Compliance Radar

Who was sanctioned, and for what?

Fines, court rulings and incidents from Europe, North America, Latin America, Asia-Pacific, Middle East and Africa: 2,229 cases from 44 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.

9cases from 6 jurisdictions
€239.5mTotal of monetary amounts (8 cases with an amount)
€236.1mLargest single case: Adani Enterprises Limited
€501,599Median per case with an amount

Click a bar to drill down one level.

When?

per year, by date of decision
Trend
PeriodCasesTotal
20231€27,000
20242€534,507
20252€637,233
20264€238.3m

9 cases

17 Sep 2026 China Power International Development Limited, Towngas - China Power (HK) Integrated Energy Company Limited, A. Kourage Limited u. a. (4 Unternehmen)Fatal electric shock at Science Park: four companies pay 3,137,250 HKD Hong KongWorkplace safety and accidents €348,309

On 17 September 2026 the Shatin Magistrates' Courts (a Hong Kong magistrates' court), on prosecutions brought by the Labour Department (Hong Kong's labour authority), fined four companies for breaches of the Factories and Industrial Undertakings Regulations, the Factories and Industrial Undertakings (Electricity) Regulations and the Construction Sites (Safety) Regulations (Hong Kong workplace safety rules). The case concerned a fatal accident on 10 September 2023 at Hong Kong Science Park, in which a worker received an electric shock while carrying out electrical work. China Power International Development Limited and Towngas - China Power (HK) Integrated Energy Company Limited pay 908,000 HKD each, A. Kourage Limited 904,250 HKD and Skynet Engineering Company Limited 417,000 HKD, 3,137,250 HKD in total.

What organisations can take from it

In electrical work several companies involved can be criminally liable at the same time – workplace safety must be coordinated among all parties.

Relevance to training and awareness

Electrical safety in installation and construction work

Authority / court
Shatin Magistrates' Courts, Hongkong (Anklage: Labour Department)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Factories and Industrial Undertakings Regulations; Factories and Industrial Undertakings (Electricity) Regulations; Construction Sites (Safety) Regulations
Action
Fine
Status of proceedings
unknown
Sector
Energy and utilities
Published
17 Sep 2026

Original amount 3,137,250 HKD, converted at the ECB reference rate of 17 Sep 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

29 Jun 2026 Petrofac Facilities Management LimitedPetrofac Facilities Management: £569,157 settlement over Russia sanctions breaches United KingdomBreaches of sanctions and embargoes €660,160

The company paid HMRC a compound settlement of £569,157.07 for alleged breaches of the Russia sanctions. According to HMRC, while withdrawing from Russia in 2022/2023 it allegedly made sanctioned industrial goods available on two occasions to a person connected with Russia or for use in Russia, and provided related technical assistance. According to HMRC, this is the first time it has publicly named the company behind such a settlement.

What organisations can take from it

Even when withdrawing from a sanctioned market, the prohibitions on making goods available and on technical assistance apply in full.

Relevance to training and awareness

Sanctions screening of goods supplied and technical assistance when exiting a market

Authority / court
HM Revenue & Customs (HMRC)
Area of law
Sanctions and export control · Breaches of sanctions and embargoes
Legal basis
Reg. 46Y(2)(c) und Reg. 46Z(1)(b) Russia (Sanctions) (EU Exit) Regulations 2019
Action
Fine
Status of proceedings
final
Sector
Energy and utilities
Mitigating circumstances
Voluntary disclosure and full cooperation with HMRC.
Published
29 Jun 2026

Original amount 569,157.07 GBP, converted at the ECB reference rate of 29 Jun 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

12 Jun 2026 Esso Petroleum Company LimitedEsso: £1m fine after LPG release at Fawley refinery United KingdomWorkplace safety and accidents €1.16m

Esso was fined £1m and ordered to pay £12,277 in costs. On 8 November 2022, a corroded steel tower at the Fawley refinery partially collapsed, damaged pipework and released around 2,400 kg of liquefied petroleum gas over 33 hours; workers were exposed to the risk of falling debris and potential burns. According to the Health and Safety Executive's investigation, the corrosion had been known since 2010 without appropriate action being taken.

What organisations can take from it

Known corrosion findings on load-bearing structures must be assessed and remedied promptly, before they lead to a major incident.

