Compliance Radar
Who was sanctioned, and for what?
Fines, court rulings and incidents from Europe, North America, Latin America, Asia-Pacific, Middle East and Africa: 2,229 cases from 44 jurisdictions, each with an official source and checked against that source before publication. Filter by country, area of law and sector. Click a chart to drill down one level.
Click a bar to drill down one level.
Where?
by regionAll jurisdictions
What for?
by area of lawWho?
by company- Anonymised companies €707.1m 60 % · 7 cases
- Adani Enterprises Limited €236.1m 20 % · 1 case
- Trafigura Beheer B.V. €213.2m 18 % · 2 cases
- Paprec Group €17.5m 1 % · 1 case
- Esso Petroleum Company Limited €1.16m 0 % · 1 case
- Petrofac Facilities Management Limited €660,160 0 % · 1 case
- Shell UK Limited €637,233 0 % · 1 case
- China Power International Development Limited, Towngas - China Power (HK) Integrated Energy Company Limited, A. Kourage Limited u. a. (4 Unternehmen) €348,309 0 % · 1 case
- Equinor – 0 % · 1 case
When?
per year, by date of decision| Period | Cases | Total |
|---|---|---|
| 2022 | 1 | €316.9m |
| 2023 | 3 | €299.2m |
| 2024 | 3 | €91m |
| 2025 | 5 | €231.4m |
| 2026 | 4 | €238.3m |
16 cases
17 Sep 2026 China Power International Development Limited, Towngas - China Power (HK) Integrated Energy Company Limited, A. Kourage Limited u. a. (4 Unternehmen)Fatal electric shock at Science Park: four companies pay 3,137,250 HKD €348,309
On 17 September 2026 the Shatin Magistrates' Courts (a Hong Kong magistrates' court), on prosecutions brought by the Labour Department (Hong Kong's labour authority), fined four companies for breaches of the Factories and Industrial Undertakings Regulations, the Factories and Industrial Undertakings (Electricity) Regulations and the Construction Sites (Safety) Regulations (Hong Kong workplace safety rules). The case concerned a fatal accident on 10 September 2023 at Hong Kong Science Park, in which a worker received an electric shock while carrying out electrical work. China Power International Development Limited and Towngas - China Power (HK) Integrated Energy Company Limited pay 908,000 HKD each, A. Kourage Limited 904,250 HKD and Skynet Engineering Company Limited 417,000 HKD, 3,137,250 HKD in total.
In electrical work several companies involved can be criminally liable at the same time – workplace safety must be coordinated among all parties.
Electrical safety in installation and construction work
- Authority / court
- Shatin Magistrates' Courts, Hongkong (Anklage: Labour Department)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Factories and Industrial Undertakings Regulations; Factories and Industrial Undertakings (Electricity) Regulations; Construction Sites (Safety) Regulations
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Energy and utilities
- Published
- 17 Sep 2026
Original amount 3,137,250 HKD, converted at the ECB reference rate of 17 Sep 2026.
- HKSAR Government (Labour Department): Contractors fined for violation of safety legislation (17.09.2026) Press release of an authority
- Labour Department: Press Releases (Liste) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
29 Jun 2026 Petrofac Facilities Management LimitedPetrofac Facilities Management: £569,157 settlement over Russia sanctions breaches €660,160
The company paid HMRC a compound settlement of £569,157.07 for alleged breaches of the Russia sanctions. According to HMRC, while withdrawing from Russia in 2022/2023 it allegedly made sanctioned industrial goods available on two occasions to a person connected with Russia or for use in Russia, and provided related technical assistance. According to HMRC, this is the first time it has publicly named the company behind such a settlement.
Even when withdrawing from a sanctioned market, the prohibitions on making goods available and on technical assistance apply in full.
Sanctions screening of goods supplied and technical assistance when exiting a market
- Authority / court
- HM Revenue & Customs (HMRC)
- Area of law
- Sanctions and export control · Breaches of sanctions and embargoes
- Legal basis
- Reg. 46Y(2)(c) und Reg. 46Z(1)(b) Russia (Sanctions) (EU Exit) Regulations 2019
- Action
- Fine
- Status of proceedings
- final
- Sector
- Energy and utilities
- Mitigating circumstances
- Voluntary disclosure and full cooperation with HMRC.
