Compliance Radar
Who was sanctioned, and for what?
Fines, court rulings and incidents from Europe, North America, Latin America, Asia-Pacific, Middle East and Africa: 2,229 cases from 44 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.
Click a bar to drill down one level.
Where?
by regionAll jurisdictions
- EU €263.2m 55 % · 25 cases
- United Kingdom €184.3m 38 % · 10 cases
- Brazil €11.7m 2 % · 3 cases
- Singapore €10.3m 2 % · 2 cases
- USA €5.7m 1 % · 7 cases
- Switzerland €5.37m 1 % · 3 cases
- Canada €661,764 0 % · 3 cases
- New Zealand €292,765 0 % · 2 cases
- Australia €218,607 0 % · 2 cases
- Hong Kong €206,185 0 % · 3 cases
- 1 more€2,596
What for?
by area of lawWho?
by company- Anonymised companies €217.7m 45 % · 21 cases
- Barratt Redrow, Persimmon, Taylor Wimpey u. a. (7 Wohnungsbauunternehmen) €113.6m 24 % · 1 case
- AS Asphaltstraßensanierung GmbH, BITUNOVA GmbH, Kutter Spezialstraßenbau GmbH & Co. KG, Possehl Construction GmbH (inkl. VSI), Liesen…alles für den Bau GmbH, OAT GmbH/Otto Alte-Teigeler GmbH €60.3m 13 % · 1 case
- Colas Rail Asia Sdn Bhd (Colas-Gruppe) €29.7m 6 % · 1 case
- AS Asphaltstraßensanierung, BITUNOVA, Mainka u. a. (Straßenerhaltungskartell, 7 Unternehmen) €10.5m 2 % · 1 case
- Strukton Civiel Projecten B.V. und Strukton International B.V. (Strukton-Gruppe) €10m 2 % · 1 case
- Decora S.A., Bel-Pol sp. z o.o. €7.9m 2 % · 1 case
- Tarkus Interiors Pte Ltd; Flex Connect Pte Ltd (vormals Facility Link Pte Ltd) €7.09m 1 % · 1 case
- Retta Isännöinti Oy (Retta-Gruppe), Oulun Kiinteistötieto Oy, REIM Group Oy Ltd u. a. (Verband und 11 Gesellschaften) €6.56m 1 % · 1 case
- ATE, s. r. o.; AŽD Praha s.r.o.; EPLcond a.s.; MONZAS, a.s.; První SaZ Plzeň a.s.; STARMON s.r.o. €6.39m 1 % · 1 case
- 30 more€12m
When?
per year, by date of decision| Period | Cases | Total |
|---|---|---|
| 2022 | 5 | €37.2m |
| 2023 | 10 | €95.2m |
| 2024 | 9 | €92.6m |
| 2025 | 14 | €142.7m |
| 2026 | 23 | €114.3m |
61 cases
24 Sep 2026 M&J GroupCMA: fine against construction firm for concealing evidence during an inspection €29,075
During an inspection as part of an investigation into bid rigging, a work mobile phone and documents were removed from the premises on the instructions of a manager, and possession of a work mobile phone was denied. The UK Competition and Markets Authority (CMA) imposed a fine of 25,000 GBP on M&J.
Dawn raid training is mandatory: removing mobile phones or documents during an inspection obstructs the investigation, even when acting on instructions.
Correct conduct during inspections (dawn raids), no removal of evidence
- Authority / court
- Competition and Markets Authority (CMA)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Section 40A(1) Competition Act 1998
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Culpability
- intentional
- Liability of senior managers
- Measures against individuals are not reported here.
- Published
- 24 Sep 2026
Original amount 25,000 GBP, converted at the ECB reference rate of 24 Sep 2026.
- CMA, Pressemitteilung zu M&J Group (Entscheidung 2025) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
22 Sep 2026 Carioca Christiani-Nielsen Engenharia S.A.Carioca Engenharia pays 6.13 million BRL in CADE settlement on construction tenders €1.04m
Carioca Christiani-Nielsen Engenharia S.A. concluded a single settlement (Termo de Compromisso de Cessação) with the Conselho Administrativo de Defesa Econômica (CADE, Brazilian competition authority) covering four proceedings concerning alleged collusion in public tenders for infrastructure projects (metro, airports operated by Infraero, the rail company CPTM and the transport authority DNIT). The company admitted its participation, allegedly pays 6,134,676.92 BRL in instalments to the Fund for Diffuse Rights (FDD) and waives court and administrative disputes on these matters. Together with the company’s earlier settlements with CADE, its contributions exceed 90 million BRL.