Relevance to training and awareness

Asset integrity and handling known corrosion findings

Authority / court
Southampton Magistrates' Court (Anklage: Health and Safety Executive)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Section 3(1) Health and Safety at Work etc. Act 1974
Action
Fine
Status of proceedings
unknown
Sector
Energy and utilities
Mitigating circumstances
Guilty plea; no injuries.
Published
15 Jun 2026

Original amount 1,000,000 GBP, converted at the ECB reference rate of 12 Jun 2026.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

18 May 2026 Adani Enterprises LimitedAdani Enterprises pays 275 million USD over Iranian liquefied petroleum gas USABreaches of sanctions and embargoes €236.1m

From November 2023 to June 2025, the Indian conglomerate bought allegedly Omani and Iraqi liquefied petroleum gas (LPG) via a trader in Dubai which in fact originated from Iran; 32 payments totalling around 192 million USD were routed through US banks. The US Treasury's Office of Foreign Assets Control (OFAC) assessed the violations as egregious and not voluntarily self-disclosed; Adani had recklessly ignored numerous warning signs (AIS manipulation by the tankers, implausible loading ports, conspicuous price discounts, irregularities in the certificates of origin).

What organisations can take from it

Companies that source commodities below market price via intermediaries must actively check origin, vessel movements and documents – mere name screening against sanctions lists is not enough.

Relevance to training and awareness

Warning signs in commodity and shipping transactions (origin, AIS gaps, price discounts)

Authority / court
U.S. Department of the Treasury, Office of Foreign Assets Control (OFAC)
Area of law
Sanctions and export control · Breaches of sanctions and embargoes
Legal basis
Iranian Transactions and Sanctions Regulations (31 C.F.R. part 560); IEEPA
Action
Fine
Status of proceedings
final
Sector
Energy and utilities
Mitigating circumstances
Remedial measures after discovery and cooperation with OFAC
Published
18 May 2026

Original amount 275,000,000 USD, converted at the ECB reference rate of 18 May 2026.

Checked against the official source on 25 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

25 Nov 2025 Shell UK LimitedShell UK: £560,000 fine after hydrocarbon release on Brent Charlie United KingdomWorkplace safety and accidents €637,233

Shell UK pleaded guilty to two charges under the offshore fire and explosion regulations (PFEER 1995) and was fined £560,000. On 19 May 2017, around 200 kg of gas and 1,550 kg of crude oil escaped into a concrete leg of the Brent Charlie platform from corroded pipework that had originally been installed only temporarily; the ventilation systems had also been inadequately maintained. More than 170 people on board were exposed to a potential fire and explosion risk.

What organisations can take from it

Temporary installations need a fixed removal date and, until then, their own inspection regime.

Relevance to training and awareness

Management of change for temporary pipework

Authority / court
Aberdeen Sheriff Court (Ermittlung: Health and Safety Executive)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations 1995 (PFEER), zwei Anklagepunkte
Action
Fine
Status of proceedings
final
Sector
Energy and utilities
Mitigating circumstances
Guilty plea; the court set the fine after taking mitigating factors into account.
Published
28 Nov 2025

Original amount 560,000 GBP, converted at the ECB reference rate of 25 Nov 2025.

Checked against the official source on 3 Oct 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

20 Jun 2025 EquinorEquinor: Havtil order after health symptoms during work at Hammerfest LNG NorwayWorkplace safety and accidents Order

Havindustritilsynet (Havtil, Norwegian Ocean Industry Authority) ordered Equinor to ensure and document that work in area L201 of the Hammerfest LNG plant is fully prudent before it resumes, including specialist analyses of exposure conditions at the work site. The order followed three incidents between June 2024 and June 2025 in the Snøhvit Future project in which workers developed symptoms – after the first, 17 people went to an emergency clinic; the authority considered Equinor's own criteria for resuming work to be insufficient.

What organisations can take from it

After repeated health incidents, work should only resume once exposure conditions have been analysed by specialists and the findings are also applied by the contractors involved.

Relevance to training and awareness

Workplace exposure and safe resumption of work

Authority / court
Havindustritilsynet (Havtil)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
§ 69 i. V. m. § 10 rammeforskriften; §§ 11, 16 und 18 styringsforskriften
Action
Order
Status of proceedings
unknown
Sector
Energy and utilities
Employees
10,000 or more
Published
20 Jun 2025

Checked against the official source on 28 Sep 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

22 Nov 2024 a British biogas plant operatorBiogas plant: tank explodes during angle grinding; 304,500 GBP after joint HSE/EA prosecution United KingdomWorkplace safety and accidentsanonymised €365,964

In 2017 two employees were cutting pipes with an angle grinder on top of an eleven-metre-high slurry tank without fall protection; sparks ignited gases, the tank exploded and both were seriously injured. There was no safe tank design, no risk assessments, no permit-to-work procedures, no training and no supervision, and the operator also breached its environmental permit; fines totalling 304,500 GBP plus 229,988 GBP in costs.