- Published
- 29 Jun 2026
Original amount 569,157.07 GBP, converted at the ECB reference rate of 29 Jun 2026.
- HMRC/DBT/ECJU: Notice to exporters 2026/15: firm named after Russia sanctions breach settlement (29.06.2026) Official register or notice
- GOV.UK: Sanctions enforcement action – HMRC enforcement notices (Juni 2026) Enforcement database of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
12 Jun 2026 Esso Petroleum Company LimitedEsso: £1m fine after LPG release at Fawley refinery €1.16m
Esso was fined £1m and ordered to pay £12,277 in costs. On 8 November 2022, a corroded steel tower at the Fawley refinery partially collapsed, damaged pipework and released around 2,400 kg of liquefied petroleum gas over 33 hours; workers were exposed to the risk of falling debris and potential burns. According to the Health and Safety Executive's investigation, the corrosion had been known since 2010 without appropriate action being taken.
Known corrosion findings on load-bearing structures must be assessed and remedied promptly, before they lead to a major incident.
Asset integrity and handling known corrosion findings
- Authority / court
- Southampton Magistrates' Court (Anklage: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 3(1) Health and Safety at Work etc. Act 1974
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Energy and utilities
- Mitigating circumstances
- Guilty plea; no injuries.
- Published
- 15 Jun 2026
Original amount 1,000,000 GBP, converted at the ECB reference rate of 12 Jun 2026.
- HSE: Esso fined £1 million after major gas leak at Fawley refinery (15.06.2026) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
18 May 2026 Adani Enterprises LimitedAdani Enterprises pays 275 million USD over Iranian liquefied petroleum gas €236.1m
From November 2023 to June 2025, the Indian conglomerate bought allegedly Omani and Iraqi liquefied petroleum gas (LPG) via a trader in Dubai which in fact originated from Iran; 32 payments totalling around 192 million USD were routed through US banks. The US Treasury's Office of Foreign Assets Control (OFAC) assessed the violations as egregious and not voluntarily self-disclosed; Adani had recklessly ignored numerous warning signs (AIS manipulation by the tankers, implausible loading ports, conspicuous price discounts, irregularities in the certificates of origin).
Companies that source commodities below market price via intermediaries must actively check origin, vessel movements and documents – mere name screening against sanctions lists is not enough.
Warning signs in commodity and shipping transactions (origin, AIS gaps, price discounts)
- Authority / court
- U.S. Department of the Treasury, Office of Foreign Assets Control (OFAC)
- Area of law
- Sanctions and export control · Breaches of sanctions and embargoes
- Legal basis
- Iranian Transactions and Sanctions Regulations (31 C.F.R. part 560); IEEPA
- Action
- Fine
- Status of proceedings
- final
- Sector
- Energy and utilities
- Mitigating circumstances
- Remedial measures after discovery and cooperation with OFAC
- Published
- 18 May 2026
Original amount 275,000,000 USD, converted at the ECB reference rate of 18 May 2026.
- OFAC Enforcement Release: Adani Enterprises Limited Settles with OFAC for $275,000,000 (18.05.2026) Decision of an authority
- OFAC – Civil Penalties and Enforcement Information Enforcement database of an authority
Checked against the official source on 25 Sep 2026 · Direct link
Report an error
25 Nov 2025 Shell UK LimitedShell UK: £560,000 fine after hydrocarbon release on Brent Charlie €637,233
Shell UK pleaded guilty to two charges under the offshore fire and explosion regulations (PFEER 1995) and was fined £560,000. On 19 May 2017, around 200 kg of gas and 1,550 kg of crude oil escaped into a concrete leg of the Brent Charlie platform from corroded pipework that had originally been installed only temporarily; the ventilation systems had also been inadequately maintained. More than 170 people on board were exposed to a potential fire and explosion risk.
Temporary installations need a fixed removal date and, until then, their own inspection regime.
Management of change for temporary pipework
- Authority / court
- Aberdeen Sheriff Court (Ermittlung: Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations 1995 (PFEER), zwei Anklagepunkte
- Action
- Fine
- Status of proceedings
- final
- Sector
- Energy and utilities
- Mitigating circumstances
- Guilty plea; the court set the fine after taking mitigating factors into account.