A settlement covering all pending cartel cases creates legal certainty but requires an admission, payment and full cooperation.
Bid rigging in public construction contracts
- Authority / court
- Conselho Administrativo de Defesa Econômica (CADE)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Lei nº 12.529/2011 (Lei de Defesa da Concorrência), Termo de Compromisso de Cessação
- Action
- Other
- Status of proceedings
- final
- Sector
- Construction and real estate
- Published
- 22 Sep 2026
Original amount 6,134,676.92 BRL, converted at the ECB reference rate of 22 Sep 2026.
- CADE – Cade celebra acordo com construtora em quatro investigações de cartel (22.09.2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
16 Sep 2026 Hillbeck Homes (Sowerby Bridge) LtdDeveloper pays £300,000 after agency worker falls through unprotected stairwell opening €349,895
A 24-year-old labourer working as a temporary worker for a scaffolding company fell, in his second week of work on the developer's housing site, through a stairwell opening that was neither securely covered nor guarded, dropping one storey onto concrete and suffering serious spinal injuries. The court found the company guilty on three counts because it had neither adequately planned nor supervised work at height and had not taken suitable measures to prevent falls. Fine of £300,000 plus costs. The company is a micro-enterprise with fewer than 10 employees.
Floor openings on construction sites must be covered with load-bearing covers or guarded at all times – new and temporary workers in particular do not know where the hazards are.
Fall protection at openings; induction of new workers
- Authority / court
- Leeds Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Work at Height Regulations 2005
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Employees
- Under 50
- Published
- 21 Sep 2026
Original amount 300,000 GBP, converted at the ECB reference rate of 16 Sep 2026.
- Construction company fined after 24-year-old father falls through unprotected stairwell opening (HSE) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
4 Sep 2026 In Construction LimitedHong Kong: HKD 640,000 fine for In Construction after fatal crane accident €70,237
In Construction was fined HKD 640,000 for breaches of the Factories and Industrial Undertakings Ordinance and the regulations on lifting appliances and safety management. On a foundation construction site in Tai Po on 30 September 2025, a female worker had been trapped between the rear end of a slewing crawler crane and the railing of a steel platform and later died.
A crane's slewing zone must be cordoned off, especially on confined platforms where railings create a crushing point.
Securing the danger zone of slewing cranes
- Authority / court
- Shatin Magistrates' Courts, Hongkong (Anklage: Labour Department)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Factories and Industrial Undertakings Ordinance; Factories and Industrial Undertakings (Lifting Appliances and Lifting Gear) Regulations; Factories and Industrial Undertakings (Safety Management) Regulation
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 4 Sep 2026
Original amount 640,000 HKD, converted at the ECB reference rate of 4 Sep 2026.
- Contractor fined for violation of safety legislation (4 September 2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
20 Aug 2026 Grace Motors Limited (Grace Construction)Grace Construction: 38,500 NZD for working at height despite a prohibition notice €19,586
At a site for two-storey residential units in Kelston (Auckland), workers were working on the upper floor without adequate fall protection, and the site also had temporary platforms, partially removed scaffolding and unsecured ladders; WorkSafe (New Zealand's workplace health and safety regulator) therefore prohibited work at height on the second floor by a prohibition notice on 30 August 2024. Because work continued there on 2 and 4 September 2024 nonetheless, the Waitakere District Court imposed a fine of 38,500 NZD on 20 August 2026, plus costs of 1,099.10 NZD.
A prohibition notice means an immediate stop to the work – site management must actively enforce it until the risk has demonstrably been remedied.
Fall protection and compliance with regulatory stop-work orders
- Authority / court
- Waitakere District Court (Anklage: WorkSafe New Zealand)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Health and Safety at Work Act 2015, s 107(1), (2)(b)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Liability of senior managers
- The prohibition notice had been issued to one of the directors.
