Compliance Radar
Who was sanctioned, and for what?
Fines, court rulings and incidents from Europe, North America, Latin America, Asia-Pacific and Middle East: 1,907 cases from 40 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.
Click a bar to drill down one level.
Where?
by regionAll jurisdictions
What for?
by topicWho?
by company- Whitemountain Quarries Limited €1.2m 18 % · 1 case
- Dragon Alfa Cement Limited €1.17m 17 % · 1 case
- Lanes Group Limited €917,326 13 % · 1 case
- Tarmac Building Products Limited €731,124 11 % · 1 case
- DME Construction Associates Inc. €506,928 7 % · 1 case
- SCS Railways (Joint Venture von Skanska Construction UK Limited, Costain Limited und Strabag AG) €462,583 7 % · 1 case
- Hillbeck Homes (Sowerby Bridge) Ltd €349,895 5 % · 1 case
- EllisDon Corporation €318,998 5 % · 1 case
- Orchids Builders LLC €307,017 4 % · 1 case
- Anonymised companies €272,982 4 % · 2 cases
- 8 more€594,744
When?
per quarter, by date of decision| Period | Cases | Total |
|---|---|---|
| Q4 2023 | 0 | – |
| Q1 2024 | 0 | – |
| Q2 2024 | 0 | – |
| Q3 2024 | 0 | – |
| Q4 2024 | 0 | – |
| Q1 2025 | 0 | – |
| Q2 2025 | 0 | – |
| Q3 2025 | 0 | – |
| Q4 2025 | 1 | €318,998 |
| Q1 2026 | 0 | – |
| Q2 2026 | 0 | – |
| Q3 2026 | 0 | – |
| Q4 2026 | 0 | – |
1 case
12 Dec 2025 EllisDon CorporationEllisDon: CAD 514,831.53 penalty after fatal crane incident at high-rise site €318,998
In February 2024 a flytable was being moved by tower crane at the Oakridge Park construction site; as it was pushed out it accelerated out of the building, fell and fatally struck a worker. WorkSafeBC found that EllisDon, as prime contractor, had not regularly reviewed the subcontractor's safe work procedures, had not confirmed that a risk assessment had been carried out, had not classed the lift as critical, had not ensured written lift plans, had not controlled the exclusion zone on the ground and had not coordinated the health and safety activities of the employers involved. It imposed an administrative penalty of CAD 514,831.53.
Prime contractors must actively plan, review and coordinate their subcontractors' critical crane lifts rather than relying on their procedures.
Coordinating health and safety and critical lifts on multi-employer construction sites
- Authority / court
- WorkSafeBC (Workers' Compensation Board of British Columbia)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Arbeitsschutzvorschriften von British Columbia, insbesondere Occupational Health and Safety Regulation (OHSR) – Pflichten des Hauptauftragnehmers (prime contractor) und Anforderungen an kritische Kranhübe; Verwaltungsstrafe (administrative penalty) von WorkSafeBC
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Construction and real estate
- Published
- 12 Dec 2025
Original amount 514,831.53 CAD, converted at the ECB reference rate of 12 Dec 2025.