- Published
- 28 Nov 2025
Original amount 560,000 GBP, converted at the ECB reference rate of 25 Nov 2025.
- HSE: Shell UK fined £560,000 following major hydrocarbon release (28.11.2025) Press release of an authority
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
20 Jun 2025 EquinorEquinor: Havtil order after health symptoms during work at Hammerfest LNG Order
Havindustritilsynet (Havtil, Norwegian Ocean Industry Authority) ordered Equinor to ensure and document that work in area L201 of the Hammerfest LNG plant is fully prudent before it resumes, including specialist analyses of exposure conditions at the work site. The order followed three incidents between June 2024 and June 2025 in the Snøhvit Future project in which workers developed symptoms – after the first, 17 people went to an emergency clinic; the authority considered Equinor's own criteria for resuming work to be insufficient.
After repeated health incidents, work should only resume once exposure conditions have been analysed by specialists and the findings are also applied by the contractors involved.
Workplace exposure and safe resumption of work
- Authority / court
- Havindustritilsynet (Havtil)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- § 69 i. V. m. § 10 rammeforskriften; §§ 11, 16 und 18 styringsforskriften
- Action
- Order
- Status of proceedings
- unknown
- Sector
- Energy and utilities
- Employees
- 10,000 or more
- Published
- 20 Jun 2025
- Havtil: Pålegg til Equinor – Hammerfest LNG – sikre og dokumentere forsvarlighet før gjenopptakelse av arbeid (20.06.2025) Press release of an authority
- Havtil: Order to Equinor – Hammerfest LNG – ensure and document prudence of activities before resumption of work (25.06.2025) Press release of an authority
Checked against the official source on 28 Sep 2026 · Direct link
Report an error
28 Mar 2025 Trafigura Beheer B.V.Trafigura Beheer: leniency agreement with CGU and AGU for BRL 435.4m €69.9m
Trafigura Beheer B.V. entered into a leniency agreement with the Controladoria-Geral da União (CGU, Office of the Comptroller General) and the Advocacia-Geral da União (AGU, Office of the Attorney General) in which it admitted paying undue advantages to public officials and using front persons to conceal its interests. It allegedly pays BRL 435,410,672.26: BRL 153,710,689.11 within ten days (the conversion of USD 26,829,346; under its agreement with the US Department of Justice on a fine of USD 80,488,040, this part of the US fine may be offset by the payment to the Brazilian authorities) and BRL 281,699,983.15 (the conversion of USD 49,169,165.53) as the remaining balance. The amount and the facts have not been confirmed against the primary source.
In corruption cases involving several countries, double payments can be avoided through coordinated agreements with all the authorities involved.
Payments to public officials and use of intermediaries
- Authority / court
- Controladoria-Geral da União (CGU) und Advocacia-Geral da União (AGU)
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Lei nº 12.846/2013, Art. 5 I und III, Art. 16; Lei nº 8.429/1992; Decreto nº 11.129/2022
- Action
- Fine
- Status of proceedings
- final
- Sector
- Energy and utilities
- Mitigating circumstances
- Coordination with the US proceedings so that part of the Brazilian payment can be credited against the US fine; obligation to improve the integrity programme under CGU monitoring for 36 months.
Original amount 435,410,672.26 BRL, converted at the ECB reference rate of 28 Mar 2025.
- Acordo de Leniência CGU/AGU – Trafigura Beheer B.V. (Processo 00190.100002/2022-21, SEI 3569333) Decision of an authority
- CGU: Acordos de leniência celebrados (Liste mit Unternehmen und Beträgen) Official register or notice
Checked against the official source on 3 Oct 2026 · Direct link
Report an error
11 Feb 2025 Paprec GroupPNF: CJIP with Paprec Group for €17.54m after investigation into waste contracts €17.5m
Paprec Group undertook, in a CJIP (convention judiciaire d'intérêt public, French deferred prosecution agreement), to pay a public interest fine of 17,538,990 EUR, including 4,828,000 EUR already seized, and to implement a three-year compliance programme under the supervision of the Agence française anticorruption (French anti-corruption agency) (costs up to 1,000,000 EUR). The background is a judicial investigation including for bribery, favouritism in procurement, money laundering and unlawful agreements concerning contracts and concessions of French local authorities for waste treatment; validated on 11 February 2025.