- Published
- 4 Sep 2026
Original amount 38,500 NZD, converted at the ECB reference rate of 20 Aug 2026.
- WorkSafe New Zealand: Company falls short after ignoring WorkSafe notice (04.09.2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
19 Aug 2026 Sioux Erosion Control Inc.DOJ: jury convicts erosion control firm of price fixing in Oklahoma road construction –
A jury found Sioux Erosion Control guilty of having fixed prices for erosion control services, allocated contracts regionally and rigged bids on publicly funded road construction projects in Oklahoma (more than 100 million USD) from 2017 to 2023. Sentencing was still pending; the decision is not final.
Subcontractors in public road construction are also targeted by prosecutors.
Price-fixing and territorial agreements for subcontracted services in road construction
- Authority / court
- U.S. Department of Justice, Antitrust Division
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Section 1 Sherman Act
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Liability of senior managers
- Measures against individuals are not reported here.
- Published
- 20 Aug 2026
- U.S. Department of Justice, Pressemitteilung zu Sioux Erosion Control (Entscheidung 2026) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Direct link
Report an error
13 Aug 2026 „О-Рент“ ЕООД (sowie „Инжконсулт“ ЕООД und „Земекоп“ ЕООД)Construction machinery cartel: fine for O-Rent, compliance programme for all participants €2,403
The Комисия за защита на конкуренцията (Bulgarian Commission for the Protection of Competition, KZK) found a cartel in public tenders for mining and construction machinery (price fixing and market sharing, Art. 15 ZZK – Bulgarian Protection of Competition Act, Art. 101 TFEU). Inzhkonsult and Zemekop, as a single undertaking, were exempted from the fine; O-Rent received a sanction of 2,403.07 EUR. All three companies must introduce a competition law compliance programme within 60 days and report on it.
The authority now expressly requires compliance programmes – anyone bidding in tenders should have one before it is ordered.
Competition law in tenders; compliance programme
- Authority / court
- Комисия за защита на конкуренцията (КЗК, Bulgarische Wettbewerbskommission)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Art. 15 Abs. 1 Nr. 1 und 2 ZZK; Art. 101 Abs. 1 lit. a und c AEUV
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Mitigating circumstances
- Immunity from fines for two participants (leniency programme)
- Published
- 20 Aug 2026
- КЗК Публичен електронен регистър – Производство (Решение № 797 от 13.08.2026; Volltext als PDF im Register) Official register or notice
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
6 Aug 2026 AS Asphaltstraßensanierung GmbH, BITUNOVA GmbH, Kutter Spezialstraßenbau GmbH & Co. KG, Possehl Construction GmbH (inkl. VSI), Liesen…alles für den Bau GmbH, OAT GmbH/Otto Alte-Teigeler GmbHBundeskartellamt: 60.3 million EUR against DSK road repair cartel €60.3m
From around 2010 to September 2019, six suppliers of thin cold-laid asphalt surface layers (Dünne Asphaltdeckschichten in Kaltbauweise, DSK) allocated customers – primarily public contracting authorities – and contracts among themselves nationwide and coordinated prices. Germany's Federal Cartel Office (Bundeskartellamt) imposed fines of around 60.3 million EUR; all proceedings ended in settlements.
Anyone who "shares out" public contracts regionally risks fines running into millions – calculations and bids must always be prepared independently.
Customer allocation and bid rigging in public contracts
- Authority / court
- Bundeskartellamt
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- § 1 GWB, Art. 101 AEUV
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Mitigating circumstances
- Leniency bonus for Possehl/VSI, Bitunova, Kutter and AS; settlement
- Published
- 6 Aug 2026
- Bußgelder wegen Kartellabsprachen im Bereich Straßenreparatur mit DSK Press release of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
31 Jul 2026 Whitemountain Quarries Limited€1.2m fine for Whitemountain Quarries after fatal roadworks incident €1.2m
At roadworks on the R238 in Donegal in August 2020, one wheel of a car dropped onto the unfinished hard shoulder; when the driver steered back, the car slid on the freshly laid surface and went into Lough Foyle; three occupants drowned and one was injured, and appropriate temporary traffic management was lacking. The company pleaded guilty to breaching its duties towards non-employees under s. 12 of the Safety, Health and Welfare at Work Act 2005 and was fined €1,200,000.
