officials who decide on one's own projects must be avoided without exception – abroad as well.
Travel and hospitality for officials deciding on one's own projects
- Authority / court
- U.S. District Court (Anklage: U.S. Attorney's Office)
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Verschwörung zu Honest Services Wire Fraud und Honest Services Wire Fraud (je ein Anklagepunkt)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Culpability
- intentional
- Liability of senior managers
- Measures against individuals are not set out here.
- Published
- 16 Oct 2023
Original amount 1,000,000 USD, converted at the ECB reference rate of 16 Oct 2023.
Checked against the official source on 14 Oct 2026 · Company name anonymised since 16 Oct 2025 · Direct link
Report an error
17 May 2023 a French construction company and a property developer of the same construction groupPNF: CJIP with a construction company and a property developer for €7.96m €7.96m
The two companies of a French construction group undertook, in a CJIP (convention judiciaire d'intérêt public, French deferred prosecution agreement), to pay a public interest fine totalling allegedly 7,964,000 EUR and to implement a three-year compliance programme under the supervision of the Agence française anticorruption (French anti-corruption agency), the costs of which the construction company bears up to 1,337,000 EUR. The investigation opened in 2021 concerned, among other things, favouritism in public procurement (favoritisme) and active and passive bribery of public officials; validated on 17 May 2023.
Contacts with public contracting authorities during tender procedures must be clearly regulated and documented to avoid allegations of favouritism.
Bribery and favouritism in public construction contracts
- Authority / court
- Parquet national financier (PNF); gerichtliche Validierung
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale (favoritisme, corruption d'agent public)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 17 May 2023
- Ministère de la Justice, Conventions judiciaires d'intérêt public (Übersicht) (Entscheidung 2023) Enforcement database of an authority
Checked against the official source on 14 Oct 2026 · Version 2 · Company name anonymised since 17 May 2025 · Direct link
Report an error
12 May 2023 a US real estate companyUS real estate company: USD 4m fine for bribing a city councilman €3.67m
Following a jury verdict in November 2022, the federal court sentenced the Californian real estate company to a fine of USD 4 million, the statutory maximum, and five years' probation. From 2013 to 2018 it had, through its owner, provided a then city councilman of its city who chaired the planning committee with benefits worth more than USD 1 million – including cash, casino chips, flights, luxury hotels and USD 600,000 in collateral – to advance approval of a 77-storey tower replacing its hotel.
Benefits for officials deciding on one's own permits are off limits – if they flow through owners or third parties, the company is still liable.
Benefits to public officials in planning and permit procedures
- Authority / court
- U.S. District Court (Anklage: U.S. Attorney's Office)
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Honest Services Wire Fraud (3 Fälle), Reisen zur Förderung von Bestechung (Travel Act, 4 Fälle), Bestechung (1 Fall)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Culpability
- intentional
- Liability of senior managers
- Measures against individuals are not set out here.
- Published
- 12 May 2023
Original amount 4,000,000 USD, converted at the ECB reference rate of 12 May 2023.
Checked against the official source on 14 Oct 2026 · Company name anonymised since 12 May 2025 · Direct link
Report an error
11 Oct 2022 a Brazilian engineering and construction companyEngineering company: BRL 36.4m and debarment over collusion on a nuclear plant project €7.21m
The CGU imposed on a Brazilian engineering and construction company a fine of BRL 36,363,406.20, extraordinary publication of the decision and a declaration of unfitness for public contracts until rehabilitation. The basis was the frustration of competition in a state-owned nuclear power operator's tenders for the electromechanical assembly of a nuclear power plant through agreements with competitors (Art. 5 IV Lei 12.846/2013); the Minister considered the bribery allegation (Art. 5 I) insufficiently proven. The CGU rejected the request for reconsideration on 8 April 2024.
In Brazil, price and lot-sharing agreements in public tenders are also punished under the Anti-Corruption Act – with a fine and exclusion from contracts.
Price and lot-sharing agreements in public tenders
- Authority / court
- Controladoria-Geral da União (CGU)
- Area of law
- Bribery and corruption
- Legal basis
- Lei 12.846/2013, Art. 5 IV, Art. 6 I und II; Lei 8.666/1993, Art. 87 IV i. V. m. Art. 88 III; Decreto 8.420/2015
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 14 Oct 2022
Original amount 36,363,406.2 BRL, converted at the ECB reference rate of 11 Oct 2022.
- Controladoria-Geral da União (CGU), Veröffentlichung der Behörde (Entscheidung 2022) Decision of an authority
Checked against the official source on 7 Oct 2026 · Company name anonymised since 11 Oct 2024 · Direct link