Companies that depend on municipal contracts must systematically review contacts with decision-makers and tender processes for bribery and favouritism risks.
Integrity in municipal contracts and concessions
- Authority / court
- Parquet national financier (PNF); Validierung durch den Präsidenten des Tribunal judiciaire de Paris
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale
- Action
- Fine
- Status of proceedings
- final
- Sector
- Energy and utilities
- Published
- 11 Feb 2025
- Communiqué de presse du Procureur de la République financier, 11 février 2025 (CJIP Paprec Group) Press release of an authority
- Agence française anticorruption: Affaire Paprec group Official register or notice
Checked against the official source on 2 Oct 2026 · Direct link
Report an error
31 Jan 2025 Trafigura Beheer B.V.Swiss Federal Criminal Court (Bundesstrafgericht) convicts Trafigura of bribery in Angola €143.3m
Between 2009 and 2011, more than 4 million EUR and more than 600,000 USD were paid to an official in Angola in order to promote ship chartering and bunkering business of the Trafigura group. The court convicted the then parent company for lacking rules on the supervision of intermediaries, imposing a fine of 3 million CHF and a compensatory claim (Ersatzforderung) of 145,634,268 USD (amount converted at the ECB rate of 31 January 2025: 148,933,982 USD in total). It was the first judgment of the Federal Criminal Court on corporate criminal liability for foreign bribery; it is not final.
In Switzerland, companies are liable if their organisation fails to prevent bribery – and the compensatory claim can exceed the fine many times over.
Payments via intermediaries to employees of state-owned oil companies
- Authority / court
- Bundesstrafgericht (Strafkammer); Anklage durch die Bundesanwaltschaft
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 102 StGB i. V. m. Art. 322septies StGB (Bestechung fremder Amtsträger); SK.2023.49
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Energy and utilities
- Employees
- 10,000 or more
- Culpability
- intentional
- Published
- 31 Jan 2025
Original amount 148,933,982 USD, converted at the ECB reference rate of 31 Jan 2025.
- Bundesstrafgericht: Verurteilung einer juristischen und drei natürlicher Personen wegen Bestechung fremder Amtsträger (SK.2023.49) Court press release
- TRAFIGURA BEHEER BV und drei natürliche Personen vor Bundesstrafgericht angeklagt Press release of an authority
- Bundesstrafgericht, Dispositiv SK.2023.49 vom 31.01.2025 Court decision
Checked against the official source on 28 Sep 2026 · Version 3 · Direct link
Report an error
22 Nov 2024 a British biogas plant operatorBiogas plant: tank explodes during angle grinding; 304,500 GBP after joint HSE/EA prosecution €365,964
In 2017 two employees were cutting pipes with an angle grinder on top of an eleven-metre-high slurry tank without fall protection; sparks ignited gases, the tank exploded and both were seriously injured. There was no safe tank design, no risk assessments, no permit-to-work procedures, no training and no supervision, and the operator also breached its environmental permit; fines totalling 304,500 GBP plus 229,988 GBP in costs.
Carry out hot work on plant containing flammable gases only with a permit to work, gas testing and fall protection; having a permit on paper does not protect against liability.
Hot work and permit-to-work procedures in explosive atmospheres
Missing or inadequate training played a role in the decision.
- Authority / court
- Nottingham Crown Court (Anklage: Environment Agency und Health and Safety Executive)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Section 2(1) und 3(1) Health and Safety at Work etc. Act 1974; Regulation 38(2) Environmental Permitting Regulations 2016; Section 33(1)(c) Environmental Protection Act 1990
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Energy and utilities
- Employees
- Under 50
- Published
- 28 Nov 2024
Original amount 304,500 GBP, converted at the ECB reference rate of 22 Nov 2024.
- Company fined after an explosion seriously injured two employees (Environment Agency) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Company name anonymised since 22 Nov 2026 · Direct link
Report an error
19 Nov 2024 an electricity grid operator in OntarioGrid operator: CA$250,000 after contact with a live line €168,543
While copper conductors were being installed on a de-energised 44 kV line, a piece of conductor touched the uncovered 4.8 kV line running below it; a worker was seriously injured. The grid operator had not complied with the safety rules for work near energised equipment. Fine of CA$250,000 against the company (19 November 2024).