Employers at roadworks in public spaces are also liable for the safety of third parties; signage and guidance measures must remain adequate until the works are finished.
- Authority / court
- Letterkenny Circuit Criminal Court (Anklage: Health and Safety Authority)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- s. 12 i. V. m. s. 77(9)(a) Safety, Health and Welfare at Work Act 2005
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 31 Jul 2026
- HSA: Whitemountain Quarries Limited fined €1.2 million after fatal roadworks incident claimed three lives (31.07.2026) Press release of an authority
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
23 Jul 2026 Orchids Builders LLCFlorida roofer: OSHA proposes $349,754 over allegedly repeated lack of fall protection €307,017
According to the U.S. Occupational Safety and Health Administration (OSHA), inspectors found on 21 January and 10 March 2026 at two residential construction sites in Rockledge that employees of the roofing contractor were working on roofs without fall protection; training records, eye protection when using nail guns and ladders extending sufficiently above the roof edge were also missing. The company had been inspected seven times since 2023, each time with citations for fall protection. OSHA proposed penalties of $349,754 (2 violations classified as wilful, 4 as repeat); the violations are alleged and may be contested.
Companies that allow the same fall hazards to recur after earlier inspections risk classification as a repeat or wilful violation with substantially higher penalties.
Fall protection during roofing work
Missing or inadequate training played a role in the decision.
- Authority / court
- U.S. Department of Labor – Occupational Safety and Health Administration (OSHA)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- 29 CFR 1926 Subpart M (Fall Protection), Subpart X (Ladders)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Culpability
- intentional
- Repeat case
- yes
- Published
- 23 Jul 2026
Original amount 349,754 USD, converted at the ECB reference rate of 23 Jul 2026.
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
21 Jul 2026 Dragon Alfa Cement LimitedCement plant with 12 employees: 1 million GBP after fatal accident at unguarded machinery €1.17m
In 2021 a 35-year-old employee was crushed by a 1.6-tonne concrete weight at the cement bagging plant in Sharpness. A large section of the perimeter fencing had routinely been removed over a prolonged period, leaving dangerous moving parts freely accessible. The company – with 12 employees according to its 2024 annual accounts – was fined 1 million GBP plus 9,621 GBP in costs.
Treat removed guard fencing as a management failure and stop it – tolerating permanently open danger zones can lead to fines in the millions, even for a small business.
- Authority / court
- Bristol Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 2(1) Health and Safety at Work etc. Act 1974
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Employees
- Under 50
- Published
- 21 Jul 2026
Original amount 1,000,000 GBP, converted at the ECB reference rate of 21 Jul 2026.
- Cement company fined £1,000,000 after father crushed by 1.6 tonne concrete weight (HSE) Press release of an authority
- Companies House: Registereintrag Dragon Alfa Cement Limited (03473666) Official register or notice
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
16 Jun 2026 SCS Railways (Joint Venture von Skanska Construction UK Limited, Costain Limited und Strabag AG)HS2 joint venture SCS Railways: £400,000 fine after tipper truck fall €462,583
SCS Railways, a joint venture of Skanska, Costain and Strabag on the HS2 rail project, was fined £400,000 and ordered to pay £8,974 in costs. On 27 July 2021 at the Copthall North site near Uxbridge, a 20-tonne tipper truck belonging to a contracted haulage company fell from an excavation ramp and the driver was injured. The Health and Safety Executive found neither signage nor edge protection on the vehicle routes; a traffic route changed on the morning of the incident had left an unprotected edge and had been neither properly planned nor communicated in time.
Every short-notice change to site vehicle routes needs a risk check and immediate briefing of all drivers.
Traffic routes and change management on major construction sites
- Authority / court
- Uxbridge Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 3(1) Health and Safety at Work etc. Act 1974
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Mitigating circumstances
- Guilty plea.
- Published
- 26 Jun 2026
Original amount 400,000 GBP, converted at the ECB reference rate of 16 Jun 2026.