What organisations can take from it

Carry out hot work on plant containing flammable gases only with a permit to work, gas testing and fall protection; having a permit on paper does not protect against liability.

Relevance to training and awareness

Hot work and permit-to-work procedures in explosive atmospheres

Missing or inadequate training played a role in the decision.

Authority / court
Nottingham Crown Court (Anklage: Environment Agency und Health and Safety Executive)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Section 2(1) und 3(1) Health and Safety at Work etc. Act 1974; Regulation 38(2) Environmental Permitting Regulations 2016; Section 33(1)(c) Environmental Protection Act 1990
Action
Fine
Status of proceedings
unknown
Sector
Energy and utilities
Employees
Under 50
Published
28 Nov 2024

Original amount 304,500 GBP, converted at the ECB reference rate of 22 Nov 2024.

Checked against the official source on 28 Sep 2026 · Version 3 · Company name anonymised since 22 Nov 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

19 Nov 2024 an electricity grid operator in OntarioGrid operator: CA$250,000 after contact with a live line Canada, ONWorkplace safety and accidentsanonymised €168,543

While copper conductors were being installed on a de-energised 44 kV line, a piece of conductor touched the uncovered 4.8 kV line running below it; a worker was seriously injured. The grid operator had not complied with the safety rules for work near energised equipment. Fine of CA$250,000 against the company (19 November 2024).

What organisations can take from it

De-energising alone is not enough; adjacent lines that remain live must be covered.

Relevance to training and awareness

Covering adjacent live parts

Authority / court
Provincial Offences Court Goderich (Ermittlung: Ontario Ministry of Labour, Immigration, Training and Skills Development)
Area of law
Health and safety and employment law · Workplace safety and accidents
Legal basis
Sections 181, 183 O. Reg. 213/91 (Construction Projects) i. V. m. s. 132 Electrical Utility Safety Rules; ss. 27(1)(a), 25(1)(c) Occupational Health and Safety Act (Ontario)
Action
Fine
Status of proceedings
final
Sector
Energy and utilities
Mitigating circumstances
Guilty plea.
Liability of senior managers
Measures against individuals are not reported here.
Published
15 Jan 2025

Original amount 250,000 CAD, converted at the ECB reference rate of 19 Nov 2024.

Checked against the official source on 28 Sep 2026 · Version 3 · Company name anonymised since 19 Nov 2026 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

13 Oct 2023 a Dutch offshore construction companyNetherlands: EUR 27,000 fine on an offshore construction company as project crew worked up to 27 days in a row NetherlandsWorking timeanonymised €27,000

The Dutch Minister of Social Affairs and Employment fined a Dutch company whose activities include building and maintaining offshore wind farms EUR 27,000: according to the findings of the mining regulator Staatstoezicht op de Mijnen (Dutch State Supervision of Mines), twelve members of a project crew working on the construction of an offshore wind farm had worked on more than 14 consecutive days between 23 November and 20 December 2022; eleven of them for 20 days and one for 27 days in a row. The company argued without success that the working time rules for seafarers applied to the crew, which worked mainly on a crane vessel; the competent court dismissed its appeal on 20 November 2025.

What organisations can take from it

For offshore work, the nature of the work determines which working time rules apply: anyone working for a wind farm is subject to the stricter offshore rules, even if the crew works mainly on board a ship.

Relevance to training and awareness

Maximum number of consecutive working days in offshore work

Authority / court
Minister van Sociale Zaken en Werkgelegenheid (Bußgeld; Aufsicht: Staatstoezicht op de Mijnen); bestätigt durch Rechtbank Rotterdam
Area of law
Health and safety and employment law · Working time
Legal basis
Arbeidstijdenwet; Art. 5.14:2 Abs. 3 i. V. m. Art. 5.17:2 Arbeidstijdenbesluit (Arbeit auf, von oder für einen Windpark auf See)
Action
Fine
Status of proceedings
unknown
Sector
Energy and utilities
Published
1 Dec 2025

Checked against the official source on 2 Oct 2026 · Company name anonymised since 13 Oct 2025 · Direct link

Report an error

Anonymous: we store only your text, no contact details and no IP address.

Ready for training that actually lands?

Try the combination for free: automated administration for you, learning formats that fit your team, with no minimum or credit card.

Start 14-day free trial