De-energising alone is not enough; adjacent lines that remain live must be covered.
Covering adjacent live parts
- Authority / court
- Provincial Offences Court Goderich (Ermittlung: Ontario Ministry of Labour, Immigration, Training and Skills Development)
- Area of law
- Health and safety and employment law · Workplace safety and accidents
- Legal basis
- Sections 181, 183 O. Reg. 213/91 (Construction Projects) i. V. m. s. 132 Electrical Utility Safety Rules; ss. 27(1)(a), 25(1)(c) Occupational Health and Safety Act (Ontario)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Energy and utilities
- Mitigating circumstances
- Guilty plea.
- Liability of senior managers
- Measures against individuals are not reported here.
- Published
- 15 Jan 2025
Original amount 250,000 CAD, converted at the ECB reference rate of 19 Nov 2024.
- Ontario Newsroom, Court Bulletin zu Hydro One Networks Inc. (Entscheidung 2024) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 3 · Company name anonymised since 19 Nov 2026 · Direct link
Report an error
1 Mar 2024 a Swiss commodities trading houseTrading house convicted: around 86.7 million CHF over corruption in Ecuador's oil business €90.5m
The Geneva-based commodities trading house failed to take all reasonable organisational precautions to prevent foreign public officials from being bribed on its behalf in connection with the Ecuadorian oil industry from 2013 to 2017. The Office of the Attorney General of Switzerland (BA) – in coordination with US authorities – ordered the trading house to pay around 86.7 million CHF, of which 4.3 million CHF is a fine.
Commodities traders must scrutinise payments to intermediaries in government business without gaps – the confiscation of profits far exceeds the fine.
Payments via intermediaries to state-owned oil companies
- Authority / court
- Bundesanwaltschaft (BA)
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 102 StGB (Unternehmensverantwortlichkeit) i. V. m. Bestechung fremder Amtsträger
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Energy and utilities
- Culpability
- intentional
- Published
- 1 Mar 2024
Original amount 86,700,000 CHF, converted at the ECB reference rate of 1 Mar 2024.
- Bundesanwaltschaft, Medienmitteilungen (Übersicht) (Entscheidung 2024) Press release of an authority
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 1 Mar 2026 · Direct link
Report an error
14 Dec 2023 a US commodities traderUS commodities trader: USD 98.6m for bribing officials of a Brazilian oil company €90.3m
The US commodities trader entered into a three-year DPA and pays a penalty of USD 68,000,000 and a forfeiture of USD 30,551,150, totalling USD 98,551,150. Between about 2012 and 2018 the trader and co-conspirators bribed officials of the state-controlled Brazilian oil company to obtain confidential pricing and bid information of competitors, concealing this through code words, encrypted messaging apps, sham negotiations and an intermediary with offshore accounts. Credits: up to one third of the penalty against payments in Brazil, up to 25% of the forfeiture against a separate CFTC disgorgement of more than USD 7.6 million. The authority allegedly made the findings set out here; this account is not based on a final judgment.
Anyone obtaining information from state-owned customers through intermediaries needs strict controls on intermediary payments and on the communication channels used.
Intermediaries in commodities trading, covert communication and confidential information of state-owned customers
- Authority / court
- U.S. Department of Justice (Criminal Division, Fraud Section)
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Foreign Corrupt Practices Act (FCPA): Verschwörung zum Verstoß gegen die Anti-Bribery-Vorschriften (Criminal Information, District of Connecticut)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Energy and utilities
- Mitigating circumstances
- Cooperation was recognised (including analysis of trade data on more than 4,000 transactions and employee interviews), but it was limited and reactive at first; 15% reduction off the bottom of the guidelines range.
- Liability of senior managers
- Measures against individuals are not set out here.
- Published
- 14 Dec 2023
Original amount 98,551,150 USD, converted at the ECB reference rate of 14 Dec 2023.
Checked against the official source on 14 Oct 2026 · Company name anonymised since 14 Dec 2025 · Direct link
Report an error
13 Oct 2023 a Dutch offshore construction companyNetherlands: EUR 27,000 fine on an offshore construction company as project crew worked up to 27 days in a row €27,000
The Dutch Minister of Social Affairs and Employment fined a Dutch company whose activities include building and maintaining offshore wind farms EUR 27,000: according to the findings of the mining regulator Staatstoezicht op de Mijnen (Dutch State Supervision of Mines), twelve members of a project crew working on the construction of an offshore wind farm had worked on more than 14 consecutive days between 23 November and 20 December 2022; eleven of them for 20 days and one for 27 days in a row. The company argued without success that the working time rules for seafarers applied to the crew, which worked mainly on a crane vessel; the competent court dismissed its appeal on 20 November 2025.