- HSE: HS2 contractor fined £400,000 after tipper truck driver injured (26.06.2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
28 May 2026 Timmerhuis Weg & Waterbouw B.V., Bouwhuis Aannemingsmaatschappij „Bouwmij“ B.V., Aannemingsmaatschappij Van Gelder B.V.ACM: cartel fines on construction firms for bid rigging in an Ommen tender €45,500
In September 2024 three construction companies coordinated their bid prices and decided the winner in a civil engineering tender of the municipality of Ommen, which was awarded for 153,250 EUR. Because of earlier cartel infringements by the companies or their legal predecessors established in 2005, the ACM (Autoriteit Consument & Markt, Dutch competition and consumer authority) increased the fines by 20%. In the simplified procedure it imposed allegedly 30,000 EUR on Timmerhuis and allegedly 15,500 EUR on Bouwhuis (45,500 EUR in total); Van Gelder, as first leniency applicant, was not fined.
Bids in procurement procedures must be prepared independently; even agreeing the winner of a small municipal contract is sanctioned.
Bid rigging in public tenders
- Authority / court
- Autoriteit Consument & Markt (ACM)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Art. 6 Abs. 1 Mededingingswet
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Repeat case
- yes
- Mitigating circumstances
- For cooperating in the simplified procedure, the ACM reduced the fines of Bouwhuis and Timmerhuis by 15%, and that of Timmerhuis by a further 5% for evidence provided voluntarily; Van Gelder, as first applicant, received full leniency immunity.
- Published
- 2 Jun 2026
- ACM – Boetebesluit vervalsing GWW-aanbesteding (Beslisdatum 28-05-2026) Decision of an authority
- ACM – Boetebesluit vervalsing GWW-aanbesteding gemeente Ommen Decision of an authority
- ACM – ACM legt kartelboetes op voor vervalsing GWW-aanbesteding (02-06-2026) Press release of an authority
Checked against the official source on 4 Oct 2026 · Direct link
Report an error
4 May 2026 Decora S.A., Bel-Pol sp. z o.o.Decora and Bel-Pol: PLN 33.6m for price and territory agreements on flooring accessories €7.9m
The manufacturer Decora and the wholesaler Bel-Pol had coordinated prices for vinyl panels, underlays, skirting boards and floor profiles from Decora's range and divided the wholesale market for these products. UOKiK imposed fines of PLN 28,344,000 on Decora and PLN 5,290,000 on Bel-Pol, PLN 33,634,000 in total. The decision is not final.
Vertical agreements on prices and territories in wholesale are hardcore restrictions.
Price and territory agreements between manufacturer and wholesaler
- Authority / court
- Prezes Urzędu Ochrony Konkurencji i Konsumentów (UOKiK)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Art. 6 Abs. 1 Nr. 1 und 3 ustawa o ochronie konkurencji i konsumentów; Art. 101 Abs. 1 lit. a und c AEUV; Art. 106 Abs. 1 Nr. 1 und 2, Art. 113c und Art. 89a ustawa o ochronie konkurencji i konsumentów
- Action
- Fine
- Status of proceedings
- under appeal
- Sector
- Construction and real estate
- Mitigating circumstances
- As a leniency applicant, Bel-Pol received a 50% reduction of its fine and a further 10% for voluntarily accepting the fine (settlement).
- Liability of senior managers
- Measures against individuals are not reported here.
Original amount 33,634,000 PLN, converted at the ECB reference rate of 4 May 2026.
- UOKiK-Entscheidungsdatenbank: Decyzja DOK-2/2026 (Decora S.A., Bel-Pol sp. z o.o.) Enforcement database of an authority
- Decyzja nr DOK-2/2026 vom 04.05.2026 (öffentliche Fassung) Decision of an authority
Checked against the official source on 28 Sep 2026 · Direct link
Report an error
21 Apr 2026 Gwalimba Construction (Pty) LtdAlleged collusion on a government job: Gwalimba Construction allegedly pays ZAR 50,000 €2,596
On 21 April 2026 the Competition Tribunal (South Africa's competition adjudicator) confirmed a settlement with Gwalimba Construction (Pty) Ltd. Following a complaint by the Department of Home Affairs (home affairs ministry), the Competition Commission (competition authority) had found that Gwalimba and Superway Construction (Pty) Ltd agreed not to compete against each other on certain tenders – including a request for quotes for fire-compliance repair work at a government office in Pretoria. Without admitting liability, Gwalimba allegedly pays an administrative penalty of 50,000 ZAR, will cooperate in the case against Superway and will introduce a competition law compliance programme.