For offshore work, the nature of the work determines which working time rules apply: anyone working for a wind farm is subject to the stricter offshore rules, even if the crew works mainly on board a ship.
Maximum number of consecutive working days in offshore work
- Authority / court
- Minister van Sociale Zaken en Werkgelegenheid (Bußgeld; Aufsicht: Staatstoezicht op de Mijnen); bestätigt durch Rechtbank Rotterdam
- Area of law
- Health and safety and employment law · Working time
- Legal basis
- Arbeidstijdenwet; Art. 5.14:2 Abs. 3 i. V. m. Art. 5.17:2 Arbeidstijdenbesluit (Arbeit auf, von oder für einen Windpark auf See)
- Action
- Fine
- Status of proceedings
- unknown
- Sector
- Energy and utilities
- Published
- 1 Dec 2025
Checked against the official source on 2 Oct 2026 · Company name anonymised since 13 Oct 2025 · Direct link
Report an error
28 Jun 2023 a French and a British energy engineering company of the same groupPNF: CJIP with two energy engineering companies for €208.94m €208.9m
Two companies of a former energy engineering group concluded a CJIP (convention judiciaire d'intérêt public, French deferred prosecution agreement) with the Parquet national financier (PNF, French national financial prosecutor) over possible bribery of foreign public officials in connection with contracts concluded in 2008 and 2009 in Ghana and Equatorial Guinea. The French company pays a public interest fine of 54,146,000 EUR and the British company 154,792,000 EUR, allegedly 208,938,000 EUR in total; the agreement was validated on 28 June 2023.
In large contracts with state energy companies, intermediaries' contacts with public officials and their relatives must be scrutinised with particular care.
Bribery of foreign public officials in major energy projects
- Authority / court
- Parquet national financier (PNF); gerichtliche Validierung
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Art. 41-1-2 Code de procédure pénale (corruption d'agent public étranger)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Energy and utilities
- Published
- 28 Jun 2023
- Ministère de la Justice, Conventions judiciaires d'intérêt public (Übersicht) (Entscheidung 2023) Enforcement database of an authority
Checked against the official source on 14 Oct 2026 · Version 2 · Company name anonymised since 28 Jun 2025 · Direct link
Report an error
3 Nov 2022 a UK commodities traderUK commodities trader: around 276 million GBP in fines and confiscation for bribery to gain access to oil €316.9m
With the company's approval, agents and employees of the London oil trading division paid more than 25 million USD in bribes for preferential access to oil in Nigeria, Cameroon, Côte d'Ivoire, Equatorial Guinea, Ghana, South Sudan and Malawi. Following guilty pleas to seven counts, the court imposed fines of 182,935,392 GBP and a confiscation order of 93,479,338.95 GBP (276,414,730.95 GBP in total), plus 4,550,362 GBP in costs.
In commodities trading, access to cargoes determines profits – that is exactly where strict controls over agents and cash are needed.
Cash and agents in commodities trading
- Authority / court
- Serious Fraud Office (SFO); Southwark Crown Court
- Area of law
- Bribery and corruption · Bribery of public officials
- Legal basis
- Bribery Act 2010, s. 1 (fünf Fälle) und s. 7 (zwei Fälle); Proceeds of Crime Act 2002 (Confiscation)
- Action
- Fine
- Status of proceedings
- final
- Sector
- Energy and utilities
- Employees
- 10,000 or more
- Culpability
- intentional
- Published
- 3 Nov 2022
Original amount 276,414,730.95 GBP, converted at the ECB reference rate of 3 Nov 2022.
- SFO, Fallübersicht (Entscheidung 2022) Decision of an authority
- Judiciary of England and Wales, Entscheidungen (Übersicht) (Entscheidung 2022) Court decision
Checked against the official source on 28 Sep 2026 · Version 4 · Company name anonymised since 3 Nov 2024 · Direct link