Even small construction firms must avoid any coordination with competitors when quoting to public bodies – authorities pursue such arrangements against small firms too.
Bid rigging in public procurement
- Authority / court
- Competition Tribunal of South Africa (auf Antrag der Competition Commission)
- Area of law
- Competition law · Cartels and collusion
- Legal basis
- Section 4(1)(b)(i), (ii) und (iii) Competition Act 89 of 1998
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Repeat case
- no
- Mitigating circumstances
- According to the parties: cooperation with the authority, a small firm with no previous contraventions, and it did not win the contract.
- Published
- 23 Apr 2026
Original amount 50,000 ZAR, converted at the ECB reference rate of 21 Apr 2026.
- Competition Tribunal: Press Release: Tribunal confirms settlement of alleged collusion by Gwalimba Construction in public sector collusive tendering case (23.04.2026) Court press release
- Competition Tribunal, CO107Oct25, Order confirming consent agreement Competition Commission v Gwalimba Construction (Pty) Ltd, decided 21.04.2026 Court decision
- Competition Tribunal case file CO107Oct25 (Order date 2026-04-21; sections 4(1)(b)(i), (ii), (iii)) Official register or notice
Checked against the official source on 4 Oct 2026 · Direct link
Report an error
14 Apr 2026 Sun Shine Decoration Limited, Wai Tat Aluminium & Glass Engineering Company LimitedHong Kong: HKD 730,000 in fines for two contractors after fatal fall €79,028
The court fined Sun Shine Decoration HKD 500,000 and Wai Tat Aluminium & Glass Engineering HKD 230,000, HKD 730,000 in total, for breaches of the Factories and Industrial Undertakings Ordinance and the Construction Sites (Safety) Regulations. The case arose from a fatal accident on 16 May 2025 at a house in Kwu Tung, in which a worker fell into the swimming pool of the neighbouring house while fixing insulation boards on a metal canopy.
Work on roofs and canopies requires fall protection planned in advance, even at residential houses, and every company involved can be held liable for breaches.
Fall protection when working on roofs and canopies
- Authority / court
- Fanling Magistrates' Courts, Hongkong (Anklage: Labour Department)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Factories and Industrial Undertakings Ordinance; Construction Sites (Safety) Regulations
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 14 Apr 2026
Original amount 730,000 HKD, converted at the ECB reference rate of 14 Apr 2026.
- Contractors fined for violation of safety legislation (14 April 2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
19 Mar 2026 Colas Rail Asia Sdn Bhd (Colas-Gruppe)Colas Rail Asia: CJIP of 29.7 million EUR over bribery in metro contracts in Malaysia €29.7m
The Malaysian subsidiary of Colas Rail paid large, undocumented sums via intermediaries in connection with public contracts for urban rail lines in Kuala Lumpur (Kelana Jaya extension, MRT2). Following an internal investigation, Colas Rail self-reported the matter in 2017; the CJIP (Convention judiciaire d'intérêt public, a French deferred prosecution agreement) provides for a public interest fine of 29,745,974 EUR and a three-year compliance programme monitored by the French Anti-Corruption Agency (AFA) (costs of up to 1.9 million EUR).
Undocumented payments to intermediaries on foreign projects must be stopped early by the finance and compliance functions – self-reporting after an internal investigation is rewarded.
Intermediaries and consultants in public tenders
- Authority / court
- Parquet national financier (PNF); Validierung durch den Präsidenten des Tribunal judiciaire de Paris
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale (CJIP); Bestechung ausländischer Amtsträger
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Employees
- 10,000 or more
- Culpability
- intentional
- Mitigating circumstances
- Self-report (criminal complaint filed by Colas Rail on 31 May 2017) following an internal forensic investigation.
- Liability of senior managers
- The CJIP does not address the criminal liability of natural persons.
- Published
- 19 Mar 2026
- Communiqué de presse du procureur de la République financier – CJIP COLAS RAIL ASIA Press release of an authority
- Convention judiciaire d'intérêt public – COLAS RAIL ASIA (17.03.2026) Decision of an authority
- Ministère de la Justice: Conventions judiciaires d'intérêt public (Verzeichnis) Official register or notice
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
10 Feb 2026 Strukton Civiel Projecten B.V. und Strukton International B.V. (Strukton-Gruppe)Construction group Strukton pays 10 million EUR out-of-court settlement over bribery on the Riyadh Metro €10m
To secure a share in the Riyadh Metro project, around 31 million USD was paid between 2013 and 2021 to an agent representing a high-ranking member of the Saudi royal family; the agent payments were understated to the export credit insurer Atradius. Strukton accepted a transaction (out-of-court settlement) of 10 million EUR.
Commissions to agents with ties to ruling families carry the highest risk – and false statements to export credit insurers constitute a second offence.
Agent commissions and false statements to export credit insurers
- Authority / court
- Openbaar Ministerie (OM)
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Buitenlandse ambtelijke omkoping und valsheid in geschrift (Wetboek van Strafrecht); Transactie nach Art. 74 Sr
- Action
- Fine
- Status of proceedings
- final
- Sector
- Construction and real estate
- Culpability
- intentional
- Mitigating circumstances
- Cooperation from mid-2023; compliance programme in place since 2017; the employees involved are no longer with the company.
- Published
- 30 Mar 2026
- Strukton betaalt hoge transactie van 10 miljoen euro na corruptieonderzoek Press release of an authority
- OM Functioneel Parket: Transactieovereenkomst Calisto (10.02.2026) Decision of an authority
- College van procureurs-generaal: Beslissing hoge transactie onderzoek Calisto (09.02.2026) Decision of an authority
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
29 Jan 2026 Tarmac Building Products LimitedTarmac Building Products: 633,300 GBP after worker's legs crushed on production line €731,124
At the Linford plant in 2022 an employee's legs were trapped between metal frames weighing over a tonne because the interlocked access gate did not cut the power to the preceding sections of track. Previous near misses and a risk assessment from years earlier that called for additional control measures were not acted upon; fine of 633,300 GBP plus 5,583 GBP in costs. According to its 2025 annual accounts, the company had an average of 596 employees.
Follow up near misses and outstanding actions from risk assessments – otherwise they prove in court that you knew of the risk.
- Authority / court
- Chelmsford Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 2(1) Health and Safety at Work etc. Act 1974
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Employees
- 250 to 999
- Published
- 30 Jan 2026
Original amount 633,300 GBP, converted at the ECB reference rate of 29 Jan 2026.
- Building materials manufacturer fined over £600,000 after worker suffers life-changing injuries at Tarmac plant (HSE) Press release of an authority
- Companies House: Registereintrag Tarmac Building Products Limited (04026569) Official register or notice
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link
Report an error
27 Jan 2026 Salford Grab Hire LimitedExcavator bucket used as a prop: mechanic seriously injured – 10,000 GBP for grab hire firm €11,517
During the repair of a tipper truck, a JCB bucket without a quick hitch or retaining pin was used to prop up the raised tipper body; the one-tonne bucket fell and seriously injured a mechanic. The business (11 employees according to its micro-entity accounts) had not used suitable props; fine of 10,000 GBP plus 3,475.90 GBP in costs.
Secure raised loads only with props designed for the purpose – improvised supports using work equipment are a typical cause of serious crush injuries.
- Authority / court
- Warrington Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 2(1) Health and Safety at Work etc. Act 1974
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Employees
- Under 50
- Published
- 4 Feb 2026
Original amount 10,000 GBP, converted at the ECB reference rate of 27 Jan 2026.
- Plant hire company fined £10,000 after employee struck by falling JCB bucket (HSE) Press release of an authority
- Companies House: Registereintrag Salford Grab Hire Ltd (10895680) Official register or notice
Checked against the official source on 28 Sep 2026 · Version 2 · Direct link